Attachment_0002_QASP_DCS.DOCX

DOCX document 14 KB Posted

Attached to
Direct Current Sintering (DCS) Equipment, Installation and Training Federal contract opportunity
Solicitation number
W15QKN19Q0114
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

Attachment 0002 - QASP

View the file

Other files for this federal contract opportunity

Other files attached to Direct Current Sintering (DCS) Equipment, Installation and Training, newest first.
File Type Posted
Attachment_0003_Evaluation_Criteria_LPTA-_DCS_Equipment.docx DOCX document
Attachment_0001-_Contract_Quality_Requirements_-DCS.DOCX DOCX document
W15QKN-19-Q-0114_-_Exhibit_A_-_CDRLS_A001-A005.pdf PDF
W15QKN19Q0114_(Conformed).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE REQUIREMENTS SUMMARY / QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

QUALITY ASSURANCE SURVEILLANCE PLAN

Performance Requirements
Performance

Measure Performance Standard

Acceptable Performance Level

(APL)

Method of Surveillance Compliance (Exceeded, Met or Partially Met)

Delivery of Equipment

Completeness

Timeliness

Quality

The Contractor shall deliver all equipment

The Contractor shall perform tasks in PoP defined.

The Contractor shall ensure equipment is fully operational 100% Compliance

100 % Compliance

100% Compliance

Government POC Review

Training

Completeness

Timeliness

Quality

The Contractor shall provide training to address all areas of subject matter identified.

The Contractor shall provide training upon completion of installation.

Training material should be comprehensive and use the most suitable medium.

100% Compliance

100 % Compliance

100% Compliance

Government POC Review

iWATCH & AT Training
Reporting
45 days after contract award and annually thereafter
100%
Report from the Contractor
Installation Access & Security Policies
Reporting
Reporting as received
No more than one incident per contractor per period of performance
Incident Reporting
OPSEC Training
Reporting
30 days after contract award and annually thereafter
Received and Tracked by Government POC
Report from the Contractor

File details come from the government source that posted it.