W15QKN-16-R-0019_Amendment_04.pdf

PDF 42 KB Posted

Attached to
SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL Federal contract opportunity
Solicitation number
W15QKN16R0019
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

Amendment 0004

View the file

Other files for this federal contract opportunity

Other files attached to SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL, newest first.
File Type Posted
W15QKN-16-R-0019_Amendment_03.pdf PDF
Attachment_0008_CPFF_Labor_Rate_Table.xlsx XLSX spreadsheet
Attachment_0007_FFP_Labor_Rate_Table.xlsx XLSX spreadsheet
W15QKN-16-R-0019_Amendment_03.pdf PDF
W15QKN-16-R-0019-0002.pdf PDF
W15QKN16R0019-0001.pdf PDF
Attachment_0007_FFP_Requirements.xlsx XLSX spreadsheet
Attachment_0008_CPFF_Requirements.xlsx XLSX spreadsheet
0002_-_Non-Disclosure_and_Non-Use_Agreement_Small_Cal_NRE.doc DOC document
Exhibit_0001_CDRLS_DD1423.pdf PDF
0006_AMSTA-AR_1350_Tech_Data_Request_Questionnaire.pdf PDF
0004_Clearance_of_Tech_Info_for_Public_Release.pdf PDF
0003_Disclosure_of_Lobbying_Activities.pdf PDF
0005_Military_Critical_Technical_Data_Agreement_DD2345.pdf PDF
W15QKN16R0019.pdf PDF
0001_Past_Performance_Questionnaire.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0004 2016AUG25

W15QKN

ARMY CONTRACTING COMMAND - NJ

PICATINNY ARSENAL, NJ 07806-5000

MARGARET A HEYRICH

EMAIL: MARGARET.A.HEYRICH.CIV@MAIL.MIL

W15QKN-16-R-0019

2016JUL08

X

X

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 13

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: MARGARET A HEYRICH

Buyer Office Symbol/Telephone Number: ACC-NJ-MA/(973)724-3871

Type of Contract 1: Firm Fixed Price

Type of Contract 2: Cost Plus Fixed Fee

Kind of Contract: Service Contracts

*** End of Narrative A0000 ***

1. The prupose of Amendment 0004 is to answer questions from industry.

QUESTION 1: Does an Offerors proposal, in responding to Section L, need to be responsive with regard to capabilities and prior experience (for purpose of the Governments evaluation) to all Sections of Section C, Statement of Work, and the CDRLs?

Answer: Yes. The Offeror shall provide detailed narrative discussions that address the SOW as well as all of the Contract Data

Requirements List (CDRLs). Except for prior experience submissions in the Past Performance Volume, all supporting information submitted in response to Section L.4 should be specific to Small Caliber (SC) Ammunition Engineering Design and Manufacturing Technology to

Support SC Programs.

QUESTION 2: If an Offeror provides sufficient response to the Section L requirements while acknowledging an understanding (not necessarily currently capable or with prior experience) of the potential tasks of Section 3.1, 3.2, and 3.3, will the Offerors proposal be considered responsive?

Answer: Yes. The Government expects that there are Offerors who may not currently have all of the required capabilities. Offerors should acknowledge areas where capabilities are not currently met, and provide detail on how those areas would be met if selected for award.

Question 3: In regard to Volume V, is any Pricing Data to be included in Volume V, such as the active Attachment 0007 and 0008 excel sheets or other price supporting excel sheets? How about the hard copies? What volumes are they to be contained in? Are the CDs (the number required) to be delivered with each Volume, all in Volume V or delivered in a separate package?

Answer: No, attachment 0007 and 0008 excel sheets and other price supporting data shall be included in Price Volume II. Paper copies are to be contained within the volumes. CDs (the number required) are to be delivered with each volume in Volume V.

2. Section L.3.1 was updated to show that there is no page limit for Volume IV Small Business Participation.

3. The Small Business Subcontracting Plan shall be submitted in Volume V.

4. All terms and conditions remain the same and are in full force and effect.

*** END OF NARRATIVE A0005 ***

2 13

W15QKN-16-R-0019 0004

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L.1 PROPOSAL SUBMISSION

L.1.1 Introduction: This section contains general proposal submissions instructions as well as specific proposal requirements for

Small Caliber (SC) Ammunition Engineering Design and Manufacturing Technology to Support Small Caliber (SC) Programs.

L.1.2 General: The proposal shall be presented in sufficient detail to allow Government evaluation of response to the requirements of the Request for Proposal (RFP). The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.

L.2. PROPOSAL INSTRUCTIONS:

L.2.1 General:

L.2.1.1 Offerors shall provide information by addressing each Factor/Subfactor in the format and sequence identified in the solicitation. The Offerors must provide information in sufficient detail to allow the Government to make a best value assessment of the

Offerors capability to support the proposed response to the evaluation criteria. Proposals that do not contain the information requested in the solicitation risk being determined unacceptable by the Government. The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.

L.2.1.2 The proposal must not merely repeat the solicitation requirements, but rather must provide convincing documentary evidence in support of conclusive statements of how contract requirements will be met.

