SF 30 Solicitation Amendment W50S8D20Q0002 0002.pdf
PDF 169 KB Posted
- Attached to
- Construct Running Track Federal contract opportunity
- Solicitation number
- W50S8D20Q0002
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bollard Detail.pdf | ||
| SF 30 Solicitation Amendment W50S8D20Q0002 0003.pdf | ||
| Pre-Proposal Conference Attendance Sheet.pdf | ||
| Pre-Proposal Conference Minutes.pdf | ||
| SF 30 Solicitation Amendment W50S8D20Q0002 0001.pdf | ||
| Statement of Work.pdf | ||
| Figure 1 - Track Layout.pdf | ||
| W50S8D20Q0002.pdf | ||
| Figure 2 - Track Cross Section.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
J
PAGE OF PAGES
1 7
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
17-Jul-2020
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(If applicable)
WHAY142005
6. ISSUED BY CODE W50S8D 7. ADMINISTERED BY (If other than item 6) CODE
USPFO NY 105 MISSION SUPPORT CONTRACTING
ONE MAGUIRE WAY BLDG 204
NEWBURGH NY 12550-5075
See Item 6
8. NAME AND ADDRESS OF CONT RACT OR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
W50S8D20Q0002
X 9B. DATED (SEE ITEM 11)
26-Jun-2020
10A. MOD. OF CONT RACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILIT Y CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENT S OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegramwhich includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNT ING AND APPROPRIAT ION DAT A (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACTS/ORDERS.
IT MODIFIES THE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONT RACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUT HORIT Y OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUT HORIT Y OF:
D. OTHER (Specify type of modification and authority)
E. IMPORT ANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPT ION OF AMENDMENT /MODIFICAT ION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This Amendment 0002 is being issued to incorporate a revised Statement of Work and to provide answ ers to RFI's that w ere asked during the pre-proposal conference and site visit.
This amendment must be acknow ledged - See Block 11 above.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONT RACTING OFFICER (Type or print)
TEL: EMAIL:
15B. CONT RACT OR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNIT ED ST AT ES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
17-Jul-2020
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
30-105-04 ST ANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The following have been modified: REVISED STATEMENT OF WORK
DEPARTMENT OF THE AIR FORCE
105 AIRLIFT WING (ANG)
ONE MAGUIRE WAY
NEWBURGH NY 12550-5075
1. Background
The 105th Airlift Wing requires a properly sited running track to carry out military personnel physical fitness requirements for all 105th AW members and members of the tenant Marines unit. The running portion of the fitness test currently takes place on the installation roadway which is undesirable. The lack of adequate shoulder or sidewalks makes this an obvious safety hazard which results in excess personnel utilized for traffic control. A new running track will be sited outside of the roadway near existing outdoor recreation facilities on base.
2. Scope
Contractor shall furnish all engineering, supervision, tools, parts, material, labor, supplies, permits, equipment and incidentals required to properly perform work outlined below. All work shall be performed in in a safe manner and shall be accomplished in accordance with all local, state, federal, and safety regulations to include any hazardous waste disposal if necessary.
All materials to be installed must be submitted and approved prior to installation.
3. Objectives
The Contractor shall design and install at a minimum but not limited to survey, excavation, grading, compaction, installation of track and associated safety features. This work, at a minimum, shall include:
A. Grading & Excavation
1. The Contractor shall observe FIGURE 1, attached herein, detailing the desired layout of the running track. The Contractor is not required to strictly adhere to the dimensions of the track layout on FIGURE 1, but the general configuration and total distance (1/4 mile) shall not be modified. The track along the baseball field fence shall be on the inside similar to a baseball field warning track. The outside edge of the track shall be installed directly adjacent to the existing fence within the baseball field foul lines.
2. The Contractor shall design and construct all grading necessary to achieve final sub-grade per the approved design. The surface and drainage requirements shall be in accordance with UFC 4-750-02N. To meet linear slope requirements a maximum elevation difference shall be 4 feet across the track surface.
3. All grading outside of the track width shall be graded at a maximum 3:1 slope to existing grade. All areas shall be stabilized upon achieving final grade.
4. Suitable and stable sub-grade shall be established, for any fills area this sub-grade shall be compacted to 95% compaction as determined by a modified proctor test. For all areas of cut, virgin soils shall be inspected and approved prior to installation of sub-base. All compaction testing shall be in accordance with ASTM standards.
5. Any existing drainage features shall be realigned, replaced or upgraded as necessary to maintain existing drainage patterns.
6. The contractor shall topsoil, seed, install starter fertilizer and protect all exposed areas upon completion of final grade. Seeding mixture shall be a raked in or rolled in perennial mix (no annual seed mix shall be accepted), seed mix shall be submitted and approved. A protective layer of straw or approved equal shall be applied over top of the seed mixture for moisture retention and erosion protection. Starter fertilizer shall be a 10-20-10 mix or approved equal. The contractor shall spread fertilizer per manufacturer recommendation for new grass.
B. Track Installation
1. The Contractor shall design and install, in accordance with all governing codes, all sub-base, asphalt binder course and surface material in accordance with FIGURE 2.
2. The base course shall be installed at a depth of 8” as shown on FIGURE 2. The base course shall gravel course meeting NYSDOT 304-2.02 or approved equal. The base course shall be compacted to a minimum of 95% compaction as determined by a modified proctor test.
