Contractor Cost Breakdown Form.xls

XLS spreadsheet 185 KB Posted

Attached to
Replace Doors at OMS and Training Bldg/Paint OMS Ceiling; Farrell, PA Federal contract opportunity
Solicitation number
W15QKN-20-Q-5363
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to Replace Doors at OMS and Training Bldg/Paint OMS Ceiling; Farrell, PA, newest first.
File Type Posted
Questions and Answers - 2.docx DOCX document
Questions and Answers 1.docx DOCX document
Farrell - Door Project.pdf PDF
Solicitation_W15QKN-20-Q-5363.pdf PDF
PA027 Farrell A2 CSS 5003 Floor Plan Paint OMS Ceilings .pdf PDF
DBA PA20200097 08072020.docx DOCX document
PA027-Farrell-A2-CSS 17022-SOW-Replace doors at OMS and Training Bldg.docx DOCX document
PA027 Farrell A2 CSS 5003 Pictures Paint the OMS ceiling and convert the tool storage room int.pptx PPTX presentation
PA027-Farrell-A2-CSS 17022-SOO-Repair doors.docx DOCX document
PA027-Farrell-A2-CSS 17022-Farrell Motor Pool Door.jpg JPG image
PA027 Farrell A2 CSS 5003 SOO Paint OMS ceilings 10 25 2019.DOCX DOCX document
PA027 Farrell A2 CSS 5003 SOW Paint OMS ceilings V4 10 25 2019.DOCX DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet2

IDSortTypeDescription (to include labor,equipment, material type and grade)QuantityUnit MeasureLabor in ManhoursEquipmentMaterialTotal Cost
Crew (skill set)Labor HoursTotal HrsCity Cost IndexUnit Cost*Total Labor Cost*Unit CostTotal Equipment CostCity Cost IndexUnit CostTotal Material Cost
Totals
GENERAL CONTRACTOR
OVERHEAD$ - 0
$ - 0
PROFIT$ - 0
$ - 0
BOND$ - 0
G & A$ - 0
GRAND TOTAL$ - 0
Unit Cost*Cost for one labor hour of the specified crew
Total Labor Cost*"=Unit Cost x Total Hours"