W15QKN21R0071.pdf

PDF 112 KB Posted

Attached to
Dielectric Spectroscope Federal contract opportunity
Solicitation number
W15QKN21R0071
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to Dielectric Spectroscope, newest first.
File Type Posted
A002-Security Training.pdf PDF
A001-Accident Report.pdf PDF
Attachment 0001 - Statement of Work_DLS.docx DOCX document
Attachment 0002- Contract Quality Requirements.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

Offeror To Complete Block 12, 17, 23, 24, & 30

1. Requisition Number Page Of

2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date

7. For Solicitation Information Call:

A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time

9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:

Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program

Hubzone Small Business EDWOSB

Service-Disabled Veteran-Owned Small Business NAICS:

Email: 8(A) Size Standard:

11. Delivery For FOB Destination Unless Block Is Marked

12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating

See Schedule 14. Method Of Solicitation RFQ IFB RFP

15. Deliver To Code 16. Administered By Code

Telephone No.

17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code

Telephone No.

17b. Check If Remittance Is Different And Put Such Address In Offer

18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum

19.

Item No.

20.

Schedule Of Supplies/Services

21.

Quantity

22.

Unit

23.

Unit Price

24.

Amount

(Use Reverse and/or Attach Additional Sheets As Necessary)

25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)

27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.

27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.

28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.

Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:

30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)

30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed

Authorized For Local Reproduction Previous Edition Is Not Usable

Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212

W15QKN-21-R-0071 2021FEB05

MARCUS EDMUNDSON (973)724-5382

MARCUS.L.EDMUNDSON.CIV@MAIL.MIL

2021MAR08 05:00pm

W15QKN

ARMY CONTRACTING COMMAND - NJ

PICATINNY ARSENAL, NJ 07806-5000 X

X 100

333314

NONE

X

SEE SCHEDULE

SEE SCHEDULE

X X

X 1

1 46

19.

Item No.

20.

Schedule Of Supplies/Services

21.

Quantity

22.

Unit

23.

Unit Price

24.

Amount

32a. Quantity In Column 21 Has Been

Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________

32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative

32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative

32g. E-Mail of Authorized Government Representative

33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final

38. S/R Account No. 39. S/R Voucher Number 40. Paid By

41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)

42c. Date Rec’d (YY/MM/DD) 42d. Total Containers

Standard Form 1449 (Rev. 2/2012) Back

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SUPPLEMENTAL INFORMATION

Buyer Name: MARCUS EDMUNDSON

Buyer Office Symbol/Telephone Number: CCNJ-JA/(973)724-5382

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

This is a Request for Proposal (RFP) for a firm fixed price purchase order for the purchase of a Dielectric Spectroscope. This effort will include the purchase, delivery, final installation and training of one (1) Dielectric Spectroscope as described in Section C.

The delivery date for this dielectric spectroscope is 1 May 2021.

*** END OF NARRATIVE A0001 ***

GENERAL INFORMATION TO OFFERORS OR QUOTERS

1. Responses must set forth full, accurate and complete information as required by this solicitation (including attachments). Fill-ins are provided on Standard Form (insert form numbers), and other solicitation documents. Examine the entire solicitation carefully. The penalty for making false statements is prescribed in 18 U.S.C. 1001.

2. Responses must be plainly marked with the Solicitation Number and the date and local time set forth for bid opening or receipt of proposals in the solicitation document.

3. Information regarding the timeliness of response is addressed in the provision of the solicitation entitled either Late Submission, Modification and Withdrawal of Bid or Instructions to Offerors Competitive Acquisitions.

4. Procurement Information

This Procurement is 100% set-aside for Small Business. The applicable NAICS code is 333314.

5. Issuing Office

U.S. Army Contracting Command - New Jersey

ATTN: Wilson Au

Office Symbol: ACC-NJ-JA

Picatinny Arsenal, NJ 07806-5000

Email: wilson.w.au.civ@mail.mil

6. Point of Contact for Information:

Name: Marcus Edmundson

Title: Contract Specialist

Email: marcus.l.edmundson.civ@mail.mil

*** END OF NARRATIVE A0002 ***

DISCLOSURE OF UNIT PRICE INFORMATION

This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial

Information (June 23, 1987), of our intention to release unit prices in response to any request under the Freedom of Information Act, 5

USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the contracting officer is notified of your objection to such posting prior to submission of initial proposals.