3. A non-woven geotextile fabric shall be placed between the base and the asphalt binder course. Non-woven geotextile fabric shall meet ASTM D4632.
4. An asphalt binder course shall be installed at a depth of 3” and compacted to a minimum of 95% compaction as determined by a modified proctor test. The asphalt binder course shall be PG 70-22 or approved equal.
5. Compaction of all courses shall meet ASTM standards.
6. Asphalt binder course materials shall be cured in accordance with manufacturer’s specifications prior to placement of the synthetic track surface.
7. The thickness of the aliphatic waterborne synthetic track surfacing system shall be minimum 13mm.
8. All liquid materials shall be from a single source and manufactured for the purposeof resilient track construction.
9. The contractor shall record the batch number of each product used on the site and maintain it throughout the warranty period and provide a copy to the government.
10. Base mat waterborne synthetic track surfacing system components shall be processed and installed by specially designed machinery and equipment. A mechanically operated paver with variable regulated speed and thermostatically controlled screed shall be used in the installation of the base mat.
11. Base course SBR granules and polyurethane spray coating shall be mixed together on site to regulate the ratio/quantity of SBR, not to exceed 82% by weight in the base mat portion of the system. The single component polyurethane binder shall be mixed with the SBR rubber so that a minimum of 20%, by weight, exists in the final mixture. This mixture is then mechanically installed using the paver.
12. Wearing course SBR granules and polyurethane coating shall be mixed together on site to regulate the ratio/quantity of SBR, not to exceed 82% by weight in the base mat portion of the system. The single component polyurethane binder shall be mixed with the SBR rubber so that a minimum of 20%, by weight, exists in the final mixture. The wearing course shall be installed using automatic electronic portioning, which provides continuous mixing and feeding for an accurate, quality controlled installation.
13. Installation shall not take place if adjacent or concurrent construction generates excessive dust, abrasives or any other by-product that, in the opinion of the installer, would be harmful to the track material, until completion of such works. If, in the opinion of the installer of the synthetic material, the weather and/or climatic conditions are detrimental to the proper installation of the surfacing materials, work shall be delayed until conditions are acceptable. Installation shall be executed only in dry conditions.
14. Track surface color to be submitted and approved by contracting officer with track submittals.
C. Additional Site Features
1. The Contractor shall install bollards at 6 foot intervals, along vehicle transportation pathways directly adjacent to the running track to promote safety and inhibit snow stockpiling on the track surface.
2. The track shall be no less than 10’ wide with 2” striping along both shoulders to provide added safety features.
3. All line and event markings shall be applied in (1) one coat by experienced personnel utilizing the manufacturer’s recommended pigmented paint compatible with waterborne track surfacing material as required and specified by current NFHS, IAAF and NCAA rules.
4. Delivery
All parts and materials shall be new parts and materials, as manufactured or recommended by the manufacturer. Performance shall take place at the 105th Airlift Wing, Stewart ANGB, Newburgh, NY. The Performance Period shall be 75 days.
5. Pre-Construction Meeting
The Contractor shall be required to meet with the Contracting Office, BCE representative and other members as required prior to the commencement of any work in order to coordinate the project construction. Topics of discussion will include: Hours of work, lay-down and storage areas, work area limits, safety compliance, emergency notifications and any other topics deemed necessary by the Contracting Officer or Contracting Officer representative.
6. Government Furnished Property: None
7. Security
Contractors should be aware that this is a Military Installation and that all access to this installation is granted by the 105 AW Base Defense Squadron. The U.S. government will not be held liable for any delays or breach of contract caused by refusal of the 105th AW Base Defense Squadron. If a gate pass is not granted to a contractor allowing the delivery of goods, execution of warranty support, or performance of services please contact the contracting officer.
A contractor’s badge will be issued once The Contractor enters the main gate at Stewart Air National Guard Base. All employees are required to have the proper ID (social security card, driver’s license, state ID, immigration card, U.S. Passport, etc.). If they do not have the proper ID, they will be turned away. Vendors should be aware that Anti- Terrorism Force Protection Measures are applicable to this contract. Vendors will be briefed on these measures by Base Defense personnel if recurring or long term access is required to Stewart ANG Base.
Otherwise you will be escorted at all times by a member of Stewart ANG Base.
8. Safety Requirements
The Contractor shall comply with all Occupational Safety and Health Act (OSHA), federal, state, and local laws, regulations, and requirements regarding safety, as applicable to the services provided under this contract. In the event safety laws or regulations change during the term of this contract, The Contractor is required to comply as such laws come into effect.
8. Contractor Manpower Reporting
The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via data collection site. The contractor is required to completely fill in all required data field at http://www.ecmra.mil.
Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year, which runs 1 October through 30 September * of each calendar year. Contractor may direct questions to the CMRA help desk.
*Reporting Period: Contractors are required to input data by 31 October of each year.
Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
RFI'S
Q1. Will power and water be provided?
A1. Water and power will be available upon request.
Q2. Shall the backstop fencing be moved to accommodate the 10’ wide track or can the track run in front of the light post (existing paved surface)?
A2. Existing paved surface in front of light pole to be utilized. Relocating fence and light pole will not be required.
Q3. What shall contractor do with excess cut material?
A3. Excess material must be removed from the site/base.