SPREADSHEET_Repair_HVAC_Controls.xls
XLS spreadsheet 48 KB Posted
- Attached to
- REPAIR/REPLACE HVAC CONTROLS, ROCHESTER, NY Federal contract opportunity
- Solicitation number
- W15QKN-18-Q-1166
About this file
ALL CONTRACTORS WHO BID MUST SUBMIT THIS SPREADSHEET IN ADDITION TO THE SOLICITATION
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1M-602.png | PNG image | |
| 1M-706.png | PNG image | |
| 1M-707.png | PNG image | |
| 1M-704.png | PNG image | |
| 1M-702.png | PNG image | |
| 1M-705.png | PNG image | |
| md1.png | PNG image | |
| 1M-504.png | PNG image | |
| 1M-703.png | PNG image | |
| SOLICITATION_HVAC_CONTROLS_ROCHESTER,_NY.docx | DOCX document | |
| REVISED_NY126_Chili_A2_CSS_6114_SOW_Repair_HVAC_Controls.doc | DOC document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| HVAC Chili USARC, Rochester, NY | |||||||||||
| ID | Sort | Type | Description | Quantity | Unit Measure | Material | |||||
| Labor Hours | City Cost Index | Cost | City Cost Index | Bare Material Cost | Total | ||||||
| Field personnel, field engineer, average | 3 | Week | |||||||||
| Field personnel, project manager, average | 3 | Week | |||||||||
| Control components/DDC system, subcontractor's quote incl. material & labor, DDC controller (average 50' run in conduit), mechanical room, 32 point controller, incl. 120V/1 phase power supply | 5 | Ea. | |||||||||
| Control components/DDC system, subcontractor's quote incl. material & labor, DDC controller (average 50' run in conduit), mechanical room, 16 point controller, incl. 120V/1 phase power supply | 2 | Ea. | |||||||||
| Control components/DDC system, applications software, optimum start/stop | 3 | Point | |||||||||
| Control components/DDC system, applications software, demand limiting | 2 | Point | |||||||||
| Control components/DDC system, applications software, enthalpy program | 2 | Point | |||||||||
| Control components/DDC system, applications software, boiler optimization | 2 | Ea. | |||||||||
| Control components/DDC system, applications software, chiller optimization | 1 | Ea. | |||||||||
| Control components/DDC system, applications software, time program | 42 | Point | |||||||||
| Control components/DDC system, front end costs, computer (PC) with software program | 1 | Ea. | |||||||||
| Control components/DDC system, front end costs, color graphics software | 1 | Ea. | |||||||||
| Control components/DDC system, front end costs, engineering labor, excl. drafting | 137 | Point | |||||||||
| Control components/DDC system, front end costs, calibration labor | 50 | Point | |||||||||
| Control components/DDC system, front end costs, startup, checkout labor | 137 | Point | |||||||||
| Balancing, air, heating and ventilating unit, (Subcontractor's quote including material & labor) | 2 | Ea. | |||||||||
| Balancing, air conditioning equipment, multi-zone A.C. and heating unit, (Subcontractor's quote including material & labor) | 2 | Ea. | |||||||||
| Switching and routing equipment, network switch, 10/100/Mbps, 6 Port, industrial ethernet type | 1 | Ea. | |||||||||
| control components, thermostats, 3 wire | 10.00 | Ea. | |||||||||