L.2.1.3 The Government intends to award without discussions (see FAR 52.215-1). Proposals that do not contain the information requested in the solicitation risk being determined Unacceptable by the Government. The Government will not assume the Offeror possesses any capability, understanding, or commitment not specified in the proposal.

L.2.1.4 Alternate Proposals: Alternate proposals will not be accepted.

L.2.1.5 Proposals shall be valid through six months after close of solicitation.

L.2.2 All questions concerning this procurement, either technical or contractual, must be submitted in writing to the Contracting

Officer. No direct discussion between a technical representative and a prospective Offeror will be allowed. Questions and proposals shall be sent to the following point of contact:

Army Contracting Command New Jersey

ACC-NJ- MA, Bldg. 10

ATTN: Margaret Heyrich/Telephone: (973)724-3871

Picatinny Arsenal, NJ 07806-5000

E-mail: margaret.a.heyrich.civ@mail.mil

Please note that electronic e-mail proposal submissions will not be accepted.

L.2.3 The proposal shall consist of the following:

L.2.3.1 Each proposal shall be submitted in the English language and consist of and include all of the following:

a. One (1) signed and completed paper copy of the attached Standard Form 33 (SF 33) and continuation sheets (Sections A through M) signed by a person authorized to enter into the proposed contract on behalf of the Offeror. Acknowledgment of all amendments to the solicitation and all continuation sheets are to be filled in as directed, i.e., proposed prices in the Pricing Matrices in Section B, any fill-ins required, such as Contract Data Requirements List DD Form 1423 with Blocks 17 and 18 completed if required, and

Certifications and Representations in Section K. Offerors are directed to thoroughly read the solicitation and fill in the required information in the appropriate solicitation clauses. For any fill-ins that are not applicable, the Offeror must acknowledge by indicating N/A. The proposal must also include computation for the use of Government Property, if applicable.

b. Original and three (3) paper copies and three (3) electronic CD copies of the Technical proposal volumes, and one (1) paper copy and two (2) electronic CD copies of the Price, Past Performance, and Small Business Participation volumes, as reflected in L.3., shall be compiled using the Microsoft Office for Windows suite of applications, submitted on a single-write CD-ROM to prevent accidental erasure of the data therein, and formatted for an MS Windows compatible computer. The Price Factor shall be contained on a separate CD from non-price Factors. Price breakdown will include MS Excel spreadsheets with formulae intact. Process flows may be delivered in hard copy if not compatible with the above software. CD copy must mirror the submitted hard copies. If the CD copy and hard copy differ, the CD copy supplied for each Factor will be used for the evaluation. Each CD must be clearly marked with the Offerors Name and the Solicitation

Number. Alternatively, files may be provided in Portable Document Format (.pdf).

c. Representations through System for Award Management. The purpose of electronic Representations and Certifications is to provide all

3 13

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Offerors with a portal in which to submit Reps/Certs in a publicly accessible format, nullifying the requirement to submit identical information in response to each and every Federal contract solicitation. As a requirement under the instant solicitation, all Offerors must submit Reps/Certs data into the System for Award Management (S.A.M.) at https://www.sam.gov/ and provide one (1) hard copy and one

(1) electronic copy (on CD) submitted as an .XPS file. Any Offeror that has previously submitted Reps/Certs data into SAM is reminded to update the data prior to submitting with the proposal.

L.2.3.2 Each Large Business Offeror shall provide a Small Business Subcontracting Plan that contains all the elements required by FAR

52.219-9, Alternate II. This plan shall be incorporated into any resultant contract.

L.3. FORMAT FOR PROPOSALS

L.3.1 The Offerors proposal shall be submitted in severable volumes based on the Factors as set forth below and all information specific to each Factor shall be confined to that volume. Each proposal must include all volumes and shall be submitted by the closing date and time of the solicitation. Failure to provide any volume may result in the proposal being given an Unacceptable rating. Information provided shall be specific to each Factor.

Page limitation for each Volume is as follows:

Volume I: Technical Factor (Maximum of 100 pages)*

Volume II: Price Factor (No Maximum)

Volume III: Past Performance Factor (Maximum of 20 pages)

Volume IV: Small Business Participation (No Maximum)

Volume V: Solicitation, Offer and Award Documents and Certifications/Representations

*100 pages for Technical Factor exclusive of Resumes.

L.3.2 Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and solicitation number in the header and/or footer. A Table of Contents should be created using the Table of Contents feature in MS Word. MS Word (.doc) files shall use the following page setup parameters:

Margins Top, Bottom, Left, Right - 1

Gutter 0

From Edge Header, Footer 0.5

Page Size, Width 8.5

Page Size, Height 11

L.3.3 Length:

L.3.3.1 Each volume shall be as brief as possible, consistent with complete submission. The page count will be made by counting the pages from left to right, consecutively. Pages that exceed the page limitation will not be evaluated. Each paragraph shall be separated by at least one blank line. Annexes, documentation and attachments that are submitted by the Offeror, which are not required as part of the RFP, will count against the page limitations. If pages are printed on both sides, each side will count as a separate page. The following will not count against page limitations: volume title pages, table of contents pages, cross-referencing pages, indices, acronym lists and page dividers (used to separate proposal sections). Pages should not exceed 8-1/2 inches in width by 11 inches in length; foldout pages depicting such items as sketches, factory floor layouts, etc. may be used, with each fold counted as one page. The font used shall not be less than 10 point.

