RFI 1.docx
DOCX document 16 KB Posted
- Attached to
- Installation Fence and Gate Repair Federal contract opportunity
- Solicitation number
- W50S8E23B0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF 1419-W50S8E23B0003.pdf | ||
| BID OPENING ATTENDANCE SHEET.jpg | JPG image | |
| OF 1419A.pdf | ||
| RFI 1 Schematics linked to Previous Fences Installation. THIS IS FOR RESEARCH AND INFORMATION ONLY.pdf | ||
| SF 30.pdf | ||
| 2096 LUNA RETURN TO MSG.pdf | ||
| PREBID Conference Slides Fence and Gate Repair.pptx | PPTX presentation | |
| pre bid attendance.jpg | JPG image | |
| pre bid attendence 2.jpg | JPG image | |
| W50S8E23B0003.pdf | ||
| W50S8E23B0003 Blank Vetting Form.xlsx | XLSX spreadsheet | |
| WKVB232001 - SOW-updated 1.pdf | ||
| WKVB212115 - Gate Replacement-UPDATED 1.pdf | ||
| W50S8E23B0003.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI #1 FENCE AND GATE W50S8E23B0003
1. Will the use of CE software be required for with of these CLINS? NO
2. What are the auto gate specific requirements?
a. 1.Must Slide gates up to 20k lbs.
b. 2.Must be programmable.
c. 3.Must open at 1-3 ft/s and 3ft/s in emergency mode.
d. 4. Must have a wide temperature range without a heater.
3. On page 23 of Project Name: Repair Multiple Fences Project #: WKVB232001 The following paragraph states that it is the contractors responsibility to include the cost to mitigate any site insufficiencies found using ground penetrating radar. How could we possibly know that prior to submitting a proposal?
Answer- If the site is insufficient in any way, mitigation of these deficiencies shall be included in the Contractor’s proposal.
4. Site Investigation: All dimensions within this scope of work and on any attachments are true dimensions. The Contractor shall field verify all measurements and configurations prior to start of work and identify underground utilities using ground-penetrating RADAR.
Answer- If the site is insufficient in any way, mitigation of these deficiencies shall be included in the Contractor’s proposal.
5. I do not see any specific gate operators mentioned or fence/gate specifications other than “to match existing”. Do you know if these need to be “Crash Rated” and if so, what is the crash rating required?
Answer-“The gate operators need to meet the specifications listed in the SOW. Not seeking any crash rating above what is cited in the SOW.”
6. What are the under pinning details for the fences both 8 foot near the main entrance area and the wire mesh areas.
Answer-We can provide the specifications and drawings for the black fence that is already installed noting that these are specific to a different project for a fence that needed to be crash-rated. I’ve asked the contractor who built the ballfield fence to provide details so maybe we can sit on this RFI
7. What are the gauge of the wire mesh fence of 8 foot fence- Answer-That said, the posts should be 4”x4”x #11 Gauge. They can contact B&McD for more specifics.
8. Please what is the gauge or material definitions of the posts of wire mesh fence Answer-Reliable Fence has provided a lot of the wire mesh fence around the base to include the ballfield fence
9. Please what are the posts definitions if any on the (square, rectangle and thickness/gauge of the material).
Answer- Burns and McDonnell designed the K-rated base exterior fence and specified the Ameristar fence components.