*** END OF NARRATIVE A0003 ***

2 46

W15QKN-21-R-0071

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SUPPLIES OR SERVICES AND PRICES/COSTS

0001 DIELECTRIC SPECTROSCOPE $ $ _______________________ ______________ __________________

COMMODITY NAME: DIELECTRIC SPECTROSCOPE

CLIN CONTRACT TYPE:

Firm Fixed Price

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W15BW9) XR W4MK CENTER ARMAMENT RD E

BLDG 91 4TH AVE

PICTANNY ARSENAL NJ 07806-5000

0002 CONTRACT DATA REQUIREMENTS LIST _______________________________

A001 CDRL - DD FORM 1423 - A001 1 EA $ ** NSP ** $ ** NSP ** __________________________ ______________ __________________

COMMODITY NAME: SEE DD FORM 1423 IN SECTION J

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 3

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 1 01-MAY-2021

FOB POINT: Destination

SHIP TO:

3 46

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

(W15BW9) XR W4MK CENTER ARMAMENT RD E

BLDG 91 4TH AVE

PICTANNY ARSENAL NJ 07806-5000

A002 CDRL - DD FORM 1423 - A002 1 EA $ ** NSP ** $ ** NSP ** __________________________ ______________ __________________

COMMODITY NAME: SEE DD FORM 1423 IN SECTION J

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

DOC SUPPL

REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____

001 3

DEL REL CD QUANTITY DEL DATE __________ ______________ ___________

001 1 01-MAY-2021

FOB POINT: Destination

SHIP TO:

(W15BW9) XR W4MK CENTER ARMAMENT RD E

BLDG 91 4TH AVE

PICTANNY ARSENAL NJ 07806-5000

4 46

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

** Due to system limitations, special characters and symbols are not shown in this text. Please see attached Statement of Work in

Section J **

Statement of Work

1.0 Introduction/Background

Explosives Research Branch needs a dielectric spectroscope to study amorphous and melt cast explosives.

2.0 Scope

To purchase a dielectric spectroscope system capable of rapid analysis of amorphous and melt cast explosives as they undergo melt.

3.0 Applicable Documents

NA

4.0 Requirements

The dielectric spectroscope shall be capable of the following.

Frequency Range of (3\'ecHz to 20MHz).

Temperature Range of -100\'b0C to 250\'b0C

Bias, \'b140V, 70mA fast sampling rate (6ms/point)

This is critical to understanding how amorphous energetics function and how melt cast explosives undergo relaxation. The dynamic processing therefore, drives the requirements

5.0 Deliverables

1. One Dielectric Spectroscope

2. Operating Manual

3. Training on equipment

4. Installation support

6.0 Period of Performance

The equipment shall be installed at the following location listed below. Due to COVID-19 and the uncertainty when Picatinny will reopen, contractor shall not deliver any item(s) or begin performance at Picatinny until official authorization is provided by the PCO that work can commence. The date would be subject to further delay via contract modification depending upon the COVID-19 situation.

The Dielectric Spectroscope and Operating Manual shall be delivered by 5/1/2021

7.0 Shipping Provisions:

The shipping address is: B3028, Picatinny Arsenal, NJ, 07054

Place of Performance is Contractors facility.

FOB Destination: B3028, Picatinny Arsenal, NJ 07806 ATTN: TBD

Non-Energetic Shipments:

Energetic Shipments: N/A

Classified Shipment Address: N/A

8.0 Reporting:

5 46

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

None

9.0 Safety:

AA&E Requirements: Identify all proposed use of Arms, Ammunition and Explosives (AA&E) as defined in DoD 5100.76M and AR 190-11

(Physical Security of Arms, Ammunition and Explosives) by nomenclature and NSN (if available). Provide risk factor sensitivity category.

In the event of non-standard energetic components DoD 5100.76M section AP1.5 provides the Computation of Risk Factor Numerical Values and associated Risk Tables to determine the Risk Factor Sensitivity Category.