L.3.3.2 Deviation from Requested Format. Request for deviations from the requested format shall be submitted to the Procuring

Contracting Officer (PCO) no later than fifteen (15) days after release of the solicitation. Offerors shall provide an explanation, in a clearly relatable format such as a matrix, of any differences between the manner in which the proposal was requested and the manner in which it is proposed to be submitted.

L.3.3.3 The Offeror is responsible for including sufficient details to permit a complete and accurate evaluation of the proposal.

Offerors shall provide a proposal that, at a minimum, addresses those evaluation Factors and Subfactors required in Section M of the

RFP.

L.3.3.4 File Packaging - All of the proposal files shall be compressed (zipped) into one file using WinZip version 6.2 or later, or as separate uploads in their native format, i.e. doc, xls, ppt, etc. Please note Self extracting .exe files will not be accepted.

L.4 SPECIFIC PROPOSAL INSTRUCTIONS

Offerors are responsible for including sufficient details (i.e. drawings, test data) to permit a complete and accurate evaluation strictly from a technical standpoint. The Technical Volume(s) shall have a separate index, which contains narrative titles that are cross-referenced to both the applicable Statement of Work (SOW) paragraph and page number. This index shall not count against the Page limitation for the Technical Volume. The narrative discussions shall also be related to the applicable SOW paragraph by placing the

4 13

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

appropriate SOW number at the beginning of the discussion text. The proposal shall be detailed and clearly stated to allow an assessment by the Government without the need for additional clarifications. The Offeror shall provide detailed narrative discussions that address both the SOW and the Contract Data Requirements List (CDRLs) of the solicitation. All information and data provided shall be specific to the Small Caliber (SC) Ammunition Engineering Design and Manufacturing Technology to Support Small Caliber (SC) Programs, except for the area of Past Performance. In the response to the Request for Proposal, the Offeror must address the following Factors and Subfactors:

L.4.1 VOLUME I - FACTOR I: TECHNICAL

The Offeror shall provide detailed responses demonstrating an understanding of the technical requirements of the program and adequacy of knowledge for each experience listed for each requirement stated in the solicitation. The Offeror shall provide a summary of how their responses to the following Technical Subfactors meets the objective of the Technical Factor by demonstrating an understanding of the technical requirements of the program stated in the solicitation. The Offerors response shall adequately and completely consider, define and satisfy the requirements specified in the solicitation.

L.4.1.1 Subfactor 1 Small Caliber Experience

The Offeror shall define and describe their Small Caliber experience, discussing in detail their capabilities for conducting and supporting all contract tasks, based on the requirement listed below:

a) Evidence and details of knowledge and prior experience in ammunition and ammunition component design and development through low rate initial production of Rimfire ammunition, Pistol ammunition, Shotshell ammunition and Centerfire ammunition. Centerfire ammunition defined as 5.56mm to .50 caliber.

b) Evidence and details of knowledge and prior experience in ammunition and ammunition component manufacturing and inspection of Rimfire ammunition, Pistol ammunition, Shotshell ammunition and Centerfire ammunition. Centerfire ammunition defined as 5.56mm to .50 caliber.

c) Evidence and details of knowledge and prior experience with ammunition and ammunition component non-destructive and destructive testing, including ballistic testing, of Rimfire Ammunition, Pistol ammunition, Shotshell ammunition and Centerfire ammunition.

Centerfire ammunition defined as 5.56mm to .50 caliber. As a minimum, ballistic testing shall include pressure, velocity, dispersion

(200m) and function & casualty.

d) Evidence and details of knowledge and prior experience in ballistic testing, non-destructive testing, interior and exterior aero-ballistic testing and evaluation of small caliber projectiles.

e) Evidence and details of knowledge and prior experience in the areas of handling, storing, designing, developing, manufacturing, assembling and testing of items and assemblies containing energetic materials (e.g., explosives, pyrotechnics and propellants). NOTE:

This shall include the containers of raw energetics materials as well as the items and assemblies that contain energetic materials.

f) Evidence and details of knowledge and prior experience of small caliber engineering support to include finite element stress analysis, interior ballistics analysis, tolerance studies, material evaluation, computer analysis, strength of design, aero-ballistic studies reviews, fault tree, cost analysis, root cause analysis, risk analysis and shock and vibration analysis.

