Attachment_0002_QASP_DCS.DOCX
DOCX document 14 KB Posted
- Attached to
- Direct Current Sintering (DCS) Equipment, Installation and Training Federal contract opportunity
- Solicitation number
- W15QKN19Q0114
About this file
Attachment 0002 - QASP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_0003_Evaluation_Criteria_LPTA-_DCS_Equipment.docx | DOCX document | |
| Attachment_0001-_Contract_Quality_Requirements_-DCS.DOCX | DOCX document | |
| W15QKN-19-Q-0114_-_Exhibit_A_-_CDRLS_A001-A005.pdf | ||
| W15QKN19Q0114_(Conformed).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE REQUIREMENTS SUMMARY / QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
QUALITY ASSURANCE SURVEILLANCE PLAN
| Performance Requirements |
| Performance |
Measure Performance Standard
Acceptable Performance Level
(APL)
Method of Surveillance Compliance (Exceeded, Met or Partially Met)
Delivery of Equipment
Completeness
Timeliness
Quality
The Contractor shall deliver all equipment
The Contractor shall perform tasks in PoP defined.
The Contractor shall ensure equipment is fully operational 100% Compliance
100 % Compliance
100% Compliance
Government POC Review
Training
Completeness
Timeliness
Quality
The Contractor shall provide training to address all areas of subject matter identified.
The Contractor shall provide training upon completion of installation.
Training material should be comprehensive and use the most suitable medium.
100% Compliance
100 % Compliance
100% Compliance
Government POC Review
| iWATCH & AT Training |
| Reporting |
| 45 days after contract award and annually thereafter |
| 100% |
| Report from the Contractor |
| Installation Access & Security Policies |
| Reporting |
| Reporting as received |
| No more than one incident per contractor per period of performance |
| Incident Reporting |
| OPSEC Training |
| Reporting |
| 30 days after contract award and annually thereafter |
| Received and Tracked by Government POC |
| Report from the Contractor |
File details come from the government source that posted it.