W25G1V21R0027-01 CNC VMC SOLICITATION AMENDMENT.pdf
PDF 372 KB Posted
- Attached to
- Computer Numerical Controlled Double Column Vertical Machining Center Federal contract opportunity
- Solicitation number
- W25G1V21R0027
About this file
This document is an amendment to a solicitation for a turn-key design, supply, delivery, installation, cleaning, assembly, set-up and training for one computer numerical controlled double column vertical machining center at Tobyhanna Army Depot in Tobyhanna, Pennsylvania. The amendment incorporates questions and answers from a site visit into solicitation number W25G1V-21-R-0027, issued by the Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground. The questions and answers clarify that Fanuc controls are currently used with the in-house DNC system, a minimum of three axes is required, the machine type should be a double column bridge vertical machining center, and RS-232 communication is needed to interface with existing cyber security protocols. The closing date for responses to the solicitation is not extended.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT 1- PRICING TABLE.xlsx | XLSX spreadsheet | |
| W25G1V21R0027 CNC VMC SOLICITATION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W25G1V109601WE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Second Page for Description.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-May-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W25G1V21R0027
X 9B. DATED (SEE ITEM 11)
07-May-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-May-2021
CODE
ACC-APG, TOBYHANNA DIVISION
11 HAP ARNOLD BLVD
TOBYHANNA PA 18466-5100
W25G1V 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W25G1V21R0027
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT 0001
The Purpose of this Amendment is to incorporate the following Questions and Answers into Solicitation W25G1V-21-R-0027 that were submitted from the Site Visit. Also, Solicitation Closing Date will not be extended.
1. Is there a preference in CNC control Fanuc or Siemens? RESPONSE: CURRENTLY
FANUC CONTROLLERS ARE BEING USED WITH THE DNC SYSTEM (SEE #5 BELOW).
2. Is it a three axis? RESPONSE: THREE AXIS IS THE MINIMUM REQUIREMENT PER
SOW.
3. Type of machine, i.e. gantry, vertical…? RESPONSE: DOUBLE COLUMN BRIDGE
VERTICAL MACHINING CENTER.
4. Is the RS232 communication needed? RESPONSE: CURRENT CYBER SECURITY
REQUIREMENTS DICTATE THE USE OF THE RS232 AS THE SECURITY PROTOCOLS
WERE BUILT USING RS232.
5. Is Tobyhanna’s DNC System a base software? Do you know if it connects with Siemens or Fanuc? RESPONSE: THE DNC SYSTEM IS AN IN-HOUSE SOFTWARE PROGRAM. IT
IS CURRENTLY USED WITH FANUC, BUT IF OTHER CONTROLS ARE USED, SUCH
CONTROLS MUST WORK WITH THE DNC SYSTEM.
SUMMARY OF CHANGES
(End of Summary of Changes)
File details come from the government source that posted it. Updated .