SF 30 Solicitation Amendment W50S8D20Q0002 0001.pdf

PDF 220 KB Posted

Attached to
Construct Running Track Federal contract opportunity
Solicitation number
W50S8D20Q0002
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Construct Running Track, newest first.
File Type Posted
Bollard Detail.pdf PDF
SF 30 Solicitation Amendment W50S8D20Q0002 0003.pdf PDF
Pre-Proposal Conference Attendance Sheet.pdf PDF
Pre-Proposal Conference Minutes.pdf PDF
SF 30 Solicitation Amendment W50S8D20Q0002 0002.pdf PDF
Statement of Work.pdf PDF
Figure 1 - Track Layout.pdf PDF
W50S8D20Q0002.pdf PDF
Figure 2 - Track Cross Section.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WHAY142005

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This Amendment 0001 is being issued to incorporate an updated Wage Determination, General Decision Number NY20200007 Modification Number 6 dated 07/03/2020 and to incorporate a reivised Statement of Work.

This amendment must be acknow ledged - See Block 11 above.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 35

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Jul-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S8D20Q0002

X 9B. DATED (SEE ITEM 11)

26-Jun-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

14-Jul-2020

CODE

USPFO NY 105 MISSION SUPPORT CONTRACTING

ONE MAGUIRE WAY BLDG 204

NEWBURGH NY 12550-5075

W50S8D 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been added by full text:

REVISED STATEMENT OF WORK

DEPARTMENT OF THE AIR FORCE

105 AIRLIFT WING (ANG)

ONE MAGUIRE WAY

NEWBURGH NY 12550-5075

1. Background

The 105th Airlift Wing requires a properly sited running track to carry out military personnel physical fitness requirements for all 105th AW members and members of the tenant Marines unit. The running portion of the fitness test currently takes place on the installation roadway which is undesirable. The lack of adequate shoulder or sidewalks makes this an obvious safety hazard which results in excess personnel utilized for traffic control. A new running track will be sited outside of the roadway near existing outdoor recreation facilities on base.

2. Scope

Contractor shall furnish all engineering, supervision, tools, parts, material, labor, supplies, permits, equipment and incidentals required to properly perform work outlined below. All work shall be performed in in a safe manner and shall be accomplished in accordance with all local, state, federal, and safety regulations to include any hazardous waste disposal if necessary.

All materials to be installed must be submitted and approved prior to installation.

3. Objectives

The Contractor shall design and install at a minimum but not limited to survey, excavation, grading, compaction, installation of track and associated safety features.

This work, at a minimum, shall include:

A. Grading & Excavation

1. The Contractor shall observe FIGURE 1, attached herein, detailing the desired layout of the running track. The Contractor is not required to strictly adhere to the dimensions of the track layout on FIGURE 1, but the general configuration and total distance (1/4 mile) shall not be modified. The track along the baseball field fence shall be on the inside similar to a baseball field warning track. The outside edge of the track shall be installed directly adjacent to the existing fence within the baseball field foul lines.

2. The Contractor shall design and construct all grading necessary to achieve final sub-grade per the approved design. The surface and drainage requirements shall be in accordance with UFC 4-750-02N. To meet linear slope requirements a maximum elevation difference shall be 4 feet across the track surface.

3. All grading outside of the track width shall be graded at a maximum 3:1 slope to existing grade. All areas shall be stabilized upon achieving final grade.

4. Suitable and stable sub-grade shall be established, for any fills area this sub-grade shall be compacted to 95% compaction as determined by a modified proctor test. For all areas of cut, virgin soils shall be inspected and approved prior to installation of sub-base. All compaction testing shall be in accordance with ASTM standards.

5. Any existing drainage features shall be realigned, replaced or upgraded as necessary to maintain existing drainage patterns.

6. The contractor shall topsoil, seed, install starter fertilizer and protect all exposed areas upon completion of final grade. Seeding mixture shall be a raked in or rolled in perennial mix (no annual seed mix shall be accepted), seed mix shall be submitted and approved. A protective layer of straw or approved equal shall be applied over top of the seed mixture for moisture retention and erosion protection. Starter fertilizer shall be a 10-20-10 mix or approved equal. The contractor shall spread fertilizer per manufacturer recommendation for new grass.

B. Track Installation

1. The Contractor shall design and install, in accordance with all governing codes, all sub-base, asphalt binder course and surface material in accordance with FIGURE 2.

2. The base course shall be installed at a depth of 8” as shown on FIGURE 2. The base course shall gravel course meeting NYSDOT 304-2.02 or approved equal. The base course shall be compacted to a minimum of 95% compaction as determined by a modified proctor test.

3. A non-woven geotextile fabric shall be placed between the base and the asphalt binder course. Non-woven geotextile fabric shall meet ASTM D4632.

4. An asphalt binder course shall be installed at a depth of 3” and compacted to a minimum of 95% compaction as determined by a modified proctor test. The asphalt binder course shall be PG 70-22 or approved equal.

5. Compaction of all courses shall meet ASTM standards.

6. Asphalt binder course materials shall be cured in accordance with manufacturer’s specifications prior to placement of the synthetic track surface.

7. The thickness of the aliphatic waterborne synthetic track surfacing system shall be minimum 13mm.

8. All liquid materials shall be from a single source and manufactured for the purpose of resilient track construction.

9. The contractor shall record the batch number of each product used on the site and maintain it throughout the warranty period and provide a copy to the government.

10. Base mat waterborne synthetic track surfacing system components shall be processed and installed by specially designed machinery and equipment. A mechanically operated paver with variable regulated speed and thermostatically controlled screed shall be used in the installation of the base mat.

