Attachment 0001 - Statement of Work_DLS.docx
DOCX document 33 KB Posted
- Attached to
- Dielectric Spectroscope Federal contract opportunity
- Solicitation number
- W15QKN21R0071
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 0002- Contract Quality Requirements.docx | DOCX document | |
| W15QKN21R0071.pdf | ||
| A002-Security Training.pdf | ||
| A001-Accident Report.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
** Due to system limitations, special characters and symbols are not shown in this text. Please see attached Statement of Work in Section J **
Statement of Work
1.0 Introduction/Background
Explosives Research Branch needs a dielectric spectroscope to study amorphous and melt cast explosives.
2.0 Scope
To purchase a dielectric spectroscope system capable of rapid analysis of amorphous and melt cast explosives as they undergo melt.
3.0 Applicable Documents
NA
4.0 Requirements
The dielectric spectroscope shall be capable of the following.
Frequency Range of (3μHz to 20MHz).
Temperature Range of -100°C to 250°C Bias, ±40V, 70mA fast sampling rate (6ms/point)
This is critical to understanding how amorphous energetics function and how melt cast explosives undergo relaxation. The dynamic processing therefore, drives the requirements
5.0 Deliverables
1. One Dielectric Spectroscope
2. Operating Manual
3. Training on equipment
4. Installation support
6.0 Period of Performance
The equipment shall be installed at the following location listed below. Due to COVID-19 and the uncertainty when Picatinny will reopen, contractor shall not deliver any item(s) or begin performance at Picatinny until official authorization is provided by the PCO that work can commence. The date would be subject to further delay via contract modification depending upon the COVID-19 situation.
The Dielectric Spectroscope and Operating Manual shall be delivered by 5/1/2021
7.0 Shipping Provisions:
· The shipping address is: B3028, Picatinny Arsenal, NJ, 07054
· Place of Performance is Contractor’s facility.
· FOB Destination: B3028, Picatinny Arsenal, NJ 07806 ATTN: TBD
Non-Energetic Shipments:
Energetic Shipments: N/A
Classified Shipment Address: N/A
8.0 Reporting:
· None
9.0 Safety:
· AA&E Requirements: Identify all proposed use of Arms, Ammunition and Explosives (AA&E) as defined in DoD 5100.76M and AR 190-11 (Physical Security of Arms, Ammunition and Explosives) by nomenclature and NSN (if available). Provide risk factor sensitivity category. In the event of non-standard energetic components DoD 5100.76M section AP1.5 provides the Computation of Risk Factor Numerical Values and associated Risk Tables to determine the Risk Factor Sensitivity Category.
· Accident/Incident Report: The recipient shall report immediately any major accident/incident (including fire) resulting in any one or more of the following: causing one or more fatalities or one or more disabling injuries; damage of Government property exceeding $10,000; affecting initiative planning or production schedules; degrading the safety of equipment under contract, such as personnel injury or property damage may be involved; identifying a potential hazard requiring corrective action. The recipient shall prepare the report (DI-SAFT-81563) for each incident. (If applicable)
10.0 Environmental Requirements Pollution Prevention: Consideration should be given to alternative materials and processes in order to eliminate, reduce or minimize hazardous waste being generated. This is to be accomplished while minimizing item cost and risk to item performance.
· Environmental Compliance: All activities must be in compliance with Federal, State, and local environmental laws and regulations, Executive orders, treaties and agreements. The recipient shall evaluate the environmental consequences and identify the specific types and amounts of hazardous waste being generated during the conduct of efforts undertaken under an Ordnance Technology Initiative Agreement.
· Hazardous Waste Report: The recipient shall evaluate the environmental consequences and identify the specific types and amounts of hazardous waste being generated during this Ordnance Technology Initiative Agreement. The recipient shall submit a Hazardous waste report IAW DI-MGMT-80899.
· Disposal Instructions for Residual/Scrap Materials: The recipient shall dispose of all residual and scrap materials generated from this Ordnance Technology Initiative Agreement, including high explosives. The recipient shall specify the anticipated quantities, methods, and disposal costs.
· Ozone Depleting Chemical (ODC). Class 1 Ozone Depleting Chemicals (Class 1 ODCs) are used <or not used> in executing the SOW.
11.0 Security: The security level for this effort is UNCLASSIFIED
12.1 AT Level I Training. Requires the addition of: “All contractor employees, including subcontractor employees, requiring access to Department of Defense installations, facilities, or controlled access areas shall complete AT Level I awareness training within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies and within 12 months prior to travel outside of the US, then annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 14 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at http://jkodirect.jten.mil/.”
11.2 Access and General Protection/Security Policy and Procedures. Requires the addition of: “All contractor employees, including subcontractor employees, shall comply with all installation and facility access and local security policies and procedures (provided by the Government representative), and security/emergency management exercises. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements (CFR clause 52.204-9, Personal Identity Verification of Contract Personnel) as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. During FPCONs Charlie and Delta, services/installation access may be discontinued/postponed due to higher threat. Services will resume when FPCON level and or threat is reduced to an acceptable level as determined by the Installation Commander. Contractor personnel working on an installation are required to participate in the Installation Random Antiterrorism Measures Program as directed. Contractors may be subject to and must comply with vehicle searches, wearing of ID badges, etc. Failure to comply with policies and procedures could result in barred access onto the installation.
11.3 iWATCH (See Something, Say Something) Training. Requires the addition of: “All contractor employees, including subcontractor employees, shall receive training and participate in the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, and then annually thereafter. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 14 calendar days after completion of training by all employees and subcontractor personnel.” Slides available to COR at https://www.milsuite.mil/book/docs/DOC-284984
11.4 For contractors that do not require CAC, but require access to a DoD facility or installation. Requires the addition of: “Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (Army Directive 2014-05/AR 190-13); applicable installation, facility and area commander installation and facility access and local security policies and procedures (provided by Government representative); or, at OCONUS locations, in accordance with status-of-forces agreements and other theater regulations.”
11.5 Export Control Laws/International Traffic in Arms Regulation. Requires the addition of: “DFARS Clause 252.225-7048, Export-Controlled Items applies to this effort. All documents determined to contain export controlled technical data will be marked with the following notice: WARNING: - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., App. 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
11.6 For Contracts That Require a Government Provided OPSEC Standing Operating Procedure/Plan. Requires the addition of: “The contractor is subject to compliance with the CCDC Armaments Center Operations Security Plan, per AR 530-1 (or DoDM 5205.02-M). This SOP/Plan will specify the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.”
11.7 For Contracts That Require OPSEC Training. Requires the addition of: “Per AR 530-1 (or DoDM 5205.02-M), new contractor employees, including subcontractor employees, must complete initial (Level I) OPSEC training within 30 calendar days of reporting for duty and must also complete annual OPSEC awareness training as provided by the appropriately designated OPSEC level II trained OPSEC Officer/Coordinator. The Contracting Officer Representative (COR) or Agreements Officer Representative (AOR) can request CCDC Armaments Center OPSEC training from CCDC Armaments Center OPSEC POC e-mail:usarmy.pica.ccdc-ac.mbx.ardec-opsec@mail.mil.”
11.8 For Contracts that Involve the Public Release of Information. Requires the addition of: “Per AR 530-1 (or DoDM 5205.02-M), an OPSEC review is required prior to all public releases. All government information intended for public release by a contractor will undergo a government OPSEC review prior to release.”
| 12.0 | Government Furnished Materials/Facilities: |
| Lists any physical/tangible items provided by the Government that the Contractor will be accountable for during performance and/or at the end of the initiative agreement. NONE |
13.0 Technical Representative: TBD