This solicitation is for bathroom renovation services at Building 5026 at Scott Air Force Base. The Department of the Army National Guard is seeking quotes to repair and replace bathroom facilities, including removing and replacing mechanical systems, ceilings, fixtures and finishes. Quotes are due by the date specified to the 126th Air Refueling Wing Contracting Office. Award will be made based on best value as determined by price, technical and past performance factors. The work must be completed within the proposed period of performance. Products and services required include demolition, new showers, toilets, sinks, lighting, flooring, mechanical equipment, and wall finishes.

View the file

Other files for this federal contract opportunity

Other files attached to B5026 Bathroom renovation Scott AFB, newest first.
File Type Posted
QandA 1.docx DOCX document
Checklist for Bid Bonds.docx DOCX document
Site Visit MFR.pdf PDF
Sign In Sheet Redacted_Redacted2.pdf PDF
EXHIBIT A.docx DOCX document
Plumbing Drawings - Mens Bathroom.pdf PDF
1 - PWS - REPAIR Mens Bathroom_B5026.pdf PDF
Mechanical Drawings - Mens Bathroom.pdf PDF
A4.4 - Enlarged First Floor Plan.pdf PDF
A5.1 - Men's Restroom Elevations.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The 126th Air Refueling Wing requires repairs to men's bathroom located in Bldg 5026 IAW PWS. The 126th Base Contracting Office is soliciting this Request for Quote (RFQ) to award a single Firm Fixed Price Contract. This project is solicited as a Small Business Set-Aside. The NAICS is 236220, the small business size standard is $45 Million. The magnitude of this project is between $100,000 and $250,000. Funds are presently available for this contract. Award w ill be made to the of feror w ho represents the best value to the Government as outlined in accordance with the criteria set forth within the solicitation.

BENJAMIN JAMES 618-222-5112

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

28-Aug-2023

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________150 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______30 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USPFO IL 126 MISSION SUPPORT CONTRACTING

126 AIR GUARD WAY

SCOTT AFB IL 62225-5503

W50S7S

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00010 - Solicitation Contract Form

INSTRUCTIONS TO OFFERORS

This is a request for quote using FAR 13 procedures for construction prepared in accordance with FAR 36.701, as supplemented with additional information included in this notice. This announcement is being issued as a request for quotation (RFQ) and constitutes the only solicitation. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2023-04. The Contracting Officer reserves the right to award under a different NAICS if the company would qualify as a small business under the solicited NAICS. A site visit is currently anticipated for upcoming project, details will be announced thru SAM.gov (GPE) once they have been finalized.

Preparing and Submitting your Quote:

1 Pages, pricing quote sheet.

Any proposed changes to the Statement of Work.

1-2 Page, On-site supervisor resume Description of Technical narrative, demonstrating understanding on the project.

Completed Technical Exhibit A, showing prior successful experience

Include country of manufacture for all proposed items. Include feasible work availability dates or suggests alterations to the Period of Performance. These will be evaluated as part of the technical solution. Contractors are encouraged to review the Statement of Work and suggest changes which would benefit the government.

Preferred CLIN structure:

CLIN0001: 1 Job, Bldg 5026 Bathroom Project

All questions and quotes must be directed to 126 Contracting Officer via email at 126.arw.msc@us.af.mil. Questions asked within 1 week of solicitation close will be answered at the discretion of the Contracting Officer. Please make quotes good for 30 days, if possible. Emailed quotes are preferred. Late quotes may be rejected at the Contracting Officer’s discretion.

Place the solicitation number in the subject line of any email.

Evaluation:

The Government plans to award a contract resulting from this solicitation to the offer conforming to the solicitation which will be most advantageous to the Government. Quotes will be evaluated using price, technical, and past performance. Technical evaluation will be an overall rating based on all documents submitted, not including price. Technical narrative must demonstrate to Government that vendor understands the requirement and is able to complete the project. The narrative will be part of the technical evaluation and reiterating the Performance Work Statement will be considered unacceptable. If no Technical narrative is provided, rating will be neutral. Past Performance will be evaluated through inquiries of Government databases. If no Past Performance is found, rating will be neutral. All solicitation specifications are not absolute and the 126ARW will consider innovative solutions to this requirement. Quotes may be comparatively evaluated in compliance with FAR 13.106-2 (b) (3). Be sure to submit/attach enough additional information to enable the Government to fully ascertain the specifications/capabilities of any products quoted. The government may seek 3rd party consumer reviews of quoted items to determine technical ratings.