L.4.1.2 Subfactor 2 Facilities, Equipment and Suppliers

The Offeror shall define and describe their Facilities, Equipment and Suppliers for Small Caliber requirements, discussing in detail their capabilities for conducting and supporting all contract tasks, based on the requirements listed below:

a) Evidence of the adequacy and availability of facilities, equipment and suppliers/sub-contractors necessary to perform design and development work on Rimfire, Pistol, Shotshell and Centerfire ammunition and ammunition components. Centerfire ammunition is defined as

5.56mm to .50 caliber.

b) Evidence of the adequacy and availability of facilities, equipment and suppliers/sub-contractors necessary to fabricate and inspect small developmental quantities (up to 5M cartridges per year for each caliber of cartridges) of Rimfire, Pistol, Shotshell and

Centerfire ammunition and ammunition components. Centerfire ammunition is defined as 5.56mm to .50 caliber.

c)Evidence of the adequacy and availability of facilities, equipment and suppliers/sub-contractors necessary to perform component non-destructive and destructive testing, including ballistic testing, of Rimfire, Pistol, Shotshell and Centerfire ammunition. Centerfire ammunition is defined as 5.56mm to .50 caliber. As a minimum, ballistic testing shall include pressure, velocity, dispersion (200m) and function & casualty.

d) Evidence of the adequacy and availability of facilities, equipment and suppliers/sub-contractors necessary to perform ballistic testing, non-destructive testing, interior and exterior aero-ballistic testing and evaluation of small caliber projectiles.

e) Evidence of the adequacy and availability of facilities, equipment, controls and licenses required to handle, store, transport, design, develop, manufacture, assemble and test items and assemblies containing energetic materials (e.g., explosives, pyrotechnics and

5 13

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

propellants). NOTE: This shall include the containers of raw energetics as well as the items and assemblies that contain them.

f) Evidence of the adequacy and availability of facilities, equipment and suppliers/sub-contractors necessary to perform small caliber engineering support to include finite element stress analysis, interior ballistics analysis, tolerance studies, material evaluation, computer analysis, strength of design, aero-ballistic studies reviews, fault tree, cost analysis, root cause analysis, risk analysis and shock and vibration analysis.

L.4.1.3 Subfactor 3 Personnel

As stated in Paragraph C.2.3 Resumes (or relative professional experience) of Offerors proposed personnel shall be provided to further support the Offerors proposal in regard to its personnel work experience and qualifications as they pertain to the level of the Offerors overall technical knowledge and capability to perform the stated requirements of this effort. Offerors shall define and discuss their personnel proposed for Small Caliber efforts, describing in detail their capabilities for conducting and supporting all contract tasks, based on the requirements listed below:

a) Availability and qualifications of personnel necessary to perform ammunition and ammunition component design and development work who have experience in Rimfire, Pistol, Shotshell and Centerfire ammunition. Centerfire ammunition is defined as 5.56mm to .50 caliber.

b) Availability and qualifications of personnel necessary to fabricate and inspect small developmental and production quantities (up to

5M cartridges per year for each caliber of cartridges) of ammunition and ammunition components who have experience in Rimfire, Pistol, Shotshell and Centerfire ammunition. Centerfire ammunition is defined as 5.56mm to .50 caliber.

c) Availability and qualifications of personnel necessary to perform ammunition component non-destructive and destructive testing, including ballistic testing, of Rimfire, Pistol, Shotshell and Centerfire ammunition. Centerfire ammunition is defined as 5.56mm to .50 caliber. As a minimum, ballistic testing shall include pressure, velocity, dispersion (200m) and function & casualty.

d) Availability and qualifications of personnel who have experience in small caliber ballistic testing, non-destructive testing and interior and exterior aero-ballistic testing and evaluation of small caliber projectiles.

e) Availability and qualifications of personnel trained and experienced in the handling, storage, transport, design, development, manufacturing, assembly and testing of items and assemblies containing energetic materials (e.g., explosives, pyrotechnics and propellants). NOTE: This shall include the containers of raw energetics as well as the items and assemblies that contain them.

f) Availability and qualifications of personnel trained and experienced to perform small caliber engineering support to include finite element stress analysis, interior ballistics analysis, tolerance studies, material evaluation, computer analysis, strength of design, aero-ballistic studies reviews, fault tree, cost analysis, root cause analysis, risk analysis and shock and vibration analysis.

L.4.2 VOLUME II FACTOR II: COST/PRICE

L.4.2.1 Offerors shall not propose pricing on the CLINs in Section B. These contract line items are established to enable to placement of future orders.

L.4.2.2 FFP Requirements. Offerors shall complete Attachment 0007, including FFP Labor, FFP Material and FFP Travel/ODCs. Fully loaded

FFP labor rates, FFP indirect rates and Profit, if proposed, will be incorporated into any resultant contract.

L.4.2.2.1 FFP Labor: Offerors shall submit only one fully loaded labor rate for each labor category for each ordering period in

Attachment 0007. The fully loaded labor rates shall be inclusive of direct labor, indirect costs and profit. Offerors shall propose a fully loaded labor rate for all labor categories and ordering periods. An Offerors fully loaded labor rates will be incorporated into any contract that is awarded as a result of this solicitation. Offerors will have the opportunity to propose lower fully loaded FFP labor rates for orders, but may not exceed what is incorporated in the basic contract. The Offeror shall not deviate from the labor categories and government-provided hours listed by labor category and ordering period in Attachment 0007. These government-provided hours are estimated and are used for evaluation purposes only.