11. Base course SBR granules and polyurethane spray coating shall be mixed together on site to regulate the ratio/quantity of SBR, not to exceed 82% by weight in the base mat portion of the system. The single component polyurethane binder shall be mixed with the SBR rubber so that a minimum of 20%, by weight, exists in the final mixture. This mixture is then mechanically installed using the paver.

12. Wearing course SBR granules and polyurethane coating shall be mixed together on site to regulate the ratio/quantity of SBR, not to exceed 82% by weight in the base mat portion of the system. The single component polyurethane binder shall be mixed with the SBR rubber so that a minimum of 20%, by weight, exists in the final mixture. The wearing course shall be installed using automatic electronic portioning, which provides continuous mixing and feeding for an accurate, quality controlled installation.

13. Installation shall not take place if adjacent or concurrent construction generates excessive dust, abrasives or any other by-product that, in the opinion of the installer, would be harmful to the track material, until completion of such works. If, in the opinion of the installer of the synthetic material, the weather and/or climatic conditions are detrimental to the proper installation of the surfacing materials, work shall be delayed until conditions are acceptable. Installation shall be executed only in dry conditions.

14. Track surface color to be submitted and approved by contracting officer with track submittals.

C. Additional Site Features

1. The Contractor shall install bollards at 6 foot intervals, along vehicle transportation pathways directly adjacent to the running track to promote safety and inhibit snow stockpiling on the track surface.

2. The track shall be no less than 10’ wide. A typical lane is 2’-4” in width.

Therefore, 4 lanes are required that would equal ± 9’-4” total, leaving ± 8” excess for shoulder.

3. 2” white lane markings shall be painted onto the track surface once the track surface has cured in accordance with manufacturers specifications.

4. All line and event markings shall be applied in (1) one coat by experienced personnel utilizing the manufacturer’s recommended pigmented paint compatible with waterborne track surfacing material as required and specified by current NFHS, IAAF and NCAA rules.

5. Delivery

All parts and materials shall be new parts and materials, as manufactured or recommended by the manufacturer. Performance shall take place at the 105th Airlift Wing, Stewart ANGB, Newburgh, NY. The Performance Period shall be 75 days.

6. Pre-Construction Meeting

The Contractor shall be required to meet with the Contracting Office, BCE representative and other members as required prior to the commencement of any work in order to coordinate the project construction. Topics of discussion will include: Hours of work, lay-down and storage areas, work area limits, safety compliance, emergency notifications and any other topics deemed necessary by the Contracting Officer or Contracting Officer representative.

7. Government Furnished Property: None

8. Security

Contractors should be aware that this is a Military Installation and that all access to this installation is granted by the 105 AW Base Defense Squadron. The U.S. government will not be held liable for any delays or breach of contract caused by refusal of the 105th AW Base Defense Squadron. If a gate pass is not granted to a contractor allowing the delivery of goods, execution of warranty support, or performance of services please contact the contracting officer.

W50S8D20Q0002

A contractor’s badge will be issued once The Contractor enters the main gate at Stewart Air National Guard Base. All employees are required to have the proper ID (social security card, driver’s license, state ID, immigration card, U.S. Passport, etc.). If they do not have the proper ID, they will be turned away. Vendors should be aware that Anti- Terrorism Force Protection Measures are applicable to this contract. Vendors will be briefed on these measures by Base Defense personnel if recurring or long term access is required to Stewart ANG Base. Otherwise you will be escorted at all times by a member of Stewart ANG Base.

9. Safety Requirements

The Contractor shall comply with all Occupational Safety and Health Act (OSHA), federal, state, and local laws, regulations, and requirements regarding safety, as applicable to the services provided under this contract. In the event safety laws or regulations change during the term of this contract, The Contractor is required to comply as such laws come into effect.

8. Contractor Manpower Reporting

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via data collection site. The contractor is required to completely fill in all required data field at http://www.ecmra.mil.

Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year, which runs 1 October through 30 September * of each calendar year. Contractor may direct questions to the CMRA help desk.

*Reporting Period: Contractors are required to input data by 31 October of each year.

Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

WAGE DETERMINATION

"General Decision Number: NY20200007 07/03/2020

Superseded General Decision Number: NY20190007

State: New York

Construction Types: Building, Heavy and Highway

Counties: Dutchess, Orange, Sullivan and Ulster Counties in New York.

BUILDING CONSTRUCTION PROJECTS FOR ALL COUNTIES EXCEPT

SULLIVAN (does not include single family homes and apartment up to and including 4 stories), HEAVY AND HIGHWAY CONSTRUCTION

PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 02/07/2020 2 02/28/2020 3 04/03/2020 4 05/01/2020

5 06/12/2020 6 07/03/2020

ASBE0040-003 05/01/2019

SULLIVAN AND ULSTER COUNTIES

Rates Fringes

HAZARDOUS MATERIAL HANDLER

Duties limited to preparation wetting;

stripping; removal;

scrapping; vacuuming;

bagging; and disposing of all insulation materials whether they contain asbestos or not from mechanical systems..........$ 36.04 21.92 Insulator/asbestos worker (includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems)....................$ 36.04 21.92

ASBE0091-002 05/27/2019

DUTCHESS AND ORANGE COUNTIES

Rates Fringes

HAZARDOUS MATERIAL HANDLER

Duties limited to preparation, wetting, stripping, removal scrapping, vacuuming, bagging and disposing of all insulation materials;

whether they contain asbestos or not from mechancial systems..........$ 42.62 40.85 Insulator/asbestos worker (Includes application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)....................$ 42.62 40.85

