5033 Solicitation QA 02-04-20 R1.pdf

PDF 114 KB Posted

Attached to
CSS 4457 POV Parking Lot Lighting- Updated 2/13/2020 Federal contract opportunity
Solicitation number
W15QKN-20-Q-5033
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to CSS 4457 POV Parking Lot Lighting- Updated 2/13/2020, newest first.
File Type Posted
20-Q-5033 0002 Solicitation (released).pdf PDF
20-Q-5033 P00001 Solicitation (released).pdf PDF
Attachment 0003 Contractor Cost Breakdown Form.xls XLS spreadsheet
Attachment 0002 WV002-Beaver-CSS 4457-SHPO Letter & Map.pdf PDF
20-Q-5033 Solicitation (Released).pdf PDF
Attachment 0001 WV002 - BEAVER-CSS 4457- Suggested Layout Plan.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Questions and Answers

W15QKN-20-R-5033

POV Parking Lights- CSS 4457

5 February 2020

Q1- 11.3.1.1: Are OSHA-30 trained individuals necessary on site for this project?

A1- They are not. Section 11.3.1.1. has been removed from SOW.

Q2- 11.3.2.1 (11.7.3): Are DOD CAC credentials required for this project (work outside of building)? If so, when (at bid time or to begin actual work?). Also - how many (11.7.2 mentions a minimum of 3;

elsewhere it is 2).

A2- No. Section 11.3.2.1. has been removed from SOW.

Q3- 11.4.2: Will storage be available inside the fenced area?

A3- Storage shall be coordinated with COR and/or RFOS and as per section 1.1.1. of SOW.

Q4- Will the period of performance be extended if manufacturer lead time is significantly long?

A4- Contractor shall maintain project communication with COR at all times. Only the COR is able to approve POP times.

Q5- In the SOW it specifies concrete steel reinforced pole bases. Can direct burial poles be used?

A5- No. Contractor shall supply and install poles as shown in SOW.

Q6- Are there any windloads that the new installed poles need to meet?

A6- Contractor shall adhere to the UFGS guidance specifications.

Q7- Is the Government or Contractor responsible for locating sub surface utilities? If so are there any drawings available showing existing electrical, sanitary, water, irrigation, fiber or telecom lines?

A7- Yes. As per section 11.2.1.: Contractor shall notify “WV811 – Call before you dig” as per

WV State Law. WV State Law requires WV811 be notified a least two business days prior to excavation. WV811 – 1-800-245-4848.

Q8- Are there any amp hour battery specifications for this contract or is it the responsibility of the

Contractor to ensure there is enough reserve power for inclement weather conditions?

A8- Contractor shall supply and install lighting systems in accordance with but not limited to section

11.8.1. of the SOW.