SPREADSHEET_Repair_HVAC_Controls.xls

XLS spreadsheet 48 KB Posted

Attached to
REPAIR/REPLACE HVAC CONTROLS, ROCHESTER, NY Federal contract opportunity
Solicitation number
W15QKN-18-Q-1166
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

ALL CONTRACTORS WHO BID MUST SUBMIT THIS SPREADSHEET IN ADDITION TO THE SOLICITATION

View the file

Other files for this federal contract opportunity

Other files attached to REPAIR/REPLACE HVAC CONTROLS, ROCHESTER, NY, newest first.
File Type Posted
1M-602.png PNG image
1M-706.png PNG image
1M-707.png PNG image
1M-704.png PNG image
1M-702.png PNG image
1M-705.png PNG image
md1.png PNG image
1M-504.png PNG image
1M-703.png PNG image
SOLICITATION_HVAC_CONTROLS_ROCHESTER,_NY.docx DOCX document
REVISED_NY126_Chili_A2_CSS_6114_SOW_Repair_HVAC_Controls.doc DOC document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

HVAC Chili USARC, Rochester, NY
IDSortTypeDescriptionQuantityUnit MeasureMaterial
Labor HoursCity Cost IndexCostCity Cost IndexBare Material CostTotal
Field personnel, field engineer, average3Week
Field personnel, project manager, average3Week
Control components/DDC system, subcontractor's quote incl. material & labor, DDC controller (average 50' run in conduit), mechanical room, 32 point controller, incl. 120V/1 phase power supply5Ea.
Control components/DDC system, subcontractor's quote incl. material & labor, DDC controller (average 50' run in conduit), mechanical room, 16 point controller, incl. 120V/1 phase power supply2Ea.
Control components/DDC system, applications software, optimum start/stop3Point
Control components/DDC system, applications software, demand limiting2Point
Control components/DDC system, applications software, enthalpy program2Point
Control components/DDC system, applications software, boiler optimization2Ea.
Control components/DDC system, applications software, chiller optimization1Ea.
Control components/DDC system, applications software, time program42Point
Control components/DDC system, front end costs, computer (PC) with software program1Ea.
Control components/DDC system, front end costs, color graphics software1Ea.
Control components/DDC system, front end costs, engineering labor, excl. drafting137Point
Control components/DDC system, front end costs, calibration labor50Point
Control components/DDC system, front end costs, startup, checkout labor137Point
Balancing, air, heating and ventilating unit, (Subcontractor's quote including material & labor)2Ea.
Balancing, air conditioning equipment, multi-zone A.C. and heating unit, (Subcontractor's quote including material & labor)2Ea.
Switching and routing equipment, network switch, 10/100/Mbps, 6 Port, industrial ethernet type1Ea.
control components, thermostats, 3 wire10.00Ea.
Totals