BOIL0005-001 01/01/2017

Rates Fringes

BOILERMAKER......................$ 55.23 33%+24.12+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve

BRNY0005-001 06/01/2019

Rates Fringes

BRICKLAYER (BUILDING

CONSTRUCTION)

DUTCHESS, ORANGE

(Excluding the town of Tuxedo) and ULSTER COUNTIES Bricklayers, Cement Masons, Plasterers, Stone Masons.....................$ 42.09 34.50 ORANGE COUNTY (Town of Tuxedo) Bricklayers, Cement Masons, Plasterers, Stone Masons.....................$ 42.59 34.50

BRICKLAYER (HEAVY

CONSTRUCTION)

DUTCHESS, ORANGE

(Excluding the town of Tuxedo) and ULSTER COUNTIES Bricklayers, Cement Masons, Plasterers, Stone Masons.....................$ 41.31 33.94 ORANGE COUNTY (Town of Tuxedo) Bricklayers, Cement Masons, Plasterers, Stone Masons.....................$ 42.59 34.50

BRICKLAYER (HIGHWAY

CONSTRUCTION)

DUTCHESS, ORANGE

(Excluding the town of Tuxedo), SULLIVAN and

ULSTER COUNTIES

Bricklayers, Cement Masons, Plasterers, Stone Masons.....................$ 42.59 34.50

CARP0279-005 07/01/2019

Rates Fringes

Carpenters:

BUILDING CONSTRUCTION

Carpenters, Millwrights, Pile Drivers...............$ 38.09 29.08

HEAVY & HIGHWAY

CONSTRUCTION

Carpenters, Millwrights, Pile Drivers...............$ 38.09 29.08

* CARP0740-002 07/01/2020

DUTCHESS AND ORANGE COUNTIES

Rates Fringes

MILLWRIGHT.......................$ 44.25 39.91

* CARP1556-005 07/01/2020

DUTCHESS AND ORANGE COUNTIES

Rates Fringes

Diver Tender.....................$ 50.34 51.79 Diver............................$ 70.80 51.79 Dock Builder & Piledrivermen.....$ 55.93 51.79

ELEC0363-001 04/01/2020

Rates Fringes

ELECTRICIAN

DUTCHESS (Remaining Townships), ULSTER AND SULLIVAN COUNTIES...........$ 42.00 3%+32.36+a ORANGE and DUTCHESS (Townships of Fishkill, East Fishkill and Beacon) COUNTIES....................$ 46.00 3%+32.36+a

FOOTNOTE:

a. Paid Holidays: New Year's Day, President's Day, Memorial Day, Fourth of July, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day

ELEC1249-002 05/06/2019

Rates Fringes

ELECTRICIAN (LINE

CONSTRUCTION-LIGHTING AND

TRAFFIC SIGNAL INCLUDING ANY

AND ALL FIBER OPTIC CABLE

NECESSARY FOR THE TRAFFIC

SIGNAL SYSTEMS, AND TRAFFIC

MONITORING SYSTEMS, ROAD

WEATHER INFORMATION SYSTEMS)

Flagman.....................$ 27.77 6.75%+24.15 Groundman (Digging Machine Operator)...................$ 41.65 6.75%+24.15 Groundman (Truck Driver)....$ 37.02 6.75%+24.15 Groundman Truck Driver (Tractor Trailer Unit)......$ 37.02 6.75%+24.15 Lineman and Technician......$ 46.28 6.75%+24.15 Mechanic....................$ 37.02 6.75%+24.15

PAID HOLIDAYS:

a. Memorial Day, New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.

ELEC1249-004 05/06/2019

ELECTRICIAN (Line Construction) Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :

Flagman....................$ 31.23 6.75%+24.15 Groundman digging machine operator...................$ 46.85 6.75%+24.15 Groundman truck driver (tractor trailer unit).....$ 41.64 6.75%+24.15 Groundman Truck driver.....$ 41.64 6.75%+24.15 Lineman and Technician.....$ 52.05 6.75%+24.15 Mechanic...................$ 41.64 6.75%+24.15 Substation:

Cable Splicer..............$ 57.26 6.75%+24.15 Flagman....................$ 31.23 6.75%+24.15 Ground man truck driver....$ 41.64 6.75%+24.15 Groundman digging machine operator...................$ 46.85 6.75%+24.15 Groundman truck driver (tractor trailer unit).....$ 41.64 6.75%+24.15 Lineman & Technician.......$ 52.05 6.75%+24.15 Mechanic...................$ 41.64 6.75%+24.15 Switching structures;

railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation Cable Splicer..............$ 58.71 6.75%+24.15 Flagman....................$ 32.02 6.75%+24.15 Groundman Digging Machine Operator...................$ 48.03 6.75%+24.15

Groundman Truck Driver (tractor-trailer unit).....$ 42.70 6.75%+24.15 Groundman Truck Driver.....$ 42.70 6.75%+24.15 Lineman & Technician.......$ 53.37 6.75%+24.15 Mechanic...................$ 42.70 6.75%+24.15

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial Day, Good Friday, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day for the President of the United States and Election Day for the Governor of New York State, provided the employee works two days before or two days after the holiday.

ELEC1249-005 05/06/2019

SULLIVAN COUNTY

Rates Fringes

ELECTRICIAN (LIGHTING AND

TRAFFIC SIGNAL LINEMAN

INCLUDING ANY AND ALL FIBER

OPTIC CABLE NECESSARY FOR THE

TRAFFIC SIGNAL SYSTEM,

TRAFFIC MONITORING SYSTEMS

AND ROAD WEATHER INFORMATION

SYSTEMS.)