GOVERNMENT INTENDS TO ISSUE ONE (1) CONTRACT BUT RESERVES THE RIGHT TO CONSIDER PARTIAL OR MULTIPLE AWARDS. If not already registered in SAM, go to WWW.SAM.GOV to register prior to submitting quote. At the time of evaluation of your quote, your company must have an active status in SAM.gov. Electronic Documents: All electronic documents must NOT be “secured”, “locked”, or otherwise inaccessible. Submitter risks rejection if documents prove inhospitable to viewing and evaluation. Utilize standard Microsoft or Adobe formats, and net file size of all documents should be less than 10MB.The selected Offeror must comply with the listed Clauses, which are incorporated herein by reference or full text. The final award clauses might differ slightly from the listed clauses, if administrative errors have been made in clause selection. Contractor will have a chance to review Purchase Order before Contract is finalized.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

Bldg 5026 Bathroom Project

FFP

IAW SOW

FOB: Destination

NET AMT

Section 00700 - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.203-18 Prohibition on Contracting With Entities That Require Certain Internal Confidentiality Agreements or Statements-- Representation

JAN 2017

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements

JAN 2017

52.204-7 System for Award Management OCT 2018 52.204-7 Alt I System for Award Management-- Alternate I OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

JUN 2020

52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-22 Alternative Line Item Proposal JAN 2017 52.204-23 Prohibition on Contracting for Hardware, Software, and

Services Developed or Provided by Kaspersky Lab and Other Covered Entities

NOV 2021

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment

NOV 2021

52.204-26 Covered Telecommunications Equipment or Services-- Representation.

OCT 2020

52.204-27 Prohibition on a ByteDance Covered Application JUN 2023

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

NOV 2021

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.211-10 Commencement, Prosecution, and Completion of Work APR 1984 52.211-12 Liquidated Damages--Construction SEP 2000 52.211-13 Time Extensions SEP 2000 52.213-4 Terms and Conditions--Simplified Acquisitions (Other Than

Commercial Products and Commercial Services)

JUN 2023

52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-1 Instructions to Offerors--Competitive Acquisition NOV 2021 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.216-1 Type Of Contract APR 1984 52.219-4 Notice of Price Evaluation Preference for HUBZone Small

Business Concerns

OCT 2022

52.219-6 Notice Of Total Small Business Set-Aside NOV 2020 52.219-13 Notice of Set-Aside of Orders MAR 2020 52.219-28 Post-Award Small Business Program Rerepresentation MAR 2023 52.219-33 Nonmanufacturer Rule SEP 2021 52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-2 Payment For Overtime Premiums JUL 1990 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards - Overtime

Compensation

MAY 2018

52.222-5 Construction Wage Rate Requirements--Secondary Site of the Work

MAY 2014

52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-23 Notice of Requirement for Affirmative Action to Ensure

Equal Employment Opportunity for Construction

FEB 1999

52.222-24 Preaward On-Site Equal Opportunity Compliance Evaluation FEB 1999 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons NOV 2021 52.222-55 Minimum Wages for Contractor Workers Under Executive

Order 14026

JAN 2022

52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011

52.223-6 Drug-Free Workplace MAY 2001 52.223-9 Estimate of Percentage of Recovered Material Content for

EPA-Designated Items

MAY 2008

52.223-15 Energy Efficiency in Energy-Consuming Products MAY 2020 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

AUG 2018

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

JUN 2020

52.223-19 Compliance with Environmental Management Systems MAY 2011 52.223-20 Aerosols JUN 2016 52.223-21 Foams JUN 2016 52.223-22 Public Disclosure of Greenhouse Gas Emissions and

Reduction Goals -- Representation.

