Base Wide Urinal Replacement Site Visit Minutes.pdf
PDF 241 KB Posted
- Attached to
- Base Wide Urinal Replacement Federal contract opportunity
- Solicitation number
- W50S8U-21-B-0001
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sealed Bid OF 1419 Urinal.pdf | ||
| Sealed Bid Opening Sign In 21-B-0001_Redacted.pdf | ||
| 21-B-0001-0002 Modification.pdf | ||
| Pre-Bid RFI Basewide Urinal Replacement 04-27-2021.pdf | ||
| 21-B-0001-01 Modification.pdf | ||
| Pre-Bid RFI Basewide Urinal Replacement 04-13-2021.pdf | ||
| Site Visit Sign in Urinals 08 Apr 2021_Redacted.pdf | ||
| Urinal Replacement Pictures.pdf | ||
| Site Visit Slides Base Wide Urinal Replacement.pdf | ||
| Brand_Name_Justification Zurn1.2.pdf | ||
| Bid Bond Checklist Sealed Bid.pdf | ||
| 2020_EMS Commitment Statement.pdf | ||
| 21-B-0001.pdf | ||
| SOW - Urinal replacement 0.4.pdf | ||
| 138FW Safety and Accident Prevention Guide_2020.pdf | ||
| DBIDS Pre-Enroll_QR_CONUS.pdf | ||
| Compliance Checklist Sealed Bids.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS 138TH FIGHTER WING
9100 EAST 46TH STREET NORTH
TULSA OKLAHOMA 74115-1000
08 April 2021
MEMORANDUM FOR RECORD
SUBJECT: MINUTES OF PRE-PROPOSAL CONFERENCE AND SITE VISIT, SOLICITATION W50S8U-
21-B-0001, Base Wide Urinal Replacement
08 April 2021/0900/75 Minutes
1. The list of contractors attending the meeting is shown on the attached sign-in sheet. The following Government representatives attended the subject meeting:
Name Position Major Patrick Deering Deputy Base Civil Engineer MSgt David Hugueley Contract Specialist MSgt Christopher Dallas Technical Advisor
2. The following items were discussed during the Pre-proposal Conference:
a. The Contract period is 90 days. This includes all work to include cleanup and punch list.
We anticipate award of the contract in mid-September. Following receipt and approval of bonds we will hold a pre-construction conference and issue NTP.
b. Interested bidders must be registered in SAM. To register go to:
https://www.sam.gov/portal/public/SAM/. You will need your DUNS number register.
3. A power point slide presentation on the project specifics and the selection process was provided to all attendees. (Attached)
4. Questions must be submitted in writing via email, especially technical questions to:
138.FW.MSC@us.af.mil and daniel.r.tatro.civ@mail.mil .
DO NOT CONTACT the Design Engineers or the Government Engineers. All questions must be routed through the Contracting Office. All Contractor questions when answered will be posted to the website. If a question arises that will result in a change to the plans or specifications, an official amendment will be issued. All correspondence, questions and answers, amendments etc. will be issued or posted at beta.SAM.gov.
5. After meeting in the CE Classroom at Building 222 the attendees walked the areas of base included on the project..
6. Questions: No Questions were asked but the RFI process was explained. This process includes an e-mail to the contracting office at 138.FW.MSC@us.af.mil and daniel.r.tatro.civ@mail.mil
7. Any amendments that are issued will be posted to contracting opportunities at beta.sam.gov.
Contractors were advised to check the website frequently.
8. The pre-proposal conference and site visit concluded at 1015 hours.
DAVID A HUGUELEY, MSgt, ANG Contract Specialist
Attachments Sign-in Sheet Power Point Slides mailto:138.FW.MSC@us.af.mil mailto:138.FW.MSC@us.af.mil
| 2021-04-08T11:27:21-0500 | |
| HUGUELEY.DAVID.ALEXANDER.1239928702 |
File details come from the government source that posted it. Updated .