Flagman.....................$ 27.00 6.75%+24.15 Groundman (Digging Machine Operator)...................$ 40.50 6.75%+24.15 Groundman (Truck Driver)....$ 36.00 6.75%+24.15 Groundman Truck Driver (tractor trailer unit)......$ 36.00 6.75%+24.15 Lineman & Technician........$ 45.00 6.75%+24.15 Mechanic....................$ 36.00 6.75%+24.15

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, plus President's Day, Good Friday, Decoration Day, Election Day for the President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.

ELEC1249-008 01/01/2019

Rates Fringes

ELECTRICIAN (Line Construction)

TELEPHONE, CATV

FIBEROPTICS CABLE AND

EQUIPMENT

Cable splicer..............$ 32.78 3%+4.93 Groundman..................$ 16.49 3%+4.93 Installer Repairman- Teledata

Lineman/Technician- Equipment Operator.........$ 31.12 3%+4.93 Tree Trimmer................$ 25.79 3%+9.98+a

a. New Year's Day, President's Day, Good Friday, Decoration Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day.

ELEV0138-001 01/01/2020

Rates Fringes

ELEVATOR MECHANIC................$ 60.49 34.765+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0106-004 07/01/2018

NORTHERN PART OF DUTCHESS (To The Northern Boundary line of the City of Poughkeepsie)

Power Equipment Operator

HEAVY & HIGHWAY

GROUP 1....................$ 43.47 26.05+a GROUP 2....................$ 42.56 26.05+a GROUP 3....................$ 39.99 26.05+a GROUP 4....................$ 47.47 26.05+a GROUP 5....................$ 46.47 26.05+a GROUP 6....................$ 45.47 26.05+a GROUP 7....................$ 45.08 26.05+a

POWER EQUIPMENT OPERATORS HEAVY & HIGHWAY CLASSIFICATIONS

GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual Drum Paver, Excavator (All Purpose Hydraulically Operated) (Gradall or Similar), Front End Loader ( 4 cu. yd. and Over), Head Tower (Sauerman or Equal), Hoist (Two or Three Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB-4 and similar type, Power Grader, Profiler (over 105 H.P.)

Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Form Tamper, Grout Pump, Gunite Machine, Hammers (Hydraulic self-propelled), Hydra-Spiker, ride-on, Hydraulic Pump (jacking system), Hydro-Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType Loader, Truck or Trailer Mounted Log , Chipper (Self Feeder), Tug Operator (Manned Rented Equipment Excluded), Tunnel Shovel

GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary Drill (Truck or Tractor Mounted), Boring Machine, Cage Hoist, Central Mix Plant (NonAutomated) and All Concrete Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self-contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication Engineer, HiPressure Boiler (15 lbs. and over), Hoist (One Drum), Hydro-Axe, Kolman Plant Loader and Similar Type Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant Engineer, Profiler (105 H.P. and under), Grinder, Post Hole Digger and Post Driver, Power Broom (towed), Power Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride-on, Shell Winder, Skid steer loader (Bobcat or similar), Span-Saw, ride-on, Steam Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant Refrigeration Equipment (for soil stabilization)Road Widener, Roller (all above subgrade), Sea Mule, Self-contained Ride-on Rock Drill, Excluding Air-Track Type Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.

Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat

GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride-on Boiler (used in conjunction with production), Bituminous Heater, self-propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Fork Lift, Generators, Pumps, Welding Machines, Light Plants, Heaters (hands-off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or Mixer (16S and under), Concrete Saw (self-propelled), Conveyor, Deck Hand, Directional Drill Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride-on, Tie Extractor, ride-on, Tie Handler, ride-on, Tie Inserter, ride-on, Tie Spacer, ride-on, Tire Repair, Track Liner, ride-on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point

GROUP 4: Tower Cranes

GROUP 5: Cranes 50 tons and over

GROUP 6: Cranes 49 tons and below

GROUP 7: Master Mechanic

FOOTNOTES:

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence

Day, Labor Day, Thanksgiving Day, and Christmas Day

ENGI0106-008 07/01/2018

NORTHERN PART OF DUTCHESS (TO THE NORTHEN BOUNDARY LINE OF THE

CITY OF POUGHKEEPSIE) BUILDING CONSTRUCTION

Power equipment operators:

GROUP A(1)..................$ 43.79 25.70+a 1..........................$ 45.04 25.70+a 2..........................$ 46.04 25.70+a GROUP A.....................$ 43.30 25.70+a GROUP B.....................$ 42.28 25.70+a GROUP C.....................$ 39.38 25.70+a

Hazardous work - Anytime Operating Engineers are involved with level C or above, $2.50 per hour over regular rate.

FOOTNOTE:

a. Paid Holiday: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP A(1): Crane, hydraulic cranes, tower crane, locomotive crane, piledriver, cableway, derricks, whirlies, dragline, boom truck (over 5 tons)

GROUP A(1): Crane Premiums

1 over 150' :add $1.00 2 over 200': add $2.00

GROUP A: Shovel, All excavator (except tractor mounted rubber tired John Deere 510 or smaller), gradalls, power road grader, all CMI equipment, front-end rubber tire loader, tractor-mounted drill (quarry master), mucking machine, concrete central mix plant, concrete pump, Belcrete system, automated asphalt concrete plant and tractor road paver, boom truck (5 tons and under).