Accident/Incident Report: The recipient shall report immediately any major accident/incident (including fire) resulting in any one or more of the following: causing one or more fatalities or one or more disabling injuries; damage of Government property exceeding

$10,000; affecting initiative planning or production schedules; degrading the safety of equipment under contract, such as personnel injury or property damage may be involved; identifying a potential hazard requiring corrective action. The recipient shall prepare the report (DI-SAFT-81563) for each incident. (If applicable)

10.0 Environmental Requirements Pollution Prevention: Consideration should be given to alternative materials and processes in order to eliminate, reduce or minimize hazardous waste being generated. This is to be accomplished while minimizing item cost and risk to item performance.

Environmental Compliance: All activities must be in compliance with Federal, State, and local environmental laws and regulations, Executive orders, treaties and agreements. The recipient shall evaluate the environmental consequences and identify the specific types and amounts of hazardous waste being generated during the conduct of efforts undertaken under an Ordnance Technology

Initiative Agreement.

Hazardous Waste Report: The recipient shall evaluate the environmental consequences and identify the specific types and amounts of hazardous waste being generated during this Ordnance Technology Initiative Agreement. The recipient shall submit a Hazardous waste report IAW DI-MGMT-80899.

Disposal Instructions for Residual/Scrap Materials: The recipient shall dispose of all residual and scrap materials generated from this Ordnance Technology Initiative Agreement, including high explosives. The recipient shall specify the anticipated quantities, methods, and disposal costs.

Ozone Depleting Chemical (ODC). Class 1 Ozone Depleting Chemicals (Class 1 ODCs) are used <or not used> in executing the SOW.

11.0 Security: The security level for this effort is UNCLASSIFIED

12.1 AT Level I Training. Requires the addition of: All contractor employees, including subcontractor employees, requiring access to Department of Defense installations, facilities, or controlled access areas shall complete AT Level I awareness training within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies and within 12 months prior to travel outside of the US, then annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 14 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at http://jkodirect.jten.mil/ .

11.2 Access and General Protection/Security Policy and Procedures. Requires the addition of: All contractor employees, including subcontractor employees, shall comply with all installation and facility access and local security policies and procedures

(provided by the Government representative), and security/emergency management exercises. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost

Marshal Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements (CFR clause 52.204-9, Personal Identity Verification of Contract Personnel) as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection

Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. During FPCONs Charlie and Delta, services/installation access may be discontinued/postponed due to higher threat. Services will resume when FPCON level and or threat is reduced to an acceptable level as determined by the Installation Commander. Contractor personnel working on an installation are required to participate in the Installation Random Antiterrorism Measures Program as directed.

Contractors may be subject to and must comply with vehicle searches, wearing of ID badges, etc. Failure to comply with policies and procedures could result in barred access onto the installation.

11.3 iWATCH (See Something, Say Something) Training. Requires the addition of: All contractor employees, including subcontractor employees, shall receive training and participate in the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 45 calendar days after contract

6 46

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

start date or effective date of incorporation of this requirement into the contract, whichever applies, and then annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 14 calendar days after completion of training by all employees and subcontractor personnel. Slides available to COR at https://www.milsuite.mil/book/docs/DOC-284984

11.4 For contractors that do not require CAC, but require access to a DoD facility or installation. Requires the addition of:

Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime

Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (Army Directive 2014-05/AR 190-13);

applicable installation, facility and area commander installation and facility access and local security policies and procedures

(provided by Government representative); or, at OCONUS locations, in accordance with status-of-forces agreements and other theater regulations.

11.5 Export Control Laws/International Traffic in Arms Regulation. Requires the addition of: DFARS Clause 252.225-7048, Export-Controlled Items applies to this effort. All documents determined to contain export controlled technical data will be marked with the following notice: WARNING: - This document contains technical data whose export is restricted by the Arms Export Control

Act (Title 22, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

11.6 For Contracts That Require a Government Provided OPSEC Standing Operating Procedure/Plan. Requires the addition of: The contractor is subject to compliance with the CCDC Armaments Center Operations Security Plan, per AR 530-1 (or DoDM 5205.02-M). This

SOP/Plan will specify the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.

11.7 For Contracts That Require OPSEC Training. Requires the addition of: Per AR 530-1 (or DoDM 5205.02-M), new contractor employees, including subcontractor employees, must complete initial (Level I) OPSEC training within 30 calendar days of reporting for duty and must also complete annual OPSEC awareness training as provided by the appropriately designated OPSEC level II trained OPSEC

Officer/Coordinator. The Contracting Officer Representative (COR) or Agreements Officer Representative (AOR) can request CCDC Armaments

Center OPSEC training from CCDC Armaments Center OPSEC POC e-mail:usarmy.pica.ccdc-ac.mbx.ardec-opsec@mail.mil.

11.8 For Contracts that Involve the Public Release of Information. Requires the addition of: Per AR 530-1 (or DoDM 5205.02-

M), an OPSEC review is required prior to all public releases. All government information intended for public release by a contractor will undergo a government OPSEC review prior to release.

12.0 Government Furnished Materials/Facilities:

Lists any physical/tangible items provided by the Government that the Contractor will be accountable for during performance and/or at the end of the initiative agreement. NONE

13.0 Technical Representative: To Be Determined.

*** END OF NARRATIVE C0001 ***

7 46

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

PACKAGING AND MARKING

Section D

COMMERCIAL PACKAGING REQUIREMENTS

1. Packaging - Preservation, packaging, packing, unitization and marking furnished by the supplier shall provide protection for a minimum of one year, provide for multiple handling, redistribution and shipment by any mode and meet or exceed the following requirements.

1.1 Cleanliness - Items shall be free of dirt and other contaminants which would contribute to the deterioration of the item or which would require cleaning by the customer prior to use. Coatings and preservatives applied to the item for protection are not considered contaminants.

1.2 Preservation - Items susceptible to corrosion or deterioration shall be provided protection such as preservative coatings, volatile corrosion inhibitors, desiccants, water-proof and/or water-vapor-proof barriers.

1.3 Cushioning - Items requiring protection from physical and mechanical damage (e.g. fragile, sensitive, critical material) or which could cause physical damage to other items, shall be protected by wrapping, cushioning, pack compartmentalization, or other means to mitigate shock and vibration and prevent damage during handling and shipment.

2. Unit package

2.1 Unit Package - A unit package shall be so designed and constructed that it will contain the contents with no damage to the item(s), and with minimal damage to the unit pack during shipment and storage in the shipping container, and will allow subsequent handling. The outermost component of the unit package shall be a container such as a sealed bag, carton or box.

2.2 Unit Package Quantity - Unless otherwise specified, the unit package quantity shall be one each part, set, assembly, kit, etc.

3. Intermediate Package

3.1 Intermediate Packaging - The use of intermediate packaging is required whenever one or more of the following conditions exist:

a. The quantity is over one (1) gross of the same national stock number.

b. Use enhances handling and inventorying.

c. The exterior surface of the unit pack is a barrier bag.

d. The unit pack is less than 64 cubic inches.

e. The weight of the unit pack is less than five (5) pounds and no dimension is over twelve (12) inches.

f. Intermediate container shall be limited to a maximum of 100 unit packs, a net load of 40 pounds, or a maximum volume of 1.5 cubic feet, whichever occurs first.

4. Packing

4.1 Unit packages and intermediate packages not meeting the requirements for a shipping container shall be packed in shipping containers. All shipping containers shall be the most cost effective and shall be of the minimum cube to contain and protect the items.

4.2 Shipping Containers - The shipping container (including any necessary blocking, bracing, cushioning, or waterproofing) shall comply with the regulations of the carrier used and shall provide safe delivery to the destination at the lowest tariff cost. The shipping container shall be capable of multiple handling, stacking at least ten feet high, and storage under favorable conditions (such as enclosed facilities) for a minimum of one year.

5. Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred commercial expendable pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

8 46

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

6. Marking

All unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129, Revision R, Date 18 February 2014 including bar coding. The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract or not. Special markings include, but are not limited to, shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel. NOTE: Passive RFID tagging is required in all contracts that contain

DFARS clause 252.211-7006. Contractors must check the solicitation and/or contract for this clause. For details and most recent information, see http://www.acq.osd.mil/log/rfid/index.htm for the current DoD Suppliers Passive RFID Information Guide and Supplier

Implementation Plan. If the item has Unique Item Identifier (UII) markings then the UII needs to be 2D bar coded and applied on the unit package, intermediate and exterior containers, and the unit load.

7. Hazardous Materials

7.1 A hazardous material is defined as a substance which has been determined by the Department of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Title 49 CFR and other applicable modal regulations effective at the time of shipment.) Ammunition and explosives (Hazard Class 1) are special cases and must be properly hazard classified and registered with the competent authority of the

United States (Department of Transportation).

7.2 Packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging contained in the following documents:

a. International Air Transport: International Civil Aviation Organization (ICAO) Technical Instructions for the Safe Transport of

Dangerous Goods by Air

b. International Vessel Transport: International Maritime Dangerous Goods Code (IMDG)

c. Domestic Transport: Code of Federal Regulations (CFR) Title 49

d. Military Air Transport: Joint Service Regulation AFMAN24-204 TM38-250 NAVSUP PUB 50 MCO P4030.19 DLAM 4145.3.

7.3 If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the regulations of the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers.

7.4 A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside a waterproof sealed pouch attached to the outside of the package.

8. Wood Packaging Materials - Heat Treatment and Marking of Wood Packaging Materials: In accordance with the requirements of

International Standards for Phytosanitary Measures (ISPM) 15, the following commercial heat treatment process has been approved by the

American Lumber Standards Committee (ALSC) and is required for all Wood Packaging Material (WPM). WPM is defined as wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frames, and cleats. Packaging materials exempt from the requirements are materials that have undergone a manufacturing process such as corrugated fiberboard, plywood, particleboard, veneer and oriented strand board. All WPM shall be constructed from Heat Treated (HT to 56 degrees Centigrade for 30 continuous minutes) lumber and certified by an accredited agency recognized by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging

Material Enforcement Regulations (see URL: http://www.alsc.org ). All materials must include certification markings in accordance with

ALSC standards and be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment of materials at the point of entry.

9. Quality Assurance -The contractor is responsible for establishing a quality system. Full consideration to examinations, inspections, and tests will be given to ensure the acceptability of the commercial package.

Additional Transportation Requirements:

1. Estimated weight of the item in its shipping container is greater than 200 pounds, but less than 2,500 pounds.

2. Security Classification of material to be shipped: Unclassified.

3. Identify DOT container marking and the hazard classification: Non Hazardous (No DOT Marking Required).

4. Item is not AA&E.

9 46

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

5. No GFP applies to this contract.

*** END OF NARRATIVE D0001 ***

10 46

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

INSPECTION AND ACCEPTANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

2 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984

3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

11 46

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DELIVERIES OR PERFORMANCE

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.247-34 F.O.B. DESTINATION NOV/1991

12 46

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

CONTRACT ADMINISTRATION DATA

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS DEC/2018

(a) Definitions. As used in this clause--

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and

Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and

Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov ; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this

Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the

WAWF home page at https://wawf.eb.mil/ .

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer

Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items--

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

-1-

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

-2-

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some Combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in

13 46

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC -3-

Issue By DoDAAC -4-

Admin DoDAAC -5-

Inspect By DoDAAC -6-

Ship To Code -7-

Ship From Code -8-

Mark For Code -9-

Service Approver (DoDAAC) -10-

Service Acceptor (DoDAAC) -11-

Accept at Other DoDAAC -12-

LPO DoDAAC -13-

DCAA Auditor DoDAAC -14-

Other DoDAAC(s) -15-

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and

Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

-16-

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Contracting Office

U.S. Army Contracting Command - New Jersey

ACC-NJ-JA

Picatinny Arsenal, NJ 07806-5000

Contract Specialist

Marcus Edmundson

E-mail: marcus.l.edmundson.civ@mail.mil

Contracting Officer

Wilson Au

E-mail: wilson.w.au.civ@mail.mil

*** END OF NARRATIVE G0001 ***

14 46

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

CONTRACT CLAUSES

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

1 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE OCT/2018

2 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE AUG/2020

3 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH JUN/2020

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

4 52.212-4 CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS OCT/2018

5 52.222-21 PROHIBITION OF SEGREGATED FACILITIES APR/2015

6 52.222-26 EQUAL OPPORTUNITY SEP/2016

7 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING JUN/2020

8 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES JUN/2008

9 52.232-1 PAYMENTS APR/1984

10 52.232-8 DISCOUNTS FOR PROMPT PAYMENT FEB/2002

11 52.232-11 EXTRAS APR/1984

12 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS JUN/2013

13 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS DEC/2013

14 52.233-1 DISPUTES MAY/2014

15 52.233-3 PROTEST AFTER AWARD AUG/1996

16 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT/2004

17 52.243-1 CHANGES--FIXED PRICE AUG/1987

18 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) APR/1984

19 252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS SEP/2011

20 252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS SEP/2013

21 252.204-7004 ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS FEB/2019

22 252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING DEC/2019

23 252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION SUPPORT MAY/2016

24 252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS JAN/2021

EQUIPMENT OR SERVICES

25 252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS NOV/2020

26 252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS DEC/2018

27 252.232-7010 LEVIES ON CONTRACT PAYMENTS DEC/2006

28 252.232-7017 ACCELERATING PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS--PROHIBITION APR/2020

ON FEES AND CONSIDERATION

29 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR NOV/2020

EXECUTIVE ORDERS--COMMERCIAL ITEMS

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division

E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other

Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2020)

(Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)

(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the contracting officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Oct 1995)(41 U.S.C. 4704 and

10 U.S.C. 2402).

___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Jun 2020) (41 U.S.C. 3509).

15 46

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

___ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of

Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

_X_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note).

___ (5) [Reserved].

___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section

743 of Div. C).

_X_ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for

Debarment (Jun 2020) (31 U.S.C. 6101 note).

___ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).

___ (10) [Reserved]

___ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (MAR 2020) (15 U.S.C. 657a).

___ (ii) Alternate I (MAR 2020) of 52.219-3.

___ (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (MAR 2020) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

___ (ii) Alternate I (MAR 2020) of 52.219-4.

___ (13) [Reserved]

___ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

___ (ii) Alternate I (MAR 2020) of 52.219-6.

___ (iii) Alternate II (Nov 2011) of 52.219-6.

___ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020)(15 U.S.C. 644).

___ (ii) Alternate I (MAR 2020) of 52.219-7.

___ (iii) Alternate II (Mar 2004) of 52.219-7.

___ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)).

___ (17)(i) 52.219-9, Small Business Subcontracting Plan (Jun 2020) (15 U.S.C. 637(d)(4)).

___ (ii) Alternate I (Nov 2016) of 52.219-9.

___ (iii) Alternate II (Nov 2016) of 52.219-9.

___ (iv) Alternate III (Jun 2020) of 52.219-9.

___ (v) Alternate IV (Jun 2020) of 52.219-9.

___ (18)(i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

___ (ii) Alternate I (Mar 2020) of 52.219-13.

___ (19) 52.219-14, Limitations on Subcontracting (MAR 2020)(15 U.S.C. 637(a)(14)).

___ (20) 52.219-16, Liquidated Damages--Subcontracting Plan (JAN 1999) (15 U.S.C. 637(d)(4)(F)(i)).

___ (21) 52.219-27, Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside (MAR 2020)(15 U.S.C. 657 f)

16 46

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

_X_ (22) (i) 52.219-28, Post Award Small Business Program Rerepresentation (Nov 2020)(15 U.S.C. 632(a)(2)).

___ (ii) Alternate I (MAY 2020) of 52.219-28.

___ (23) 52.219-29 Notice of Total Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (MAR 2020)

(15 U.S.C. 637(m)).

___ (24) 52.219-30 Notice of Total Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (MAR

2020) (15 U.S.C. 637(m)).

_X_ (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).

_X_ (26) 52.219-33, Nonmanufacturer Rule (MAR 2020) (15 U.S.C. 637(a)(17)).

_X_ (27) 52.222-3, Convict Labor (June 2003)(E.O. 11755).

_X_ (28) 52.222-19, Child LaborCooperation with Authorities and Remedies (Jan 2020) (E.O. 13126).

___ (29) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

_X_ (30)(i) 52.222-26, Equal Opportunity (Sep 2016)(E.O. 11246).

___ (ii) Alternate I (Feb 1999) of 52.222-26.

___ (31)(i) 52.222-35, Equal Opportunity for Veterans (Jun 2020)(38 U.S.C. 4212).

___ (ii) Alternate I (July 2014) of 52.222-35.

___ (32)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020)(29 U.S.C. 793).

___ (ii) Alternate I (July 2014) of 52.222-36.

_X_ (33) 52.222-37, Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans (Jun

2020)(38 U.S.C. 4212).

___ (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

___ (35)(i) 52.222-50, Combating Trafficking in Persons (Oct 2020) (22 U.S.C. chapter 78 and E.O. 13627).

___ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

___ (36) 52.222-54, Employment Eligibility Verification (Oct 2015). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

___ (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008) (42 U.S.C.

6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

___ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

___ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (June, 2016) (E.O. 13693).

___ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (June, 2016) (E.O.

13693).

___ (40)(i) 52.223-13, Acquisition of EPEAT[supreg]-Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).

___ (ii) Alternate I (Oct 2015) of 52.223-13.

___ (41)(i) 52.223-14, Acquisition of EPEAT[supreg]-Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).

___ (ii) Alternate I (Jun 2014) of 52.223-14.

___ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (May 2020) (42 U.S.C. 8259b).

17 46

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

___ (43)(i) 52.223-16, Acquisition of EPEAT[supreg]-Registered Personal Computer Products (Oct 2015) (E.O.s 13423 and 13514).

___ (ii) Alternate I (Jun 2014) of 52.223-16.

_X_ (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Jun 2020) (E.O. 13513).

___ (45) 52.223-20, Aerosols (June, 2016) (E.O. 13693).

___ (46) 52.223-21, Foams (June, 2016) (E.O. 13693).

___ (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

___ (ii) Alternate I (JAN 2017) of 52.224-3.

___ (48) 52.225-1, Buy American--Supplies (MAY 2014) (41 U.S.C. chapter 83).

___ (49)(i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (MAY 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-

283, 110-138, 112-41, 112-42, and 112-43.

___ (ii) Alternate I (MAY 2014) of 52.225-3.

___ (iii) Alternate II (MAY 2014) of 52.225-3.

___ (iv) Alternate III (MAY 2014) of 52.225-3.

___ (50) 52.225-5, Trade Agreements (Oct 2019) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

___ (51) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.o.s, proclamations, and statutes administered by the

Office of Foreign Assets Control of the Department of the Treasury).

___ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

___ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

___ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007)(42 U.S.C. 5150).

___ (55) 52.229-12, Tax on Certain Foreign Procurements (JUN 2020).

___ (56) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002)(41 U.S.C. 4505, 10 U.S.C. 2307(f)).

_X_ (57) 52.232-30, Installment Payments for Commercial Items (Jan 2017)(41 U.S.C. 4505, 10 U.S.C. 2307(f)).

___ (58) 52.232-33, Payment by Electronic Funds Transfer -- System for Award Management (Oct 2018)(31 U.S.C. 3332).

___ (59) 52.232-34, Payment by Electronic Funds Transfer -- Other Than System for Award Management (Jul 2013)(31 U.S.C. 3332).

___ (60) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

___ (61) 52.239-1, Privacy or Security Safeguards (Aug 1996)(5 U.S.C. 552a).

___ (62) 52.242-5, Payments to Small Business Subcontractors (Jan 2017)(15 U.S.C. 637(d)(13)).

___ (63)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006)(46 U.S.C. Appx 1241(b) and 10 U.S.C.

2631).

___ (ii) Alternate I (Apr 2003) of 52.247-64.

___(iii) Alternate II (Feb 2006) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting

Officer has indicated as being incorporated in this contract by reference to implement provisions of law or executive orders applicable to acquisitions of commercial items:

___ (1) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).

___ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

___ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option

18 46

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

___ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41

U.S.C. chapter 67).

___ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or

Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).

___ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--

Requirements (MAY 2014) (41 U.S.C. chapter 67).

___ (7) 52.222-55, Minimum Wages Under Executive Order 13658 (Nov 2020) (Executive Order 13658).

___ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2017) (E.O. 13706).

___ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun 2020) (42 U.S.C. 1792).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records -- Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractors directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR

Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause--

(i) 52.203-13, Contractor Code of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .