5033 Solicitation QA 02-04-20 R1.pdf
PDF 114 KB Posted
- Attached to
- CSS 4457 POV Parking Lot Lighting- Updated 2/13/2020 Federal contract opportunity
- Solicitation number
- W15QKN-20-Q-5033
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 20-Q-5033 0002 Solicitation (released).pdf | ||
| 20-Q-5033 P00001 Solicitation (released).pdf | ||
| Attachment 0003 Contractor Cost Breakdown Form.xls | XLS spreadsheet | |
| Attachment 0002 WV002-Beaver-CSS 4457-SHPO Letter & Map.pdf | ||
| 20-Q-5033 Solicitation (Released).pdf | ||
| Attachment 0001 WV002 - BEAVER-CSS 4457- Suggested Layout Plan.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Questions and Answers
W15QKN-20-R-5033
POV Parking Lights- CSS 4457
5 February 2020
Q1- 11.3.1.1: Are OSHA-30 trained individuals necessary on site for this project?
A1- They are not. Section 11.3.1.1. has been removed from SOW.
Q2- 11.3.2.1 (11.7.3): Are DOD CAC credentials required for this project (work outside of building)? If so, when (at bid time or to begin actual work?). Also - how many (11.7.2 mentions a minimum of 3;
elsewhere it is 2).
A2- No. Section 11.3.2.1. has been removed from SOW.
Q3- 11.4.2: Will storage be available inside the fenced area?
A3- Storage shall be coordinated with COR and/or RFOS and as per section 1.1.1. of SOW.
Q4- Will the period of performance be extended if manufacturer lead time is significantly long?
A4- Contractor shall maintain project communication with COR at all times. Only the COR is able to approve POP times.
Q5- In the SOW it specifies concrete steel reinforced pole bases. Can direct burial poles be used?
A5- No. Contractor shall supply and install poles as shown in SOW.
Q6- Are there any windloads that the new installed poles need to meet?
A6- Contractor shall adhere to the UFGS guidance specifications.
Q7- Is the Government or Contractor responsible for locating sub surface utilities? If so are there any drawings available showing existing electrical, sanitary, water, irrigation, fiber or telecom lines?
A7- Yes. As per section 11.2.1.: Contractor shall notify “WV811 – Call before you dig” as per
WV State Law. WV State Law requires WV811 be notified a least two business days prior to excavation. WV811 – 1-800-245-4848.
Q8- Are there any amp hour battery specifications for this contract or is it the responsibility of the
Contractor to ensure there is enough reserve power for inclement weather conditions?
A8- Contractor shall supply and install lighting systems in accordance with but not limited to section
11.8.1. of the SOW.