GROUP B: Backhoe, (tractor mounted rubber tired equivalent to John Deere 510 or less), bulldozer, pushcat, tractor, traxcavator, scraper, LeTourneau grader, form fine grader, road roller, blacktop roller, blacktop spreader, power brooms, sweepers, trenching machine, Barber Green loader, side booms, hydrohammer, concrete spreader, concrete finishing machine, one drum hoist, power hosting (single drum), hoist - two drum or more, three drum engine, power hoisting (two drum and over), two drum and swinging engine, three drum swinging engine, hod hoist, A-L frame winches, cord and well drillers (one drum), post hole digger, model CHB Vibro-Tamp or similar machine, batch bin and plant operator, dinkey locomotive, skid steer loader, track excavator 5/8 cu. yd. or smaller.

GROUP C: Fork lift, high lift, lull, Oiler, fireman and heavy- duty greaser, boilers, and steam generators, pump, vibrator, motor mixer, air compressor, dust collector, welding machine, well point, mechanical heater, generators, temporary light plants, concrete pumps, electric submersible pump 4"" and over, murphy type diesel generator, conveyor, elevators, concrete mixer and belcrete power pack (belcrete system), seeding, and mulching machines, pumps.

ENGI0137-001 03/06/2017

DUTCHESS COUNTY (POUGHKEEPSIE AND SOUTH THEREOF)

BUILDING CONSTRUCTION

Power Equipment Operator GROUP 1A....................$ 53.95 28.52+a GROUP 1B....................$ 49.68 28.52+a GROUP 2A....................$ 52.03 28.52+a GROUP 3A....................$ 50.11 28.52+a GROUP 3B....................$ 47.67 28.52+a GROUP 4A....................$ 49.60 28.52+a GROUP 4B....................$ 41.85 28.52+a GROUP 5.....................$ 45.17 28.52+a GROUP 5A....................$ 56.63 28.52+a GROUP 5B....................$ 42.83 28.52+a GROUP 6.....................$ 44.92 28.52+a

NOTES: Hazmat: 20% above regular rate Pumping operation Premium .50

Crane Operators (100-149 ft) 2.00

Crane Operators (149 ft +) 3.00

Loader Operators (over 5 cu y) .50 Shovel Operators (over 4 cu yd)1.00

FOOTNOTE:

a. New Years Day, Memorial Day, Independence Day, Labor Day Thanksgiving Day, Christmas Day, plus Lincoln's Birthday, Washington's Birthday, Good Friday, Columbus Day, November Election Day, Veteran's Day.

POWER EQUIPMENT OPERATORS CLASSIFICATION

GROUP 1-A: Carrier- trailer horse; concret-portable hoist;

crane & hoist engineer-steel (concrete, material, super structure sub- structure); derrick (stone-steel); elevator & cage; hoist- single/double or triple drum; hoist-portable mobile unit; hoist engineer-concert (crane-derrick-mine hoist); hoist engineer- material; overhead crane; power house plant; telephies (cableway); whirly; maintenance engineer; Lull hilift or similar; hydraulic crane 25 ton and over; cherry picker 25 tons and over; backhoe Oliver 88; fordson; dynahoe; dual purpose and similar machines;

Barber Green Loader-euclid loader or similar type; conway or similar mucking macking machines; dragline; gradall;

shovel; backhoe etc. (crawler or truck); front end loaders;

hydraulic boom; jersey spreader; lift slab console;

letournequ or tounapull (scrapers over 20 yds struck);

mucking machines; pavement breaker (air ram); paver (concrete); road boring machine; road mix machines; ross carrier and similar machines; post hole digger; shovel (tunnels); side boom; spreader (asphalt);

scoopmobile-tractor-shovel over 1 1/2 yds. trenching machines vermeer concrete saw trencher and similar; tractor type demolition equipment; winch truck (a frame); hydraulic crane over 10 ton up to 25 ton); cherry picker over 10 ton up to 25 ton)

GROUP 1-B: Compressor (steel erection); pulse meter and push button buzz box; elevator; mechanic (outside) all types;

welder; scrapers 20 yds struck and under; machine pulling sheep's foot roller; vibratory rollers; roller 4 tons and over.

GROUP 2-A: Compactor self-propelled; grader; bulldoze D7 and similar tractors with a draw bar horsepower of 100 or over;

bulldozer D6 and under; welder; scraper 20 yds struck and under; machine pulling sheep's foot roller; vibratory rollers.

GROUP 3-A: Asphalt plant; boiler (high pressure); concrete mixing plants; concrete pump; firemen; forklift; forklift (electric); joy drill or similar tractor drilling machine;

loader - 1 1/2 yards and under; locomotive (all sizes);

mixer concrete - 21E and over; portable asphalt plant;

portable batch plant; portable crusher; quarry master;

stone crusher; well drilling machine and well point system;

cherry picker under 10 tons; hydraulic crane under 10 tons;

concert buffy; one yard an up ride on dumper (benford or similar).

GROUP 3-B: Compressor over 125 cu. feet; conveyor belt machine regardless of size; lighting unit (portable & generator); welding machine (steel erection and excavation); and compressor plant; stud machine; ladder hoist.

GROUP 4-A: Air tractor drill; batch plant; bending machine;

concrete breaker; concrete spreader; curb cutter machine;

farm tractor (all types); finishing machine-concrete;

hepavac clean air machine (all similar types: removal of asbestos etc.); material hopper-sand-stone-cement;

mixer-concrete-under 21E; mulching grass spreader;

pump-gypsum, etc., pump-plaster-grout -fireproofing; shop mechanic (not employed on job site); roller under 4 ton;

spreading and fine grading machine; steel cutting machine;

syphon pump-air-steam; tar joint machine; turbo jet burner or similar equipment; vibrator (1 to 5); fine grading machine; roof hoist (tugger hoist); television cameras-water- sewer-gas-etc.