DEC 2016

52.225-10 Notice of Buy American Requirement--Construction Materials

MAY 2014

52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements

MAY 2014

52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.227-1 Authorization and Consent JUN 2020 52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-12 Prospective Subcontractor Requests for Bonds DEC 2022 52.228-15 Performance and Payment Bonds--Construction JUN 2020 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

MAR 2023

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-4 Physical Data APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984 52.236-19 Organization and Direction of the Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.236-28 Preparation of Proposals--Construction OCT 1997 52.242-5 Payments to Small Business Subcontractors JAN 2017

52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.242-15 Stop-Work Order AUG 1989 52.243-1 Changes--Fixed Price AUG 1987 52.243-5 Changes and Changed Conditions APR 1984 52.243-7 Notification Of Changes JAN 2017 52.244-6 Subcontracts for Commercial Products and Commercial

Services

JUN 2023

52.246-6 Inspection--Time-And-Material And Labor-Hour MAY 2001 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.247-1 Commercial Bill Of Lading Notations FEB 2006 52.247-34 F.O.B. Destination NOV 1991 52.247-65 F.O.B. Origin, Prepaid Freight--Small Package Shipments JAN 1991 52.249-4 Termination For Convenience Of The Government (Services)

(Short Form)

APR 1984

52.252-1 Solicitation Provisions Incorporated By Reference FEB 1998 52.252-4 Alterations in Contract APR 1984 52.252-5 Authorized Deviations In Provisions NOV 2020 52.252-6 Authorized Deviations In Clauses NOV 2020 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

JAN 2023

252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

SEP 2022

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors JAN 2023 252.204-7006 Billing Instructions--Cost Vouchers MAY 2023 252.204-7007 Alternate A, Annual Representations and Certifications MAY 2021 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

JAN 2023

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

JAN 2023

252.204-7016 Covered Defense Telecommunications Equipment or Services -- Representation

DEC 2019

252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation

MAY 2021

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services

JAN 2023

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism

MAY 2019

252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors

JAN 2023

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials

SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JAN 2023 252.225-7001 Buy American And Balance Of Payments Program--Basic JAN 2023 252.225-7002 Qualifying Country Sources As Subcontractors MAR 2022 252.225-7012 Preference For Certain Domestic Commodities APR 2022

252.225-7035 Alt II (Dev)

Buy American - Free Trade Agreements - Balance of Payments Program Certificate (DEVIATION 2020-O0019) Alternate II

DEC 2022

252.225-7048 Export-Controlled Items JUN 2013 252.225-7059 Prohibition on Certain Procurements from the Xinjiang

Uyghur Autonomous Region - Representation

JUN 2023

252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region

JUN 2023

252.227-7033 Rights in Shop Drawings APR 1966 252.231-7000 Supplemental Cost Principles DEC 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.236-7002 Obstruction of Navigable Waterways DEC 1991 252.236-7003 Payment for Mobilization and Preparatory Work JAN 1997 252.236-7005 Airfield Safety Precautions DEC 1991 252.236-7006 Cost Limitation JAN 1997 252.236-7008 Contract Prices-Bidding Schedules DEC 1991 252.236-7013 Requirement for Competition Opportunity for American Steel

Producers, Fabricators, and Manufacturers

JAN 2023

252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel

JAN 2023

252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Products or Commercial

Services

JAN 2023

252.244-7001 Contractor Purchasing System Administration MAY 2014 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for

Military Operations

OCT 2010

252.247-7023 Transportation of Supplies by Sea JAN 2023

CLAUSES INCORPORATED BY FULL TEXT

52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JULY 2000)

(a) The Contractor shall submit one of the following payment protections:

i. A payment bond

ii. An irrevocable letter of credit

iii. Certificates of deposit

iv. A deposit of the types of security listed in FAR 28.204-1 and FAR 28.204-2.

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 10 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

(End of clause)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Name: 126th Base Contracting Office Email: 126.arw.msc@us.af.mil

(End of provision)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Invoice 2in1

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC F87700

Issue By DoDAAC W50S7S

Admin DoDAAC** W50S7S

Inspect By DoDAAC F8X3CE

Service Approver (DoDAAC) F8X3CE

Service Acceptor (DoDAAC) F8X3CE

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

126th Base Contracting Office: 126.arw.msc@us.af.mil

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

PERFORMANCE WORK STATEMENT (PWS)

