Questions and Answers 1.docx

DOCX document 13 KB Posted

Attached to
Replace Doors at OMS and Training Bldg/Paint OMS Ceiling; Farrell, PA Federal contract opportunity
Solicitation number
W15QKN-20-Q-5363
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to Replace Doors at OMS and Training Bldg/Paint OMS Ceiling; Farrell, PA, newest first.
File Type Posted
Questions and Answers - 2.docx DOCX document
Farrell - Door Project.pdf PDF
Contractor Cost Breakdown Form.xls XLS spreadsheet
Solicitation_W15QKN-20-Q-5363.pdf PDF
PA027 Farrell A2 CSS 5003 Floor Plan Paint OMS Ceilings .pdf PDF
DBA PA20200097 08072020.docx DOCX document
PA027 Farrell A2 CSS 5003 SOO Paint OMS ceilings 10 25 2019.DOCX DOCX document
PA027 Farrell A2 CSS 5003 SOW Paint OMS ceilings V4 10 25 2019.DOCX DOCX document
PA027-Farrell-A2-CSS 17022-SOW-Replace doors at OMS and Training Bldg.docx DOCX document
PA027 Farrell A2 CSS 5003 Pictures Paint the OMS ceiling and convert the tool storage room int.pptx PPTX presentation
PA027-Farrell-A2-CSS 17022-SOO-Repair doors.docx DOCX document
PA027-Farrell-A2-CSS 17022-Farrell Motor Pool Door.jpg JPG image
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Replace Doors at OMS and Training BLDG/Paint OMS Ceiling at Pendel-Caminiti USARC Solicitation Number: W15QKN-20-Q-5363

Q: The Power Point attached with the solicitation shows an office to be built in an existing tool room with HVAC etc. Is this to be part of the SOW?

A: If not specifically listed in the SOW, then it does not apply to this effort. The office work was taken out of the SOW, however the PowerPoints were not updated.

Q: The SOW for the doors in the Training Center and OMS building is a bit confusing. Can you please clarify the 11.3 Scope of work in its entirety?

A: We are replacing 3 exterior doors and frames and we are replacing 1 interior door and frame with a dutch door for the maintenance building. For the training center we are replacing one single door and frame with a dutch door. We are also replacing two sets of double doors or 4 doors each with two of the doors being dutch doors and the other two doors being a standard door. So one set of double doors will have a dutch door on one side and a standard door on the other side of the double doors.

Q: Can you provide a drawing showing the locations and title of were the doors need replaced and where to locate the Dutch doors?

A: Please see attached drawing of door locations to be replaced and which ones require a dutch door. Attachment: Farrell – Door Project

Q: The Small Bay in the OMS building is extremely cluttered with Books Manuals Chairs etc. Are we going to be required to move and store these items for the duration of the project or will these items and equipment be moved?

A: No. This a general housekeeping issue with the facility and the equipment is the units equipment and will be cleaned up by the units and the facility prior to the work starting. I will address this issue with the Facility Coordinator and Center Commander.

File details come from the government source that posted it. Updated .