GROUP 4-B: Compressor to 125 feet; dust; dust collector;

heater all types; pump; pump station (water and sewer);

steam jenny; sweeper; chipper; mulcher.

GROUP 5: Motorized roller (walk behind)

GROUP 5-A: Master Mechanic

GROUP 5-B: Utility Man

GROUP 6: Warehouse Man

ENGI0137-007 03/06/2017

Poughkeepsie and South thereof

Rates Fringes

Power Equipment Operator

(HEAVY & HIGHWAY)

GROUP 1.....................$ 58.54 28.15+a GROUP 1-A...................$ 51.68 28.15+a GROUP 1-B...................$ 54.42 28.15+a GROUP 2-A...................$ 49.52 28.15+a GROUP 2-B...................$ 51.05 28.15+a GROUP 3.....................$ 48.67 28.15+a GROUP 4-A...................$ 44.29 28.15+a GROUP 4-B...................$ 38.13 28.15+a GROUP 5.....................$ 54.69 28.15+a GROUP 5-A-1.................$ 54.69 28.15+a GROUP 5-A-2.................$ 66.22 28.15+a GROUP 5-A-3.................$ 63.97 28.15+a GROUP 5-A-4.................$ 60.03 28.15+a GROUP 5-A-5.................$ 50.65 28.15+a

POWER EQUIPMENT OPERATORS CLASSIFICATIONS (HEAVY & HIGHWAY)

GROUP 1: Boom Truck; Cherry Picker; Clamshell; Crane, (Crawler, Truck); Dragline; Rough Terrain Crane

GROUP 1-A: Auger; Auto Grader; Dynahoe and Dual purpose and similar machines; Boat Captain; Boring Machine (all types);

Bull Dozer-all sizes; Central Mix Plant Operator;

Chipper-all types; Close circuit t.v.; Compactor with Blade; Concrete Portable Hoist; C.M.I. or similar; Conway or similar mucking machines; Gradall, Shovel Backhoe, etc.

Grader; Derrick, (Stone- Steel; Elevator & cage, materials or passengers; Front end loaders over 1 1/2 yds.; Hoist Single, Double, Triple Drum, Hoist Portable Mobile Unit;

Hoist Engineer-Concrete (Crane-Derrick-Mine Hoist); Hoist Engineer-Material, Hydraulic Boom; Letourneau or Tournapull (Scrapers over 20 yds. struck); Log Skidder; Movable Concrete Barrier Transfer & Transport Vehicle; mucking machines; overhead crane; paver (conccrete); pulsemeter;

push button (buzz box) elevator; road mix machines; Robot Hammer (brock or similar), Ross carrier and similar machines; shovels (tunnels); side boom; Slip Form Machine;

spreader (asphalt); scoopmobile-tractor-shovel over 1 1/2 yards; trenching machines; telephies- vermeer concrete saw trencher and/or similar; tractor-type demolition equipment, Whirly

GROUP 1-B: Road Paver, Asphalt

GROUP 2-A: Ballast Regulators; Compactor self-propelled; Cow Tracks; Fusion Machine; Rail Anchor Machines; Roller 4 ton and over; Scrapers - 20 yards struck; Switch Tampers;

Vibratory roller, etc.

GROUP 2-B: Mechanic (outside) all types

GROUP 3-A: Air tractor drill; asphalt plant; batch plant;

boiler (high pressure; concrete breaker; concrete pump concrete spreader; curb cutter machine; farm tractor (all types); finishing machine (concrete); fine grading machine;

fireman; forklift; forklift (electric); joy drill or similar tractor drilling machine; loader - 1 1/2 yards and under; locomotive (all sizes), maintenance engineer;

machine pulling sheeps foot roller; material hopper; mixer concrete - 21-E and over; mulching grass spreader; portable asphalt plant, portable batch plant, portable crusher;

powerhouse plant; quarry master; roller under 4 ton;

spreading and fine grading machine; steel cutting machine;

stone crusher; sweeper; turbojet burner or similar; well drilling machine ; winch truck ""A"" frame. John Henry Drill or similar.

GROUP 4-A: Service men (fuel or grease truck).

GROUP 4-B: Oiler; Compressor - compressor plant; paint compressor-steel erection; conveyor belt machine; lighting unit (portable & generator); oiler; pumps - pump station-water-sewer- gypsum- plaster, etc.;

roller-motorized (walk-behind); welding machine (steel erection excavation); well point system; bending machine;

dust collector; mixer - concrete under 21-E; heater all types; steam jenny; syphon pump-air-steam; tar joint machine; vibrator (1 to 5); Compressor Truck Mounted (2-6)

GROUP 5: Oiler GROUP 5-A-1: Master Mechanic

GROUP 5-A-2: Engineer - all tower cranes, all climbing cranes and all cranes of 100 ton capacity or greater (3900 Manitowac or similar) irrespective of manufacturer and regardless of how the same is rigged (except for pile rigs).

GROUP 5-A-3: Engineer-- Pile Driver

GROUP 5-A-4: Hoist Engineer- Steel -Sub Structure

GROUP 5-A-5: Jersey-spreader, pavement breaker (air ram);

Post Hole Digger

NOTES:

Loader Operator (over 5 cu yds) .50 Shoval Operators (over 4 cu yd) 1.00 Hazmat premium over regular rate 20%

CRANES:

100 ft- 149 ft: receive $2.00 more than Group 1 rate 149 ft and over receive $3.00 more than Group 1 rate

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day; Lincoln's Birthday; Good Friday; Memorial Day; Independence Day; Labor Day; Veterans Day; Columbus Day; November Election Day; Thanksgiving Day;

and Christmas Day

ENGI0825-007 01/01/2018

ORANGE, ULSTER AND SULLIVAN COUNTIES

Rates Fringes

Power Equipment Operator

BUILDING, HEAVY & HIGHWAY

GROUP 1....................$ 50.57 30.30

GROUP 2....................$ 48.98 30.30

GROUP 3....................$ 47.07 30.30

GROUP 4....................$ 45.44 30.30

GROUP 5....................$ 43.73 30.30

GROUP 6....................$ 52.39 30.30

NOTES:

Hazmat Premium 20% Hydrographic Premium .50

POWER EQUIPMENT OPERATORS CLASSIFICATIONS (BLDG, HEAVY & HWY)

GROUP 1: Autograde-Pavement-Profiler (CMI and Similar Type);

utograde-Pavement-Profiler (CMI and Similar Types);Autograde Slipform Paver (CMI and Similar Types);

Backhoe; Central Power Plants (all types); Concrete Paving Machine (s-240 and Similar Types); Cranes (All Types, Including Overhead and Straddle Traveling Type); Cranes, Gantry; Derricks (Land, Floating or Chicago Boom Type);

Drillmaster/Quartmaster (Down the Hole Drill) Rotary Drill;

Self-Propelled, Hydraulic Drill, Self-Powered Drill Draglines, Elevator Graders, Front End Loaders (5 yds. and over), Gradalls, Grader: Rago, Helicopters (Copilot), Helicopters, (Communication Engineer), Locomotive (large), Mucking Machines, Pavement and Concrete Breaker (Superhammer, Hoe Ram, Brokk 250 and Similar Types), Pile Driver (length of boom including length of leads shall determine premium rate applicable), Roadway Surface Grinder Scooper (loader and shovel), Shovels, Tree Chooper with Boom, Trench Machines, Tunnel Boring Machines.

GROUP 2: ""A"" Frame; Backhoe (Combination); Boom Attachment on Loaders (Rate based on size of bucket) not applicable to Pipehook) Boring and Drilling Machines, Brush Chopper, Shredder and Tree Shredder Tree Shearer, Cableways, Carry-alls, Concrete Pump, Concrete Pumping System, Pumpcrete and Similar Types, Conveyors, 125 ft and over;

Drill Doctor (duties include dust collector, maintenance), Front End Loader (22 yds. but less than 2 yds.), Graders (Finish); Groove Cutting Machine (ride on type), Heater Planer; Hoists: (all type hoists, Shall Also Include Steam, Gas, Diesel, Electric, Air Hydraulic, Single and Double Drum, Concrete, Brick Shaft, Caisson, Snorkel Roof, and or any other similar type Hoisting Machines, Portable or Stationary, Except Chicago Boom Type). Long Boom Rate to Be Applied if Hoist is ""outside material lower hoist"";

Hydraulic Cranes-10tons and Under; Hydro-Axe;

Hydro-Blaster; Jacket (Screw Air Hydraulic Power Operated Unit or Console Type: Not Hand Jack or Pile Load Test Type), Log Skidder; Pans, Pavers (all) Concrete; Plate and Frame Filter Press; Pumpcrete Machines; Squeeze Crete and Concrete Pumping (regardless of size); Scrapers; Sidebooms;

Straddle Carrier, Ross and Similar Types; Vacuum Truck;

Whip Hammer; Winch Trucks (Hoisting).

GROUP 3: Asphalt Curbing Machine, Asphalt Plant Engineer, Asphalt Spreader; Autograde Tube Finisher & Texturing Machine (CMI and Similar types) Autograde Curecrete Machine (CMI and Similar Types); Bar Bending Machines (power), Batchers, Batching Plant and Crusher on-site; Belt Conveyor Systems; Boom Type Skimmer Machines; Bridge Deck Finisher;

Bulldozers (all); Car Dumpers (A:road); Chief of Party;

Compressor and Blower Type Units (used) Independenty or Mounted On Dual Purpose Trucks, On Job Site or In Conduction with Job Site, In Loading and Unloading of Concrete, Cement, Fly Ash, Instantcrete, or Similar Type Materials); Compressor 92 or 3 in Battery); Concrete Finishing Machines; Concrete Saws and Cutters (ride on type); Concrete Spreaders, Hetzel, Rexomatic and Similar types; Concrete Vibrators; Conveyors, Under 125 ft), Crushing Machines, Ditching Machine, Small (ditchwitch, Vermeer or Similar type); Dope Dots (mechanical with or without pump), dumpsters; Elevator; Fireman; Forklifts (economobile, lull, and similar types of equipment); Front End Loaders (1 yd. and over but less than 2 yds.);

Generators (2 or 3 in Battery/ within 100 ft); Giraffe Grinders, Graders and Motor Patrols; Grout Pump; Gunnite Machines (excluding nozzle); Hammer Vibratory (in conduction with generators); Hoists (Roof, Tuggeraerial Platfrom Hoist and House Cars), Hoppers, Hoppers Doors (power operated); Hydro-Blaster (where required); Ladders (Motorized); Laddervator; Locomotive, Dinky type;

Maintenance, Utility Man; Mechanics; Mixers (Excepting Paving Mixers); Motor Patrols and Graders; Pavement Breakers, Small, Self-Propelled ride on type (also maintains compressor or hydraulic unit); Pavement Breaker, Truck Mounted; Pipe Bending Machine (power); Pitch Pump;

Plaster Pump (regardless of size); Post Hole Digger (post pounder and auger); Rod Bending Machines (power); Roller, Black Top; Scales, (power); Seaman Pulverizing Mixer;

Shoulder Widener; Silos; Skimmer Machines (Boom Type);

Steel Cutting Machine, Services and Maintains; Tamrock Drill; Tractors; Tug Captain; Vibrating Plants (used in conduction with unloading); welder and Repair Machines.

Concrete cleaning/decontamination machine operator;

Directional boring machine; Heavy equipment robotics operator; Master environmental maintenance operator; Ultra high pressure waterjet cutting tool system operator;

maintenance operator; Vacuum blasting machine operator

GROUP 4: Brooms and Sweepers; Chippers; Compressors (single);

Concrete Spreaders (small type); Conveyor Loaders (not including Elevator Graders); Engines, Large Diesel (1620 h.p.) and Staging Pump; Farm Tractors; Fertilizing Equipment (Operator and Maintenance of); Fine Grade Machine (small type); Form Line Graders (small type); Front End Loader (under 1 yd); Generator (single); Grease, Gas, Fuel and Oil Supply Trucks; Heaters (Nelson or Other Type Including Propane, Natural Gas or Flowtype Units); Lights, Portable Generating Light Plants; Mixers, Concrete Small;

Mulching Equipment (Operation and Maintenance of); Pumps (2 of Less Than 4 Inch Suction); Pumps 94 Inch Suction and Over Including Submersible Pumps); Pumps (Diesel Engine and Hydraulic); Immaterial of Power; Road Finishing Machines

(Small Type); Rollers, Grade, Full Or Stone Base; Seeding Equipment (Operation and maintence of); Sprinkler and Water Pump Trucks (Used on job Site or in conduction with Job Site); Steam Jennies and Boilers, Irrespective of Use;

Stone Spreader; Tamping Machines, Vibrating Ride On;

Temporary Heating Plant (nelson or Other Type, Including Propane, Natural Gas or Flow Type Units); Water and Sprinkler Trucks (Used On Job Site In Conduction with Job Site); Welding Machines-Within 100 ft (Gas, and /or Electric Converters of any type, single, tow or three in a battery). welding system, multiple (rectifier transformer type) well point systems (including installation by bull gang and maintenance of); Off Road back dumps.

GROUP 5: Oiler

GROUP 6: Helicopter Pilot

a. PAID HOLIDAYS: New Years Day, Washington's Birthday Memorial Day, July 4th, Labor Day, Veteran's Day, Election Day, Thanksgiving Day, and Christmas Day, provided the employee works one day during the calendar week in which the holiday occurs.

ENGI0825-008 01/01/2018

ORANGE, ULSTER AND SULLIVAN COUNTIES

Rates Fringes

Power equipment operators:

BUILDING CONSTRUCTION

STEEL ERECTION

GROUP 1....................$ 59.09 30.30

GROUP 2....................$ 57.43 30.30

GROUP 3....................$ 50.14 30.30

GROUP 4....................$ 47.48 30.30

GROUP 5....................$ 45.95 30.30

GROUP 6....................$ 44.19 30.30

GROUP 7....................$ 53.70 30.30

BUILDING CONSTRUCTION TANK

ERECTION

GROUP 1....................$ 58.81 30.30

GROUP 2....................$ 57.22 30.30

GROUP 3....................$ 53.70 30.30

GROUP 4....................$ 50.13 30.30

GROUP 5....................$ 44.92 30.30

OILOSTATIC MAINLINES AND

TRANSPORTATION PIPE LINES

GROUP 1....................$ 51.20 30.30

GROUP 2....................$ 49.55 30.30

GROUP 3....................$ 47.41 30.30

GROUP 4....................$ 45.91 30.30

GROUP 5....................$ 44.19 30.30

GROUP 6....................$ 53.13 30.30

NOTES:

Hydrographic Premium 50 Hazmat Premium 20% Tunnel Premium .75

STEEL ERECTION CLASSIFICATIONS

GROUP 1: Cranes (All Cranes, Land or Floating with Booms Including Jib 140 ft and over, Above Ground); Derricks, Land, Floating or Chicago Boom Type with Booms including Jib 140 ft and over above ground).

GROUP 2: Cranes (All Cranes, Land or Floating with Booms Including Jib Less Than 140 ft Above Ground); Derricks, Land, Floating or Chicago Boom Type with Booms Including Jib Less Than 140 ft above Ground).

GROUP 3: ""A"" Frame, Cherry Pickers 10 tons and under, Hoists Shall Also Include Steam, Gas, Desel, Electric, Air Hydraulic, Single and Double Drum Concrete, Brick Shaft Caisson, or Any Other Similar Type Hoisting Machines, Portable or Stationary, Except Chicago Boom Type; Jacks:

Screw Air Hydraulic Power Operated unit or Console Type (not hand Jack or Pile Load Test Type); Side Booms.

GROUP 4: Aerial Platform used as Hoist; Compressor: 2 or 3 in Battery; Elevators or House Cars; Conveyors and Tugger Hosits; Chief of Party; Firemanp; Forklift; Generators (2 or 3); Maintenance (Utility Man); Rod Bending Machine (power); Welding Machines (Gas or Electric, 2 or 3 in Battery, Including Diesels); Captain: Power Boats: Tug Master: Power Boats.

GROUP 5: Compressor, Single; Welding Machine, Single, Gas, Diesel, and Electric Converters of any Type: Welding System Multple (Rectifier Transformer Type); Generator, Single.

GROUP 6: Oiler

GROUP 7: Helicopter Pilot .

FOOTNOTE: a. PAID HOLIDAYS: New Years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day,…