L.4.2.2.2 FFP Material: Offerors may propose adders (e.g., indirect rates, profit) applicable to material which shall be detailed in

Attachment 0007.

L.4.2.2.3 FFP Travel/ODCs: Offerors may propose adders (e.g., indirect rates, profit) applicable to Travel/ODCs which shall be detailed in Attachment 0007.

L.4.2.3 CPFF Requirements. Offerors shall complete Attachment 0008, including CPFF Labor, CPFF Material and CPFF Travel/ODCs.

L.4.2.3.1 CPFF Labor.

L.4.2.3.1.1 Offerors shall submit a minimum of one fully loaded labor rate per labor category, whether it is by the prime contractor, subcontractor, interdivisional transfers and affiliates under common control (hereafter referred to as subcontractors) for each of the

6 13

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

five ordering periods, in Attachment 0008. Offerors shall submit separate rates for effort performed by the prime contractor and subcontractors for each labor category. The fully loaded labor rates shall be inclusive of wages, applicable indirect costs and fee.

Offerors shall not propose rates where no hours have been proposed/allocated as they will not be incorporated into any contract that may be awarded as a result of this solicitation. The prime contractor cannot utilize their fully loaded labor rates for their subcontractors. The fully loaded labor rates will be incorporated into any contract that may be awarded as a result of this solicitation.

L.4.2.3.1.2 Offerors may not deviate from the labor categories and hours listed by labor category and ordering period in Attachment

0008 located in Section J of the RFP. The Government-provided estimated labor hours are used for evaluation purposes only. The number of

Government estimated labor hours per labor category in Attachment 0008 shall be allocated among the Offeror and subcontractor(s), under common control. The total proposed hours per labor category shall be equal to the total Government estimated hours listed for each labor category for each ordering period. Offerors shall not change the total Government estimated labor hours per labor category listed.

L.4.2.3.1.3 The Offeror, as well as any subcontractor with a total proposed effort for all ordering periods of $750,000 or more as allocated by the prime contractor must provide a breakdown of the cost elements for each proposed fully loaded CPFF labor rate and the supporting documentation detailed below. The prime contractor shall submit a quotation from all subcontractors regardless of dollar value which includes the subcontractors proposed fully loaded labor rates in order to verify the subcontractors proposed rates. The

Offeror must provide a matrix of all subcontracts including their name, address, contract type and total proposed value.

L.4.2.3.1.4 Fully Loaded Labor Rate Schedules: The Offeror and each subcontractor estimated at $750,000 and above shall provide a schedule in Microsoft Excel with formulas intact and functioning which details the proposed hourly wages, applicable indirect rates and costs, fee percentage and fee dollar for each fully loaded CPFF labor rate. For subcontracted labor, the Offeror shall provide a breakout which shows the subcontractors labor rates broken out by element of cost and application of any adders proposed by the prime contractor broken out by element of cost. If the Offerors/subcontractor(s) rates are blended, weighted or composite rates, the

Offeror/subcontractor(s) shall provide a detailed schedule and breakout by element of cost which demonstrates how the blended, weighted or composite rates are calculated.

L.4.2.3.1.5 Direct Labor Rates: The Offeror/subcontractor(s) shall provide the basis of the proposed direct labor rates and documentation supporting their proposed direct labor rates, such as current payroll records from the actual payroll system, copies of their current DCAA Forward Pricing Rate Agreement or current (within the last twelve months) DCAA Forward Pricing Rate Proposal submission, salary survey, etc. If any of the proposed rates are based on a salary survey, the Offeror/subcontractor shall provide the complete salary survey data used to formulate the proposed rates, a detailed explanation and calculations in Microsoft Excel with formulas intact and functioning detailing how the proposed rates were calculated from the salary survey, and rationale for the percentile used in the salary survey. The source and rationale for proposed escalation factors shall be identified and supporting documentation shall be provided for the proposed escalation. If the offeror/subcontractors labor categories differ from those contained in the solicitation, the offeror/subcontractor shall provide a matrix which cross-walks their labor categories to the Governments and shall provide their labor category descriptions, including years of experience and education level.

L.4.2.3.1.6 Indirect Rates: The Offeror/subcontractor(s) shall identify the basis for their proposed indirect rates. For the current year indirect rates, the Offeror/subcontractor(s) shall provide copies of their current DCAA Forward Pricing Rate Agreement or current

(within the last twelve months) DCAA Forward Pricing Rate Proposal submission, and/or Provisional Billing Rates approval letter for the current year. For current-year or out-year indirect rates based on budgetary data or if none of the listed DCAA/DCMA documents are available, the Offeror/subcontractor(s) shall provide a detailed breakout of their indirect rates showing pool of expenses and allocation base with associated dollars used in formulation of the rates. Following is a simplistic sample for overhead:

| Contractor's FY16 Overhead | |

| Description | |

| Overhead Expenses | |

| Indirect Payroll | $45,320 |

| Payroll Taxes | $35,950 |

| Vacation | $4,520 |

| Holiday | $1,388 |

| Sick Leave | $2,150 |

| Entertainment | $5,350 |

| Office Equipment | $6,300 |

| Depreciation | $1,302 |

| Total Pool | $102,280 |

| Less Unallowable Costs | |

| Entertainment | $5,350 |

| Net Allowable Expenses $96,930 | |

| Allocation Base | |

| Direct Labor | $245,000 |

7 13

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

| Rate | 39.56% |

Offerors shall provide their actual indirect rates for their last two completed financial years.

L.4.2.3.1.7 If a subcontractor will not provide a detailed breakout of their proprietary cost data (i.e. rates, etc.) to the prime contractor, the primes proposal shall include fully loaded hourly labor rates for the subcontractor which correlates to the detailed proposed rates provided by the subcontractor directly to the Government. As a prime contractor submitting a proposal, also provide the following subcontractor information: point of contact, (name, mailing address, phone number, fax number, e-mail address). Instruct the subcontractor that their detailed proposal must be submitted to the Procuring Contracting Officer (PCO) by the proposal due date and time. The subcontractors proposal, submitted directly to the Government, shall also reference the prime contractor they are working with. The same level of detail required for the Offerors proposal shall be submitted for all subcontracts over $750,000. An explanation shall be provided by the Offeror if the Offeror proposed a different amount than that quoted by the subcontractor, including a detailed breakout of any prime markups.

L.4.2.3.1.8 If the Offeror does not provide supporting rate detail and/or escalation data required by the solicitation, the probable cost computed for the Offeror/subcontractors will be derived utilizing the higher of the proposed rates and readily available rate data for the same or similar labor categories and escalation rates from sources the Government deems appropriate.

L.4.2.3.2 CPFF Material. Material will be reimbursed on a cost, no fee basis and will be negotiated at the Task Order level. Offerors shall propose their indirect rates applicable to Material under Attachment 0008. See paragraph L.4.2.3.1.6 for indirect rate submission requirements.

L.4.2.3.3 CPFF Travel/ODCs. Travel/ODCs will be reimbursed on a cost, no fee basis and will be negotiated at the Task Order level.

Offerors shall propose their indirect rates applicable to Travel/ODCs under Attachment 0008. See paragraph L.4.2.3.1.6 for indirect rate submission requirements.

L.4.2.3.4 Fully Loaded CPFF Labor Rates and CR indirect rates applicable to Material and Travel/ODCs will be incorporated into any resultant contract. Refer to Section H for Information Regarding Updating Rates for Ordering Periods 2, 3, 4 and 5 .

L.4.2.3.5 FAR 52.215-22 Limitation on Pass-Through Charges-Identification of Subcontract Effort and FAR 52.215-23 are applicable. The offeror shall, as required, identify the information set forth in paragraph (c) of FAR 52.215-22.

L.4.2.4 Accounting System: Since this acquisition includes cost-reimbursable effort, pursuant to FAR 16.301-3(a)(3), the contractors accounting system must be deemed adequate for determining costs applicable to the contract/orders. Provide documentation from DCAA supporting the determination that the offerors accounting system has been deemed adequate. An offeror will not be awarded CPFF Task

Orders until such time as their accounting system has been deemed adequate by DCAA.

L.4.2.5 As a result of market research, it is expected that, after the solicitation is issued, there will be more than adequate competition that will result in more than one basic contract. Assuming multiple awards, task orders shall be competed among Offerors awarded a contract. Offerors shall propose labor categories in accordance with the resultant contract. The Offeror shall propose FFP rates for task orders at or below the rates contained in their contract. Contractors will have the opportunity to propose lower fully loaded FFP labor rates for competitive orders but may not exceed what is incorporated in Section B of the basic contract.

L.4.2.6 For a detailed description of the labor categories, see Section B of the solicitation which contains labor category definitions.

L.4.2.7 Hours, Material, Travel/ODCs, and Use of Government Property (if applicable) shall be negotiated on a task order by task order basis. Task Orders will be issued in accordance with the procedures for future task orders as stated in Section H of the solicitation.

L.4.2.8 Unbalanced Pricing - If the Offerors prices appear unbalanced when comparing labor rates from ordering period to ordering period, the Offeror shall provide documentation, including calculations and supporting rationale, explaining the apparent unbalanced pricing.

L.4.2.9 CDRLs - The CDRLs shall be not separately priced (NSP), but the Offeror is required to complete blocks 17 and 18 on each DD 1423 form. The DD 1423 forms shall be included in the proposal submission.

L.4.2.10 Each Ordering Period Year of the contract shall be from the date of award until one year later. For example, with an estimated award date of 14 November 2016, the ordering periods would be as follows:

Ordering Period 1: 14 November 2016 to 13 November 2017

Ordering Period 2: 14 November 2017 to 13 November 2018

Ordering Period 3: 14 November 2018 to 13 November 2019

Ordering Period 4: 14 November 2019 to 13 November 2020

Ordering Period 5: 14 November 2020 to 13 November 2021

8 13

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

L.4.2.11 Any HUBZone Small Business Concern shall provide proof of HUBZone certification with its proposal submission.

L.4.3 VOLUME III FACTOR 3 PAST PERFORMANCE

L.4.3.1 Offerors shall identify pertinent past history, which indicates that similar efforts of equal or greater complexity have been performed using the Offerors existing plant capability and demonstrate satisfaction of customer requirements.

L.4.3.2 Offerors shall submit a list of all recent Government contracts (prime and major subcontracts) in performance or awarded to the

Offeror and any of its major subcontractors within the past three (3) years, or awarded earlier than three (3) years ago, but for which deliveries/performance occurred or were scheduled to occur within the past three (3) years, which are relevant to the efforts required by the solicitation. Data concerning the prime Offeror shall be provided first, followed by each proposed major subcontractor, in alphabetical order. Offerors are reminded that both independent data and data provided by the Offerors in their proposals may be used to evaluate the Offerors past performance. The Government plans to rely on existing documentation from Federal databases to the maximum extent practicable. Sources of existing information available to the Government include, but are not limited to, Past Performance

Information and Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), and Electronic

Subcontract Reporting System (eSRS). The Government may use past performance information obtained from sources other than those identified by the Offeror. The Government reserves the right to use or not use past performance information submitted by the Offeror based on whether or not adequate recorded past performance information is available in its Federal databases. Since the Government may not necessarily interview any or all of the sources provided by the Offerors, it is incumbent upon the Offeror to explain the relevance of the data provided. The burden of providing thorough and complete past performance information remains with the Offerors. Proposals that do not contain the information requested by this paragraph may result in rejection or receipt of a high performance risk evaluation by the Government. This volume shall be organized into the following sections:

(1) Section 1 Contract Descriptions. This section shall include the following information in the following format:

(a) Contractor/Subcontractor place of performance, CAGE Code and DUNS Number. If the work was performed as a subcontractor, also provide the name of the prime contractor and Point of Contact (POC) within the prime contractor organization (name, and current address, e-mail address, and telephone and fax numbers).

PLEASE NOTE: While an Offeror may submit past performance information on relevant efforts where they performed as a major subcontractor, the Government does not have privity with subcontracts and therefore, may not be able to obtain qualitative information.

(b) Government contracting activity, and current address, Procuring Contracting Officer's name, e-mail address, telephone and fax numbers.

(c) Governments technical representative/COR, and current e-mail address, telephone and fax numbers.

(d) Government contract administration activity and the Administrative Contracting Officer's name, and current e-mail address, telephone and fax numbers.

(e) Government contract administration activity's Pre-Award Monitor's name and current e-mail address, telephone and fax numbers.

(f) Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements, also include

Delivery Order Numbers.

(g) Contract Type (specific type such as Fixed Price (FP), Cost Reimbursement (CR), Time & Materials (T&M), etc.) In the case of

Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc)).

(h) Awarded price/cost.

(i) Final or projected final price/cost.

(j) Original delivery schedule, including dates of start and completion of work.

(k) Final or projected final, delivery schedule, including dates of start and completion of work.

(2) Section 2 - Performance. Offerors shall provide a specific narrative explanation of each contract listed in Section 1 describing the objectives achieved and detailing how the effort is relevant to the requirements of the solicitation.

(a) For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The Offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. All Requests for Deviation and Requests for

Waiver shall be addressed with respect to causes and corrective actions. The Offerors shall also provide a copy of any Cure Notices or

Show Cause Letters received on each contract listed and a description of any corrective action implemented by the Offeror or proposed

9 13

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

subcontractor. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

(b) For all contracts, the Offeror shall provide data on all manufacturing warranty returns. Data shall delineate total number of warranty returns, number of Could Not Duplicate (CND), number of failures attributable to GFE component failures, and number and nature of failures attributable to the Offerors delivered product.

(3) Section 3 Subcontracts. Offerors shall provide an outline of how the effort required by the solicitation will be assigned for performance within the Offerors corporate entity and among the proposed subcontractors. The information provided for the prime Offeror and each proposed major subcontractor must include the entire company name, company address, CAGE Code, DUNS Number and type of work to be performed by citing the applicable Government SOW subparagraph number. This includes all subcontractors who will be providing critical hardware/services or whose subcontract is for more than 25% of the total proposed price.

(4) Section 4 New Corporate Entities. New corporate entities may submit data on prior contracts involving its officers and employees.

However, in addition to the other requirements in this section, the Offeror shall discuss in detail the role performed by such persons in the prior contracts cited. Information should be included in the files described in the sections above.

(5) Past Performance Questionnaire. For all contracts identified in Section 1, Past Performance Questionnaires must be completed and submitted (Attachment 0001). The Offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the past/current contract. The POC's shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Officer within

30 calendar days of the release of the RFP, to (include Contracting Officers email address). The Offeror shall also e-mail to the

Contracting Officer a list of all the POCs who were sent a questionnaire. The Government must receive this list within 30 calendar days after release of the RFP. The POC List shall be submitted in Word for Windows Table Format to include the following fields: Solicitation

Number; Company Name; Contract Number; Government Agency; POC Last Name, First Name; POC Title; POC Telephone Number; POC E-Mail

Address; Date E-Mailed to POC (month/day).

(6) Offerors are cautioned that the Government may use data obtained from other sources. Since the Government may not necessarily interview all of the sources provided by the Offerors, it is incumbent upon the Offerors to explain the relevance of the data provided.

L.4.4 VOLUME IV FACTOR 4: SMALL BUSINESS PARTICIPATION

L.4.4.1 The Small Business Participation Factor Volume is comprised of a single chapter. Offerors are responsible for including sufficient detail to permit a complete evaluation. Any information provided as part of the Small Business Participation Factor Volume may be used to correlate the evaluation of the other proposal volumes.

L.4.4.2 This provision applies to every U.S. Offeror, regardless of size status or locations of working facilities or headquarters. For proposal preparation purposes, the Offeror's Small Business Participation proposals shall be consistent with any subcontracting references/identification contained elsewhere in any other Factor Volume. Percentages are calculated using proposed total contract price as the denominator and include first-tier subcontractors only. For the purpose of evaluating Small Business Participation, the total contract price is based on the total contract maximum which is $65,000,000. Offerors shall also explain their rationale as to why the percentage of SB participation being utilized for this effort is appropriate for their company. Offerors shall describe their approach and efforts undertaken to utilize small businesses (SB). SB targets will be incorporated into any resulting prime contract and contractors will be required to report SB participation.

L.4.4.3 All Offerors, including Offerors who are themselves U.S. small business concerns based on the NAICS code assigned to this requirement, are to identify the extent to which U.S. small business concerns will be utilized as first-tier subcontractors in the performance of this proposed contract. U.S. small business concerns are defined (1) in FAR 19.001 and (2) by the criteria and size standards in FAR 19.102 for the applicable NAICS code. U.S. small business concerns include Small Businesses (SBs), Small Disadvantaged

Businesses (SDBs), Woman-Owned Small Businesses (WOSBs), HUBZone Small Businesses (HUBZone SBs), Veteran-Owned Small Businesses (VOSBs), and Service Disabled Veteran-Owned Small Businesses (SDVOSBs).

L.4.4.4 If the Offeror (to include any U.S. small business concerns who are proposing as part of a joint venture or teaming arrangement) is itself a U.S. small business concern, the Offeror's own participation as a SB, SDB, WOSB, HUBZone SB, VOSB, or SDVOSB will also be considered small business participation for the purpose of this evaluation. In this event, the extent of the Offeror participation as a

U.S. small business concern shall be detailed in the same manner as subcontracts to first-tier U.S. small business concerns.

L.4.4.5 Small Business Amounts: All Offerors shall address anticipated U.S. small business concern participation and subcontracting based on the total contract dollars proposed by the Offeror.

L.4.4.6 The Offeror shall provide information for small business participation and subcontracting in a table format in accordance with the following example:

Small Business Participation Table (in Millions)

Business $ Cost All % of SB Cost

10 13

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Category________ Contracts_________ Participation_____________ Total SubK__________

Contract

Total Price $43.00

SB $10.34 24.00% $10.34 of $43.00

SDB $2.86 6.65% $2.86 of $43.00

SDB $2.36 5.50% $2.36 of $43.00

HBCU/MI $0.50 1.15% $0.50 of $43.00

WOSB $1.55 3.60% $1.55 of $43.00

HUBZone SB $1.08 2.50% $1.08 of $43.00

VOSB $1.55 3.60% $1.55 of $43.00

SDVOSB $1.46 3.40% $1.46 of $43.00

L.4.4.6.1 Guidance for filling in the above "Small Business Participation" Table:

(a) Include first-tier subcontractors only. Note that members of a joint venture may be considered the Offeror or the first tier subcontractors, depending on the legal form of the joint venture as defined in its agreement document.

(b) If the Offeror is a U.S. small business concern, detail the extent of the Offeror participation as a U.S. small business concern in the same manner as subcontracts to first tier U.S. small business concerns.

(c) Percentages should be rounded to the nearest tenth of a percent.

L.4.4.6.2 Additional Guidance for particular Business Categories:

(a) For "Contract Total Price": Include the Offeror's proposed Total Contract Price on this line.

(b) For SB: Include U.S. small business concerns from all categories (i.e. SB, SDB, WOSB, HUBZone SB, VOSB, SDVOSB and HBCU/MI) in the dollars and percentage on this line. The SDB, WOSB, HUBZone SB, VOSB and SDVOSB are subcategories of SB and the dollars in each of these may not add to match the total dollars in the SB line due to the following: In some cases the same dollars may be reported in more than one block (i.e., a $10,000 subcontract to a Woman-Owned Small Business that is also a Service-Disabled Veteran-Owned Small Business should be entered on four rows: $10,000 under SB, $10,000 under WOSB, $10,000 under VOSB and $10,000 under SDVOSB). Be sure that the dollars are counted in the SB line only once and not four times (e.g. $40,000 representing the same firm participating at $10,000 in differing categories). Note that the SB percentage is not simply a total of the percentages of each SB subcategory and must be calculated separately as shown in the chart.

(c) For HUBZone SB: Include only "SBA certified" HubZone SBs.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .