RFI Log 20200908.pdf

PDF 51 KB Posted

Attached to
Renovate Multi-Function Room, Bldg 8 Federal contract opportunity
Solicitation number
W50S8120Q0011
Issued by
Department of the Army Massachusetts Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Multi-Function Room, Bldg 8, newest first.
File Type Posted
Site Visit Sign-In.pdf PDF
ATTACHMENT 3 - Entry Authorization Listing (EAL).pdf PDF
ATTACHMENT 1 - Specifications (Bldg8) 20200810.pdf PDF
Solicitation W50S8120Q0011.pdf PDF
ATTACHMENT 2 - Drawings (Bldg8) 20200617.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR INFORMATION (RFI) LOG

8 September 2020 W50S8120Q0011

Q01 - Will restrooms be available to contracts or do we need to provide our own?

A01 - Temporary restrooms are the responsibility of the contractor. Government furnished facilities will not be available.

Q02 - There is no ceiling height shown at the accordion Door please provide.

A02 - The suspended ceiling height is 9’-2” at the accordion door.

Q03 - Spec section 2.3.1 aside from the finish needing to be fire rated states that the complete assembly must be fire rated. The finish will be class A rated but the system is not rated.

What is the fire rating requirement for the accordion door.

Please note that usually fully fire rated accordion doors are normally special self-closing system connected to the fire alarm similar to Won Door. (I don’t believe this is what you are looking for?)

A03 - The accordion door does not have to be fire rated.

Q04 - Please confirm if taxes should be carried in proposals?

A04 - This project is tax-exempt.

Q05 - Please confirm if any state, local, and/or Federal permits will be required on this project?

A05 – None required.

Q06 - Please confirm if there are any known hazardous materials?

A06 – None known.

Q07 - Please confirm height of Ceilings?

A07 - The suspended ceiling height is 9’-2” at the accordion door.