FOR

REPAIR, Men’s Bathroom – Bldg. 5026

VDYD232002

SCOTT AIR FORCE BASE, ILLINOIS

23 AUGUST 2023

1. REQUIREMENT:

a. BACKGROUND: 126th Air Refueling Wing aircraft maintenance hangar contains the authorized aircraft for the Air National Guard on Scott Air Force Base. It is located at building 5026 (5780 Pryor Drive).

b. OBJECTIVES: This project addresses multiple work orders that have been created for the same area in Bldg. 5026, the Maintenance Aircraft Hangar. Currently, the Men’s Bathroom in the main hangar bay area needs major repairs to provide adequate facilities for all personnel working on KC-135 aircraft. The drywall ceiling is falling apart due to inefficient, leaking HVAC and mechanical systems that are located on the ceiling joists of the bathroom CMU room. The ceiling was constructed using two layers of drywall and not designed to house mechanical equipment or allow personnel to walk on the ceiling. The HVAC system that is located on the ceiling has leaked through the drywall due to poor condensation drainage causing the severe water damage and mold growth throughout the locker room and lavatory area of the bathroom. Due to the bathroom being out in a mostly unconditioned bay space, the room is subject to humidity during the summer and cold temperatures in the winter causing condensation and mold issues throughout the room.

c. Existing Bathroom Layout (Room 105/105A):

2. PROJECT SCOPE: The Contractor shall furnish all labor, materials, vehicles, equipment, tools, supervision, and administration required to conduct the following work:

a. BASE BID: Mechanical/Exterior Repair

i. Removal of the A-Coil off the bathroom ceiling and install an air handler that is appropriately sized to go with the A-Coil and condenser. A-Coil and condenser shall be placed behind the bathroom at ground level. All piping and wiring shall be relocated to new location as necessary.

ii. Remove the existing tank water heater from the ceiling area and relocate to the location shown on the proposed plan below at ground level. All ventilation, mechanical and plumbing piping and electrical shall be relocated to accommodate the new location shown in the proposed mechanical room.

iii. Remove the existing ceiling drywall and structural members (if needed). Assess the ceiling joists and install new ceiling joists and covering robust enough to allow for ceiling access for maintenance workers (recommend ¾” plywood that can be exposed to exterior humidity, etc.). New ceiling/roof of the bathroom shall meet all code requirements/fire rating as appropriate.

iv. Contractor shall assess the ceiling and the mechanical equipment and piping above the bathroom. If piping or ductwork can be moved to allow for less impacts, the contractor shall provide for that in their bid. If the ceiling height for the bathroom can be raised to achieve a height of 9’0” AFF, that would be ideal.

v. Cut an opening in the rear of the room to allow for a new mechanical room entrance.

Recommend installing a lintel to allow for a new steel, controlled entry door into proposed mechanical room. All door hardware and cores shall be BEST.

vi. Install a new handwash station on south exterior of bathroom near front door. All piping, drainage and venting shall be new and ran to minimize impact to work in the hangar bay.

Contractor shall provide an access panel on inside of bathroom to allow for maintenance and ability to shutoff water supply in winter months when hangar door will be open for extended periods of time.

vii. Clean exterior CMU and seal any gaps and paint with an exterior paint to minimize air seepage into new space. Paint type and color shall be chosen at time of construction. Goal for this is to reduce potential for outside air entering space and causing mold issues.

viii. All work is inside a controlled area within the Maintenance compound. The contractor will coordinate with the project manager and/or the COR daily prior to gaining access to the worksite. All vehicles will be checked for FOD each time the apron Entry Control Point (ECP) is crossed.

b. CLIN 002: Interior Repair and Replacement

i. Demolition Work:

a. Remove all drywall and wall coverings to expose all piping and electrical work.

b. Remove flooring down to concrete.

c. Remove all plumbing fixtures (lavs, toilets, showers, faucets, etc.)

d. Remove all electrical lighting and switches.

e. Remove all lockers and equipment and/or accessories (toilet paper holders, paper towels, etc.)

ii. Proposed Work:

a. Install new showers stalls in location shown on proposed plan. The shower walls shall be constructed with tile (or approved equal) to minimize mold growth and requires minimal cleaning, etc. All drywall areas in shower area shall have ceramic wall tile installed IAW with 126ARW interior finish standards (attached). Shower area will also have a separate steel door that serves for privacy and to prevent moisture entering rest of locker room area. Contractor shall supply hooks in shower area and shower curtain and rods for complete and usable area. Install new exhaust fan in shower area to minimize mold growth. Exhaust fan should be tied to lights to ensure it is always being used.

b. Install new urinals and toilets as space will allow with associated partitions and accessories IAW with all codes, finish standards and proposed plan.

c. Install new sinks with solid surface countertop (to be determined during material submittals). Soap dispensers should be separate from sink installation and easy to refill and mounted in area near sink.

d. Provide a locker plan fitting as many lockers in the space remaining in the rear of the room. Current layout proposed on plan (not set in stone), is proposing 55 12” wide lockers. Lockers shall adhere to finish standards being 12” wide x 24” deep x 72” tall.

Locker plan shall be submitted as shop drawing for approval. Provide bench and locations on shop drawings and install accordingly.

e. Install new steel entry doors with automatic closing mechanisms for both the bathroom and locker room area. Bathroom door shall match existing in terms of functionality.

f. Flooring shall be prepared for epoxy type flooring and cove to minimize maintenance and withstand heavy foot traffic and oil/chemical stains.

g. Install new exhaust fan in bathroom area to accommodate heavy workload and usage.

Exhaust fan should be tied to lights to ensure it is always being used.

h. All lighting shall be waterproof rated, LED and IAW with all NEC and local codes.

Ensure both areas are well lit to prevent any safety mishaps. Lighting, at a minimum, shall be in the following locations:

• Each shower stall (or approved equal material)

• Shower Room Area

• Locker Room Area

• Bathroom Area (over sink, over urinals/toilets

• In walking areas (between doorways) and between sinks and toilets/urinals

i. Install new bathroom accessories where applicable (i.e. ADA bar, toilet paper dispenser, paper towel dispenser, soap dispenser, etc.).

j. Install Ceramic Wall tile (IAW 126ARW Interior Standards) for all exposed drywall areas in bathroom and locker room area up to a height of 48”. See suggested locations for tile (IN RED) below.

PROPOSED TILE LOCATION:

PROPOSED PLAN:

3. SCHEDULE:

a. Performance period: The period of performance (PoP) for this project shall be proposed by the contractor and negotiated with the government from the date that Notice to Proceed (NTP) is issued. All work must be scheduled to be complete within this timeframe. Any modifications or extensions must be requested through the 126th Civil Engineer Squadron (126 CES) and the Contracting Officer for review and discussion. Contractor must provide construction milestones to 126 CES and the Contracting Officer.

b. Construction may be authorized by the Contracting Officer upon acceptance and approval of the schedule and equipment/material submittal approvals.

4. SPECIFICATIONS: All work performed shall comply with all applicable UFC, NFPA, NEC and other local and federal regulations and code.

5. GENERAL CONDITIONS:

a. Contractor shall site verify all dimensions and/or existing site conditions prior to the commencement of work. Commencement of work shall begin within ten (10) calendar days upon the receipt of the NTP issued by the Contracting Officer.

b. Contractor shall be completed within the agreed upon PoP as stated within the contract issued by the Contracting Officer.

c. Contractor shall be required to apply for and submit to the Contracting Officer an AF Form 103, Work Clearance Request, for all work to be accomplished under this delivery order five (5) days prior to the commencement of work. The AF Form 103 can be obtained from and approved by 126CES.

d. Contractor shall brief all Sub-Contractors on all safety and fire prevention regulations, emphasizing the requirement to obtain a daily AF Form 592, Welding, Cutting, and Brazing Permit, when welding, cutting, or brazing operations are to occur under this delivery order. The AF Form 592 can be obtained from and approved by 126CES.

e. Contractor shall complete and submit the appropriate DD Form 1354, Transfer and Acceptance of DoD Real Property to the 126CES for records. The DD Form 1354 can be obtained from 126 CES.

f. Contractor shall provide an inventory, utilizing Microsoft Excel, of all removed systems to ASTM-E1557-09 Uniformat II, Level 4 system detail. Detail data includes Facility Number, ID Number (if available); Equipment Type; Equipment Make; Serial Number; Model; Capacity; Manufacturer; and Location. Contractor shall provide the government two copies of CD/DVD media with an electronic copy of the removed systems inventory as part of the final close out document package.

g. Contractor shall provide an inventory, utilizing Microsoft Excel, of newly installed systems to ASTM-E1557-09 Uniformat II, Level 4 system detail. Since section detail data can be recorded for equipment and non-equipment section types, some of the data elements may not apply to component-sections. The Contractor must provide section detail data for those data elements that do apply (see Attachment 4).

Section detail data includes Facility Number; Level 2 Group Element (System) Description; Level 3 Individual Element (Component) Description; Level 4 Sub- Element (Section) Description; Sub-Element Description; Equipment Type;

Equipment Make; Serial Number; Model; Capacity; Manufacturer; Warranty Company; Warranty Expiration Date; Location; Date Manufactured; Control Type/Make and Year Installed. Contractor shall provide the government two copies of

CD/DVD media with an electronic copy of the installed systems inventory as part of the final close out document package.

h. Contractor shall provide an electronic draft copy of the installed systems inventory for review and issuance of the applicable inventory ID Number and bar-code labels at least 30 days prior to O&M handover walk-through (conducted prior to contract close out).

i. Contractor shall, during construction, keep an accurate electronic record of as-built conditions, all variations from the contract drawings (that have been approved by the contracting officer or COR in writing in advance of any such variations - including those made because of the selection of optional materials), shall be clearly indicated. These variations shall be shown in the same general detail utilized in the initial contract drawings. The as-built drawings shall be maintained in a current condition during construction. The as-built drawings shall be furnished to the Contracting Officer and 126 CES not later than ten workdays after the final inspection date. As part of the as-built drawings a separate set of plans shall be marked-up showing areas found/known to contain asbestos.

j. Contractor shall install bar-code labels on all newly installed systems, as required. Bar-code labels must match applicable component-sections standardized on the Base.

k. All documents related to the disposal of hazardous material must be supplied to 375 CONS and 126 CES. The Contractor must obtain the proper documents from 126 CES to ensure all materials leaving Scott Air Force Base can be tracked and accounted for, in accordance with all governing laws.

l. Under the 1992 Clean Air Act, all products used in executing this project must not be related to the Class I Ozone Depleting Chemicals (ODCs) identified in Air Force Policy.

The following products are considered Class I ODCs: CFC-11, CFC-12, CFC-113, CFC- 114, CFC-115, Halon 1211, Halon 1301, Halon 2402, CFC-13, CFC-111, CFC-112, CFC-211, CFC-212, CFC-213, CFC-214, CFC-215, CFC-216, CFC-217, Carbon tetrachloride, and Methyl Chloroform.

6. FIELD CONDITIONS:

The Contractor shall be responsible for all field measurements to accomplish work. Quantity and sizes of materials shall be determined from site visits and drawings. The Contractor shall carefully examine the entire site and building and shall make all necessary investigations to become thoroughly aware of the existing conditions and all difficulties involved in the completion of the work in accordance with the contract documents.

7. ACCOMPLISHMENT OF WORK:

The work areas of the existing building will be in occupied and unoccupied areas. The Contractor must ensure that all access to the existing building always remains clear for occupants and emergency access during the construction period. All temporary closures, barriers, and protective procedures shall be coordinated with the Contracting Officer. All work shall be accomplished during the standard 8-hour day, 5-day week, Monday through Friday, between the hours of 7:30 A.M. and 4:30 P.M. local time, excluding Federal Legal holidays and nonwork days resulting from holidays occurring on weekends. However, power outages shall be accomplished on weekends or 126ARW down days (calendar provided). The 126ARW has a compressed schedule and does have roughly two down days per month, typically on Fridays. Please reference the 126ARW calendar to coordinate the construction schedule to not work on scheduled down days unless required.

8. WORK CONDITIONS:

The Contractor shall coordinate work with the Contracting Officer, in conjunction with the User and 126 CES. The Contractor shall notify the Contracting Officer or the 126 CES inspection representative the day before he/she moves onto the work site to commence work. The Contractor shall again provide notification the day he moves back to the work site after an interruption of work of two or more days in duration. The Contractor shall also provide an original work schedule and updates if required. This schedule shall describe major work items and projected completion dates.

9. PROTECTION OF BUILDING PROPERTY:

The Contractor shall protect from damage all building property located in or adjacent to the building and shall repair, replace, or otherwise be held liable for all such damage. Building properties include but are not limited to, furniture, vehicles, or items of supplies. Exercise control measures of all dust and toxic fumes associated with construction operations, to prevent hazards or illness to base and Contractor personnel.

10. CLEANUP:

The Contractor shall cleanup each work site at the end of each workday to the satisfaction of the Contracting Officer. Upon completion of the work, all construction equipment and debris shall be removed from the site and the area shall be left in a neat and completely acceptable condition as required by the General Provisions. Contractor must always recycle materials, such as, but not limited to cardboard and paper. The Contractor will use whatever means necessary to store all recyclable materials and is responsible for turning in recyclable materials to the Base Recycling Center.

11. PATCHING AND REPAIRING:

After the work has been completed, holes, cuts, and damages made in the finished surfaces of the work site and adjacent areas shall be properly repaired and restored to match the existing finishes. Any abrasion or disfigurement of the finish work or any portion of the building where any such abrasion or disfigurement is caused by the activities of the Contractor shall be repaired and neatly refinished to match the adjacent work to the satisfaction of the Contracting Officer. Contractor shall maintain integrity of all fire walls/barriers.

12. PRODUCTS:

All products shall conform to their respective manufacturing and performance publications. All materials and equipment used in the work area shall be the products of manufacturers regularly engaged in the manufacture of construction products.

13. SUBMITTALS:

The Contractor shall submit for approval all items as required by other parts of these specifications. The Contracting Officer may request submittals in addition to those required by the other parts of this Statement of Work when deemed necessary to adequately describe the work. Submittals shall be made to the Contracting Officer in five (5) copies using AF Form 3000, Material Approval Submittal. In general, submittals shall be provided a minimum of thirty (30) calendar days in advance of scheduled installation to allow satisfactory time for Government review. Additionally, unless stated otherwise submissions on test results and other submissions of a similar nature shall be made within fourteen (14) calendar days after the work or test is performed. Each submittal shall be complete and in sufficient detail for ready determination of compliance with contract requirements. Submittals shall include such items as Contractor’s or manufacturer’s shop drawings, descriptive literature, catalog cuts, samples, certifications, installation procedures and recommendations, templates, and other descriptive literature as may be required by the

Contracting Officer. Catalog cuts and other descriptive data which may have more than one model or type shall be clearly marked to show the model, type, size, and all optional or accessory equipment the Contractor proposes to install. Submittals on component items forming a system or interrelated items shall be submitted at one time as a single submittal to demonstrate that the items have been properly coordinated and will function as a unit. Approval of submittals will not relieve the Contractor of compliance with the project drawings and specifications. Submittal items that are disapproved will be promptly corrected and resubmitted by the Contractor. No materials shall be installed until submittals are approved by the Contracting Officer. All submittals involving color selections, patterns, and other decorative architectural features shall be submitted at the same time for both interior and exterior materials.

14. SPECIFICATIONS:

Work shall be performed in strict accordance with these contract general specifications, as well as all applicable local, state, and national Building and Life Safety Codes, American Society for Testing and Materials (ASTM) specifications. Safety plans and procedures issues must adhere to all applicable Occupational Safety and Health Act (OSHA) regulations.

15. SECURITY:

Access and General Protection/Security Policy and Procedures.The contractor shall comply with all applicable installation/facility access and local security policies andprocedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for backgroundchecks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local SecurityOffice. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 10-245, AFI 31-101 and AFMAN 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

Antiterrorism Awareness Level I Training (AT Level I). All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilitiesand controlled access areas shall complete AT Level I training within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on Joint Knowledge Online (JKO) at https://jkodirect.jten.mil/Atlas2/ faces/page/login/Login.seam. For those without a CAC, select"Non- CAC" user on the JKO site. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative.

mailto:benjamin.james.1@us.af.mil mailto:matthew.boice@us.af.mil mailto:larry.fuller@us.af.mil mailto:eric.bennett.11@us.af.mil

"General Decision Number: IL20230007 07/28/2023

Superseded General Decision Number: IL20220007

State: Illinois

Construction Types: Building and Residential

Counties: Madison and St Clair Counties in Illinois.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) & RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |.