About this file
This project table of contents outlines specifications for a combined squad operations facility to be constructed at Hurlburt Field, Florida. Key details include constructing a two-story 39,500 square foot facility with reinforced concrete foundation and floor slab, steel structure, masonry walls, and metal roof. Functional spaces comprise SCIF classrooms, industrial workspace, and supporting utilities. The project also includes site improvements, communications infrastructure, fire detection and protection systems, and a mass notification system. Specifications cover divisions for sitework, concrete, masonry, metals, wood, thermal and moisture protection, doors and windows, finishes, equipment, furnishings, special construction, conveyances, and mechanical and electrical systems. The Army Corps of Engineers Mobile District is the contracting agency for this total small business set-aside project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AM03.pdf | ||
| AM03 DRAWINGS.pdf | ||
| AM02 DRAWINGS.pdf | ||
| AM02.pdf | ||
| W9127820R0062 Minutes-Pre-Bid site visit.pdf | ||
| W9127820R0062 AM01 DRAWINGS.pdf | ||
| VOL1.PDF | ||
| VOL2.PDF | ||
| VOL4.PDF | ||
| RTA DRAWINGS.pdf | ||
| EM 385-1-1.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THIS IS A TOTAL SMALL BUSINESS (SB) SET-ASIDE
VOLUME 3 OF 4
SOLICITATION NO: W9127820R0062
CADD NO: MEF20005
SPECIFICATIONS
FOR
FTEV153010
SOF COMBINED SQUAD OPERATIONS FACILITY
HURLBURT FIELD, FLORIDA
(OKALOOSA COUNTY)
“GOOD ENGINEERING RESULTS IN A BETTER ENVIRONMENT”
U.S. ARMY ENGINEER DISTRICT, MOBILE
109 St. Joseph St
Mobile, Alabama 36602
FTEV153010 SOF COMBINED SQUAD OPERATIONS FACILITY W9127820R0062
HURLBURT FIELD, FLORIDA MEF20005
TOC - 1
TABLE OF CONTENTS
VOLUME 1 OF 4
CHECKLIST FOR PREPARATION OF OFFERS
BIDDING REQUIREMENTS
STANDARD FORM 1442 - SOLICITATION, OFFER, AND AWARD
BIDDING SCHEDULE
EXPLANATION OF BID ITEMS
STANDARD FORM 24 - BID BOND
STANDARD FORM 28 - AFFIDAVIT OF INDIVIDUAL SURETY
STANDARD FORM LLL - DISCLOSURE OF LOBBYING ACTIVITIES
00 11 00 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
00 12 00 EVALUATION CRITERIA AND BASIS OF AWARD
00 21 16 INSTRUCTIONS TO PROPOSERS
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 70 00 CONDITIONS OF THE CONTRACT
SPECIFICATIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 ADDITIONAL SPECIAL CONTRACT REQUIREMENTS
EP310-1-6a PROJECT SIGNS
DD FORM 1354
DD FORM 1354 CHECKLIST
WAGE RATES
01 00 01 GENERAL CONTRACT REQUIREMENTS
CESAM FORM 1151
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
SUBMITTAL REGISTER
FORM 4025
01 33 29 SUSTAINABILITY REPORTING
AIR FORCE SUSTAINABILITY REQUIREMENTS SCORESHEET
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
SAM FORM 696
01 45 35 SPECIAL INSPECTIONS
STATEMENT OF SPECIAL INSPECTIONS
SCHEDULE OF SPECIAL INSPECTIONS
01 54 00 GREEN PROCUREMENT
AFFIRMATIVE PROCUREMENT REPORTING FORM
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS – HURLBURT STANDARD
01 57 20.00 10 ENVIRONMENTAL PROTECTION - HURLBURT STANDARD
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 10 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 56 13 WASTE CONTAINMENT GEOMEMBRANE
TOC - 2
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 52 00 METAL RAILINGS
VOLUME 2 OF 4
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 70 FLEXIBLE HORIZONTAL LIFELINE SYSTEMS ON ROOFTOP ENERGY
ABSORBING ANCHOR POSTS
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 23 OVERHEAD COILING DOORS
08 34 59 VAULT DOORS AND DAY GATES
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 71 00 DOOR HARDWARE
HARDWARE SETS
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
TOC - 3
DIVISION 09 – FINISHES (CONTINUED)
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23.13 RESINOUS FLOORING
09 68 00 CARPETING
09 69 13 RIGID GRID ACCESS FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 01 EXTERIOR SIGNAGE
10 14 02 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 50 00.13 10 FURNITURE, FIXTURES, AND EQUIPMENT
12 59 00 SYSTEMS FURNITURE
DIVISION 13 – SPECIAL CONSTRUCTION
13 12 20 EXTRUDED ALUMINUM CANOPY SYSTEM
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
VOLUME 3 OF 4
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
TOC - 4
DIVISION 26 - ELECTRICAL
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 35 43 400-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET
COMMUNICATION SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
VOLUME 4 OF 4
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 31 16.13 CHEMICAL TERMITE CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSES
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
APPENDICES
APPENDIX A GEOTECHNICAL BORING LOG INFORMATION
APPENDIX B ENVIRONMENTAL SITE CONTROLS, RESTRICTIONS AND PERMITS
APPENDIX C FURNITURE, FIXTURES AND EQUIPMENT DESIGN PACKAGE
APPENDIX D FLOW TEST INFORMATION
-- End of Project Table of Contents --
SECTION 21 13 13.00 10
WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
05/09
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF SANITARY ENGINEERING (ASSE)
ASSE 1015 (2011) Performance Requirements for Double Check Backflow Prevention Assemblies and Double Check Fire Protection Backflow Prevention Assemblies - (ANSI approved 2010)
AMERICAN WATER WORKS ASSOCIATION (AWWA)
AWWA C104/A21.4 (2016) Cement-Mortar Lining for Ductile-Iron Pipe and Fittings for Water
AWWA C110/A21.10 (2012) Ductile-Iron and Gray-Iron Fittings for Water
AWWA C111/A21.11 (2017) Rubber-Gasket Joints for Ductile-Iron Pressure Pipe and Fittings
AWWA C151/A21.51 (2017) Ductile-Iron Pipe, Centrifugally Cast
AWWA C203 (2008) Coal-Tar Protective Coatings and Linings for Steel Water Pipelines - Enamel and Tape - Hot-Applied
ASME INTERNATIONAL (ASME)
ASME B16.1 (2015) Gray Iron Threaded Fittings;
Classes 25, 125 and 250
ASME B16.11 (2016) Forged Fittings, Socket-Welding and Threaded
ASME B16.21 (2016) Nonmetallic Flat Gaskets for Pipe Flanges
ASME B16.3 (2016) Malleable Iron Threaded Fittings, Classes 150 and 300
ASME B16.4 (2011) Standard for Gray Iron Threaded Fittings; Classes 125 and 250
SECTION 21 13 13.00 10 Page 1
ASME B16.9 (2018) Factory-Made Wrought Buttwelding Fittings
ASME B18.2.2 (2015) Nuts for General Applications:
Machine Screw Nuts, Hex, Square, Hex Flange, and Coupling Nuts (Inch Series)
ASTM INTERNATIONAL (ASTM)
ASTM A 183 (2014) Standard Specification for Carbon Steel Track Bolts and Nuts
ASTM A 449 (2014) Standard Specification for Hex Cap Screws, Bolts, and Studs, Steel, Heat Treated, 120/105/90 ksi Minimum Tensile Strength, General Use
ASTM A 536 (1984; R 2014) Standard Specification for Ductile Iron Castings
ASTM F 436 (2011) Hardened Steel Washers
FM GLOBAL (FM)
FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-71 (2011; Errata 2013) Gray Iron Swing Check Valves, Flanged and Threaded Ends
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 101 (2018; TIA 18-1; TIA 18-2; TIA 18-3) Life Safety Code
NFPA 13 (2019) Standard for the Installation of Sprinkler Systems
NFPA 1963 (2014) Standard for Fire Hose Connections
NFPA 24 (2016; ERTA 2016) Standard for the Installation of Private Fire Service Mains and Their Appurtenances
UNDERWRITERS LABORATORIES (UL)
UL 668 (2004; R 2012) Hose Valves for Fire-Protection Service
UL Bld Mat Dir (updated continuously online) Building Materials Directory
UL Product Spec (updated online) UL Product Spec http://productspec.ul.com/index.php
SECTION 21 13 13.00 10 Page 2
US DEPARTMENT OF DEFENSE (DOD)
UFC 3-600-01 (2016; with Change 1) Fire Protection Engineering for Facilities
1.2 SYSTEM DESCRIPTION
Furnish piping offsets, fittings, and any other accessories as required to provide a complete installation and to eliminate interference with other construction. Install sprinkler system over and under ducts, piping and platforms when such equipment can negatively effect or disrupt the sprinkler discharge pattern and coverage. Provide wet pipe sprinkler system in all areas of the building. Except as modified herein, the system shall be designed and installed in accordance with NFPA 13 and UFC 3-600-01 .
Pipe sizes which are not indicated on drawings shall be determined by hydraulic calculation. Design any portions of the sprinkler system that are not indicated on the drawings including locating sprinklers, piping and equipment, and size piping and equipment when this information is not indicated on the drawings or is not specified herein. The design of the sprinkler system shall be based on hydraulic calculations, and the other provisions specified herein.
1.2.1 Hydraulic Design
Hydraulically design the system to discharge a minimum density as indicated on the drawings. The minimum pipe size for branch lines in gridded systems shall be 1 1/4-inch. Hydraulic calculations shall be in accordance with the Area/Density Method of NFPA 13 .
1.2.1.1 Hose Demand
Add an allowance for exterior hose streams of 250 gallons per minute to the sprinkler system demand at the fire hydrant closest to the facility.
1.2.1.2 Basis for Calculations
The design of the sprinkler system for the Hurlburt SOF Combined Squad Ops Building shall be based upon a water supply test conducted on January 30, 2019 at 12:45 pm by Fisher Engineering resulting in a static pressure of 57 psi, reduced to 56 psi while flowing 1,150 gpm. Water supply shall be presumed available at the point of connection to existing water distribution system. The contractor shall perform a fire hydrant flow test to verify adequate flow and pressure is available prior to design of the system. Hydraulic calculations shall be based upon the Hazen-Williams formula with a "C" value of 120 for steel piping, 140 for new cement-lined ductile-iron piping, and 100 for existing underground piping.
1.2.1.3 Hydraulic Calculations
Prepare hydraulic calculations as outlined in NFPA 13 , except that calculations shall be performed by computer using software intended specifically for fire protection system design using the design data shown on the drawings. Software that uses k-factors for typical branch lines is not acceptable. Calculations shall be based on the water supply data shown on the drawings to substantiate that the design area used in the calculations is the most demanding hydraulically. Water supply curves and system requirements shall be plotted on semi-logarithmic graph paper so as to present a summary of the complete hydraulic calculation. Provide a summary sheet listing sprinklers in the design area and their respective
SECTION 21 13 13.00 10 Page 3 hydraulic reference points, elevations, actual discharge pressures and actual flows. Elevations of hydraulic reference points (nodes) shall be indicated. Documentation shall identify each pipe individually and the nodes connected thereto. Indicate the diameter, length, flow, velocity, friction loss, number and type fittings, total friction loss in the pipe, equivalent pipe length and Hazen-Williams coefficient for each pipe. The hydraulic calculations shall include a 8 pound per inch loss through the backflow prevention device. For gridded systems, calculations shall show peaking of demand area friction loss to verify that the hydraulically most demanding area is being used. Also for gridded systems, a flow diagram indicating the quantity and direction of flows shall be included. A drawing showing hydraulic reference points (nodes) and pipe designations used in the calculations shall be included.
1.2.2 Sprinkler Coverage
Sprinklers shall be uniformly spaced on branch lines. In buildings protected by automatic sprinklers, sprinklers shall provide coverage throughout 100 percent of the building. This includes, but is not limited to, telephone rooms, electrical equipment rooms, boiler rooms, switchgear rooms, transformer rooms, and other electrical and mechanical spaces.
Coverage per sprinkler shall be in accordance with NFPA 13 , but shall not exceed 130 square feet for ordinary hazard occupancies and 225 square feet for light hazard occupancies. Exceptions are as follows:
a. Sprinklers may be omitted from small rooms which are exempted for specific occupancies in accordance with NFPA 101 .
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Shop Drawings; G
Six copies of the Sprinkler System Shop Drawings, no later than 21 days prior to the start of sprinkler system installation.
As-Built Drawings
As-built shop drawings, at least 14 days after completion of the Final Tests, updated to reflect as-built conditions after all related work is completed.
SD-03 Product Data
Fire Protection Related Submittals
A list of the Fire Protection Related Submittals, no later than 7 days after the approval of the Fire Protection Specialist.
Materials and Equipment; G
Manufacturer's catalog data included with the Sprinkler System Drawings for all items specified herein. The data shall be
SECTION 21 13 13.00 10 Page 4 highlighted to show model, size, options, etc., that are intended for consideration. Data shall be adequate to demonstrate compliance with all contract requirements. In addition, provide a complete equipment list that includes equipment description, model number and quantity.
Spare Parts
Spare parts data for each different item of material and equipment specified.
Preliminary Tests; G
Proposed procedures for Preliminary Tests, no later than 14 days prior to the proposed start of the tests. Proposed date and time to begin the preliminary tests.
Final Acceptance Test; G
Proposed procedures for Final Acceptance Test, no later than 14 days prior to the proposed start of the tests. Proposed date and time to begin Final Acceptance Test, submitted with the Final Acceptance Test Procedures. Notification shall be provided at least 14 days prior to the proposed start of the test.
Notification shall include a copy of the Contractor's Material & Test Certificates.
Onsite Training; G
Proposed Onsite Training schedule, at least 14 days prior to the start of related training.
Fire Protection Specialist; G
The name and documentation of certification of the proposed Fire Protection Specialists, no later than 14 days after the Notice to Proceed and prior to the submittal of the sprinkler system drawings and hydraulic calculations.
Sprinkler System Installer; G
The name and documentation of certification of the proposed Sprinkler System Installer, concurrent with submittal of the Fire Protection Specialist Qualifications.
SD-05 Design Data Sway Bracing; G
Load calculations for sizing of sway bracing, for systems that are required to be protected against damage from earthquakes.
Hydraulic Calculations; G
Hydraulic calculations, including a drawing showing hydraulic reference points and pipe segments.
SD-06 Test Reports
Preliminary Test Report; G
SECTION 21 13 13.00 10 Page 5
Six copies of the completed Preliminary Test Report, no later than 7 days after the completion of the Preliminary Tests. The Preliminary Tests Report shall include both the Contractor's Material and Test Certificate for Underground Piping and the Contractor's Material and Test Certificate for Aboveground Piping. All items in the Preliminary Tests Report shall be signed by the Fire Protection Installer.
Final Acceptance Test Report; G
Six copies of the completed Final Acceptance Tests Reports, no later than 7 days after the completion of the Final Acceptance Tests. All items in the Final Acceptance Report shall be signed by the Fire Protection Installer.
SD-07 Certificates
Inspection by Fire Protection Specialist; G
SD-10 Operation and Maintenance Data
Operating and Maintenance Instructions
Six manuals listing step-by-step procedures required for system startup, operation, shutdown, and routine maintenance, at least 14 days prior to field training. The manuals shall include the manufacturer's name, model number, parts list, list of parts and tools that should be kept in stock by the owner for routine maintenance including the name of a local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recommended service organization (including address and telephone number) for each item of equipment. Each service organization submitted shall be capable of providing 4-hour on-site response to a service call on an emergency basis.
1.4 QUALITY ASSURANCE
Compliance with referenced NFPA standards is mandatory. This includes advisory provisions listed in the appendices of such standards, as though the word "shall" had been substituted for the word "should" wherever it appears. In the event of a conflict between specific provisions of this specification and applicable NFPA standards, this specification shall govern. Reference to "authority having jurisdiction" shall be interpreted to mean the Contracting Officer.
1.4.1 Fire Protection Specialist
Perform work specified in this section under the supervision of and certified by the Fire Protection Specialist, also referred to as the Qualified Fire Protection Engineer (QFPE),who is an individual that is a registered professional engineer who has passed the fire protection engineering written examination administered by the National Council of Examiners for Engineering and Surveys (NCEES) and has relevant fire protection engineering experience. The Fire Protection Specialist shall prepare a list of the fire protection related submittals from the Contract Submittal Register that relate to the successful installation of the sprinkler systems(s). The submittals identified on this list shall be accompanied by a letter of approval signed and dated by the Fire Protection Specialist when submitted to the Government. The Fire Protection
SECTION 21 13 13.00 10 Page 6
Specialist shall be regularly engaged in the design and installation of the type and complexity of system specified in the contract documents, and shall have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.
1.4.2 Sprinkler System Installer
Work specified in this section shall be performed by the Sprinkler System Installer who is regularly engaged in the installation of the type and complexity of system specified in the contract documents, and shall have served in a similar capacity for at least three systems that have performed in the manner intended for a period of not less than 6 months.
1.4.3 Shop Drawings
Shop Drawings shall conform to the requirements established for working plans as prescribed in NFPA 13 . Drawings shall include plan and elevation views demonstrating that the equipment will fit the allotted spaces with clearance for installation and maintenance. Each set of drawings shall include the following:
a. Descriptive index of drawings in the submittal with drawings listed in sequence by drawing number. A legend identifying device symbols, nomenclature, and conventions used.
b. Floor plans drawn to a scale not less than 1/8" = 1'-0" which clearly show locations of sprinklers, risers, pipe hangers, seismic separation assemblies, sway bracing, inspector's test connections, drains, and other applicable details necessary to clearly describe the proposed arrangement. Each type of fitting used and the locations of bushings, reducing couplings, and welded joints shall be indicated.
c. Actual center-to-center dimensions between sprinklers on branch lines and between branch lines; from end sprinklers to adjacent walls; from walls to branch lines; from sprinkler feed mains, cross mains and branch lines to finished floor and roof or ceiling. A detail shall show the dimension from the sprinkler and sprinkler deflector to the ceiling in finished areas.
d. Longitudinal building sections showing typical branch line and cross main pipe routing.
e. Details of each type of riser assembly; pipe hanger; sway bracing for earthquake protection, and restraint of underground water main at point-of-entry into the building, and electrical devices and interconnecting wiring.
1.5 DELIVERY, STORAGE, AND HANDLING
All equipment delivered and placed in storage shall be housed in a manner to preclude any damage from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Additionally, all pipes shall either be capped or plugged until installed.
1.6 EXTRA MATERIALS
Submit spare parts data for each different item of material and equipment specified. The data shall include a complete list of parts and supplies, SECTION 21 13 13.00 10 Page 7 with current unit prices and source of supply, and a list of parts recommended by the manufacturer to be replaced after 1 year and 3 years of service. A list of special tools and test equipment required for maintenance and testing of the products supplied by the Contractor shall be included.
PART 2 PRODUCTS
2.1 STANDARD PRODUCTS
Provide materials and equipment which are standard products of a manufacturer regularly engaged in the manufacture of such products and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening.
2.2 NAMEPLATES
All equipment shall have a nameplate that identifies the manufacturer's name, address, type or style, model or serial number, and catalog number.
2.3 REQUIREMENTS FOR FIRE PROTECTION SERVICE
Provide Materials and Equipment that have been tested by Underwriters Laboratories, Inc. and are listed in UL Fire Prot Dir or approved by Factory Mutual and listed in FM APP GUIDE. Where the terms "listed" or "approved" appear in this specification, such shall mean listed in UL Fire Prot Dir or FM APP GUIDE.
2.4 UNDERGROUND PIPING COMPONENTS
2.4.1 Pipe
Piping from a point 6 inches above the floor to a point 5 feet outside the building wall shall be ductile-iron with a rated working pressure of 175 pounds per square inch conforming to AWWA C151/A21.51 , with cement mortar lining conforming to AWWA C104/A21.4 . Piping more than 5 feet outside the building walls shall comply with Section 33 11 00 WATER DISTRIBUTION. The use of Ames series IBR In-Building Riser Assembly, or an approved equal, shall be permitted.
2.4.2 Fittings and Gaskets
Fittings shall be ductile-iron conforming to AWWA C110/A21.10 . Gaskets shall be suitable in design and size for the pipe with which such gaskets are to be used. Gaskets for ductile-iron pipe joints shall conform to
AWWA C111/A21.11 .
2.4.3 Gate Valve and Indicator Posts
Gate valves for underground installation shall be of the inside screw type with counter-clockwise rotation to open. Where indicating type valves are shown or required, indicating valves shall be gate valves with an approved indicator post of a length to permit the top of the post to be located 3 feet above finished grade. Gate valves and indicator posts shall be listed in UL Fire Prot Dir or FM APP GUIDE.
2.5 ABOVEGROUND PIPING COMPONENTS
Aboveground piping shall be steel.
SECTION 21 13 13.00 10 Page 8
2.5.1 Steel Piping Components
2.5.1.1 Steel Pipe
Except as modified herein, steel pipe shall be black as permitted by NFPA 13 and shall conform to applicable provisions of ASTM A 795/A 795M , ASTM A 53/A 53M , or ASTM A 135/A 135M . All pipe shall be Schedule 40 and be UL-listed or FM-approved for fire protection use. The use of flexible sprinkler drops is prohibited. Pipe shall be marked with the name of the manufacturer, kind of pipe, and ASTM designation.
2.5.1.2 Fittings for Non-Grooved Steel Pipe
Fittings shall be cast iron conforming to ASME B16.4 , steel conforming to ASME B16.9 or ASME B16.11 , or malleable iron conforming to ASME B16.3 .
Fittings into which sprinklers, drop nipples or riser nipples (sprigs) are screwed shall be threaded type. Plain-end fittings with mechanical couplings, fittings that use steel gripping devices to bite into the pipe and segmented welded fittings shall not be used.
2.5.1.3 Grooved Mechanical Joints and Fittings
Joints and fittings shall be designed for not less than 175 pounds per square inch service and shall be the product of the same manufacturer;
segmented welded fittings shall not be used. Fitting and coupling houses shall be malleable iron conforming to ASTM A 47/A 47M , Grade 32510; ductile iron conforming to ASTM A 536 , Grade 65-45-12. Gasket shall be the flush type that fills the entire cavity between the fitting and the pipe. Nuts and bolts shall be heat-treated steel conforming to ASTM A 183 and shall be cadmium plated or zinc electroplated.
2.5.1.4 Flanges
Flanges shall conform to NFPA 13 and ASME B16.1 . Gaskets shall be non-asbestos compressed material in accordance with ASME B16.21 , 1/16 inch thick, and full face or self-centering flat ring type.
2.5.1.5 Bolts, Nut, and Washers
Bolts shall be conform to ASTM A 449 , Type 1 and shall extend no less than three full threads beyond the nut with bolts tightened to the required torque. Nuts shall be hexagon type conforming to ASME B18.2.2 . Washers shall meet the requirements of ASTM F 436 . Flat circular washers shall be provided under all bolt heads and nuts.
2.5.2 Pipe Hangers
Hangers shall be listed in UL Fire Prot Dir or FM APP GUIDE and of the type suitable for the application, construction, and pipe type and sized to be supported.
2.5.3 Valves
2.5.3.1 Control Valve and Gate Valve
Manually operated sprinkler control valve and gate valve shall be outside stem and yoke (OS&Y) type and shall be listed in UL Bld Mat Dir or FM APP GUIDE. Butterfly-type control valves shall not be used.
SECTION 21 13 13.00 10 Page 9
2.5.3.2 Check Valve
Check valve 2 inches and larger shall be listed in UL Bld Mat Dir or FM APP GUIDE. Check valves 4 inches and larger shall be of the swing type with flanged cast-iron body and flanged inspection plate, shall have a clear waterway and shall meet the requirements of MSS SP-71 , for Type 3 or 4.
2.5.3.3 Hose Valve
Valve shall comply with UL 668 and shall have a minimum rating of 300 pounds per square inch. Valve shall be non-rising stem, all bronze, 90 degree angle type, with 2 1/2-inch American National Standard Fire Hose Screw Thread (NH) male outlet in accordance with NFPA 1963 . Hose valves associated with the backflow prevention device test header shall not be provided with reducers. Hose valves shall be equipped with lugged cap with drip drain, cap gasket and chain. Valve finish shall be polished brass.
2.5.3.4 Automatic Air Relief Valve
An automatic air relief valve shall be installed at the high point of the automatic sprinkler system to exhaust any trapped air in the system during filling. Valve shall be piped directly to the exterior of the building.
2.6 WATERFLOW ALARM
Electrically operated, exterior-mounted, waterflow alarm bell shall be provided and installed in accordance with NFPA 13 . Waterflow alarm bell shall be rated 24 VDC and shall be connected to the Fire Alarm Control Panel(FACP) in accordance with Section 28 31 76 INTERIOR FIRE ALARM AND
MASS NOTIFICATION SYSTEM.
2.7 ALARM INITIATING AND SUPERVISORY DEVICES
2.7.1 Sprinkler Waterflow Indicator Switch, Vane-Type
Switch shall be vane-type with a pipe saddle and cast aluminum housing.
The electro-mechanical device shall include a flexible, low-density polyethylene paddle conforming to the inside diameter of the fire protection pipe. The device shall sense water movements and be capable of detecting a sustained flow of 10 gallons per minute or greater. The device shall contain a retard device adjustable from 0 to 90 seconds to reduce the possibility of false alarms caused by transient flow surges. The switch shall be tamper resistant and contain two SPDT (Form C) contacts arranged to transfer upon removal of the housing cover, and shall be equipped with a silicone rubber gasket to assure positive water seal and a dustproof cover and gasket to seal the mechanism from dirt and moisture.
2.7.2 Valve Supervisory (Tamper) Switch
Switch shall be suitable for mounting to the type of control valve to be supervised open. The switch shall be tamper resistant and contain one set of SPDT (Form C) contacts arranged to transfer upon removal of the housing cover or closure of the valve of more than two rotations of the valve stem.
2.8 FIRE DEPARTMENT CONNECTION
Fire department connection shall be projecting type with cast brass body, SECTION 21 13 13.00 10 Page 10 matching wall escutcheon lettered "Auto Spkr" with a polished brass finish. The connection shall have two inlets with individual self-closing clappers, caps with drip drains and chains. Female inlets shall have 2 1/2-inch diameter American National Fire Hose Connection Screw Threads (NH) per NFPA 1963 .
2.9 SPRINKLERS
Sprinklers with internal O-rings shall not be used. Sprinklers shall be used in accordance with their listed coverage limitations. Temperature classification shall be ordinary. Sprinklers in high heat areas including attic spaces or in close proximity to unit heaters shall have temperature classification in accordance with NFPA 13 . Extended coverage sprinklers shall not be used.
2.9.1 Concealed Sprinkler
Concealed sprinkler shall be white polyester, quick-response type and shall have a nominal 1/2-inch or 17/32-inch orifice.
2.9.2 Recessed Sprinkler
Recessed sprinkler shall be chrome-plated quick-response type and shall have a nominal 1/2-inch or 17/32 inch orifice.
2.9.3 Pendent Sprinkler
Pendent sprinkler shall be of the fusible strut or glass bulb type, quick-response type with nominal 1/2-inch or 17/32-inch orifice. Pendent sprinklers shall have a polished chrome finish.
2.9.4 Upright Sprinkler
Upright sprinkler shall be brass quick-response type and shall have a nominal 1/2-inch or 17/32-inch orifice.
2.9.5 Sidewall Sprinkler
Sidewall sprinkler shall have a nominal 1/2-inch orifice. Sidewall sprinkler shall have a polished chrome finish. Sidewall sprinkler shall be the quick-response type.
2.9.6 Dry Sidewall Sprinkler
Dry sidewall sprinklers shall be the dry pendent type, unless otherwise indicated. Dry sidewall sprinklers shall be of the fusible strut or glass bulb type, recessed type with nominal 1/2-inch orifice, and a polished chrome finish. Assembly shall include an integral escutcheon. Maximum length shall not exceed the maximum length indicated in UL Product Spec .
2.10 ACCESSORIES
2.10.1 Sprinkler Cabinet
Spare sprinklers shall be provided in accordance with NFPA 13 and shall be packed in a suitable metal or plastic cabinet. Spare sprinklers shall be representative of, and in proportion to, the number of each type and temperature rating of the sprinklers installed. At least one wrench of each type required shall be provided. A list of all sprinklers installed
SECTION 21 13 13.00 10 Page 11 on the property shall be posted in spare sprinkler cabinet in accordance with NFPA 13 .
2.10.2 Pendent Sprinkler Escutcheon
Escutcheon shall be two-piece, semi-recessed and suitable for installation on pendent sprinklers. The escutcheon shall have a factory finish that matches the pendent sprinkler heads.
2.10.3 Pipe Escutcheon
Escutcheon shall be polished chromium-plated zinc alloy, or polished chromium-plated copper alloy. Escutcheons shall be either one-piece or split-pattern, held in place by internal spring tension or set screw.
2.10.4 Sprinkler Guard
Guard shall be a listed steel wire cage designed to encase the sprinkler and protect it from mechanical damage. Guards shall be provided on sprinklers located within 7 feet of the floor or where subject to mechanical damage.
2.10.5 Identification Sign
Valve identification sign shall be minimum 6 inches wide by 2 inches high with enamel baked finish on minimum 18 gauge steel or 0.024-inch aluminum with red letters on a white background or white letters on red background.
Wording of sign shall include, but not be limited to "main drain", "auxiliary drain", "inspector's test", "alarm test", "alarm line", and similar wording as required to identify operational components.
2.11 DOUBLE-CHECK VALVE BACKFLOW PREVENTION ASSEMBLY
Double-check backflow prevention assembly shall comply with ASSE 1015 . The assembly shall have a bronze, cast-iron or stainless steel body with flanged ends. The assembly shall include pressure gauge test ports and OS&Y shutoff valves on the inlet and outlet, 2-positive-seating check valve for continuous pressure application, and four test cocks. Assemblies shall be rated for working pressure of 175 psi The maximum pressure loss shall be 6 psi at a flow rate equal to the sprinkler water demand, at the location of the assembly. A test port for a pressure gauge shall be provided both upstream and downstream of the double-check backflow prevention assembly valves.
PART 3 EXECUTION
3.1 FIELD MEASUREMENTS
After becoming familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.
3.2 INSTALLATION REQUIREMENTS
The installation shall be in accordance with the applicable provisions of NFPA 13 , NFPA 24 and publications referenced therein.
SECTION 21 13 13.00 10 Page 12
3.3 INSPECTION BY FIRE PROTECTION SPECIALIST
Prior to ceiling installation and concurrent with the Final Acceptance Test Report, certification by the Fire Protection Specialist that the sprinkler system is installed in accordance with the contract requirements, including signed approval of the Preliminary and Final Acceptance Test Reports. The Fire Protection Specialist shall: 1) inspect the sprinkler system periodically during the installation to assure that the sprinkler system is being provided and installed in accordance with the contract requirements,
2) witness the preliminary and final tests, 3) after completion of the system inspections and a successful final test, certify in writing that the system has been installed in accordance with the contract requirements.
Any discrepancy shall be brought to the attention of the Contracting Officer in writing, no later than three working days after the discrepancy is discovered.
3.4 ABOVEGROUND PIPING INSTALLATION
3.4.1 Protection of Piping Against Earthquake Damage
Seismically protect the system piping against damage from earthquakes.
This requirement is not subject to determination under NFPA 13 . Install the seismic protection of the system piping in accordance with UFC 3-310-04, NFPA 13 and Annex A. Include the required features identified therein that are applicable to the specific piping system.
3.4.2 Piping in Exposed Areas
Install exposed piping without diminishing exit access widths, corridors or equipment access. Exposed horizontal piping, including drain piping, shall be installed to provide maximum headroom.
3.4.3 Piping in Finished Areas
In areas with suspended or dropped ceilings and in areas with concealed spaces above the ceiling, piping shall be concealed above ceilings. Piping shall be inspected, tested and approved before being concealed. Risers and similar vertical runs of piping in finished areas shall be concealed.
3.4.4 Pendent Sprinklers
Drop nipples to pendent sprinklers shall consist of minimum 1-inch pipe with a reducing coupling into which the sprinkler shall be threaded.
Hangers shall be provided on armovers to drop nipples supplying pendent sprinklers when the armover exceeds 24 inches for steel pipe. Where sprinklers are installed below suspended or dropped ceilings, drop nipples shall be cut such that sprinkler ceiling plates or escutcheons are of a uniform depth throughout the finished space. The outlet of the reducing coupling shall not extend more than 1-inch below the underside of the ceiling. On pendent sprinklers installed below suspended or dropped ceilings, the distance from the sprinkler deflector to the underside of the ceiling shall not exceed 4 inches. Recessed pendent sprinklers shall be installed such that the distance from the sprinkler deflector to the underside of the ceiling shall not exceed the manufacturer's listed range and shall be of uniform depth throughout the finished area. Pendent sprinklers in suspended ceilings shall be a minimum of 6 inches from ceiling grid.
SECTION 21 13 13.00 10 Page 13
3.4.5 Upright Sprinklers
Riser nipples or "sprigs" to upright sprinklers shall contain no fittings between the branch line tee and the reducing coupling at the sprinkler.
Riser nipples exceeding 30 inches in length shall be individually supported.
3.4.6 Pipe Joints
Pipe joints shall conform to NFPA 13 except as modified herein. Welded joints will be permitted, only if welding operations are performed as required by NFPA 13 at the Contractor's fabrication shop, not at the project construction site. Flanged joints shall be provided where indicated or required by NFPA 13 . Grooved pipe and fittings shall be prepared in accordance with the manufacturer's latest published specification according to pipe material, wall thickness and size. Grooved couplings, fittings and grooving tools shall be products of the same manufacturer. The diameter of grooves made in the field shall be measured using a "go/no-go" gauge, vernier or dial caliper, narrow-land micrometer, or other method specifically approved by the coupling manufacturer for the intended application. Groove width and dimension of groove from end of pipe shall be measured and recorded for each change in grooving tool setup to verify compliance with coupling manufacturer's tolerances.
3.4.7 Reducers
Reductions in pipe sizes shall be made with one-piece tapered reducing fittings. The use of grooved-end or rubber-gasketed reducing couplings will not be permitted. When standard fittings of the required size are not manufactured, single bushings of the face type will be permitted. Where used, face bushings shall be installed with the outer face flush with the face of the fitting opening being reduced. Bushings shall not be used in elbow fittings, in more than one outlet of a tee, in more than two outlets of a cross, or where the reduction in size is less than 1/2-inch.
3.4.8 Pipe Penetrations
Cutting structural members for passage of pipes or for pipe-hanger fastenings will not be permitted. Pipes that must penetrate the walls of secured areas shall be properly grounded. Pipes that must penetrate concrete or masonry walls or concrete floors shall be core-drilled and provided with pipe sleeves. Each sleeve shall be Schedule 40 galvanized steel, ductile-iron or cast-iron pipe and shall extend through its respective wall or floor and be cut flush with each wall surface. Sleeves shall provide required clearance between the pipe and the sleeve per NFPA 13 .
The space between the sleeve and the pipe shall be firmly packed with mineral wool insulation. Where pipes penetrate fire walls, fire partitions, or floors, pipes shall be firestopped in accordance with Section 07 84 00 FIRESTOPPING. In penetrations that are not fire-rated or not a floor penetration, the space between the sleeve and the pipe shall be sealed at both ends with plastic waterproof cement that will dry to a firm but pliable mass or with a mechanically adjustable segmented elastomer seal.
3.4.9 Escutcheons
Escutcheons shall be provided for pipe penetration of ceilings and walls.
Escutcheons shall be securely fastened to the pipe at surfaces through which piping passes.
SECTION 21 13 13.00 10 Page 14
3.4.10 Inspector's Test Connection
Unless otherwise indicated, test connection shall consist of 1-inch pipe connected to the remote branch line; a test valve located approximately 7 feet above the floor; include a site glass; a smooth bore brass outlet equivalent to the smallest orifice sprinkler used in the system; and a painted metal identification sign affixed to the valve with the words "Inspector's Test". The discharge orifice shall be located outside the building wall directed so as not to cause damage to adjacent construction or landscaping during full flow discharge or cross any egress path from the building. A concrete splash block shall be provided at the test connection discharge point. Drain piping shall terminate no greater than 18 inches above the finished grade.
3.4.11 Drains
Main drain piping shall be provided to discharge at a safe point outside the building and directed so as not to cause damage to adjacent construction or landscaping or cross any egress path from the building during full flow discharge. A concrete splash block shall be provided at the test connection discharge point. Auxiliary drains shall be provided as required by NFPA 13 . Drain piping shall terminate no greater than 18 inches above the finished grade.
3.4.12 Installation of Fire Department Connection
Connection shall be mounted on the exterior wall approximately 3 feet above finished grade. The piping between the connection and the check valve shall be provided with an automatic drip in accordance with NFPA 13 and arranged to drain to the outside.
3.4.13 Identification Signs
Signs shall be affixed to each control valve, inspector test valve, main drain, auxiliary drain, test valve, and similar valves as appropriate or as required by NFPA 13 . Hydraulic design data nameplates shall be permanently engraved and permanently affixed to each sprinkler riser as specified in
NFPA 13 .
3.5 UNDERGROUND PIPING INSTALLATION
The fire protection water main shall be laid, and joints anchored, in accordance with NFPA 24 . Minimum depth of cover shall be 3 feet. The supply line shall terminate inside the building with a flanged piece, the bottom of which shall be set not less than 6 inches above the finished floor. A blind flange shall be installed temporarily on top of the flanged piece to prevent the entrance of foreign matter into the supply line. A concrete thrust block shall be provided at the elbow where the pipe turns up toward the floor. In addition, joints shall be anchored in accordance with NFPA 24 using pipe clamps and steel rods from the elbow to the flange above the floor and from the elbow to a pipe clamp in the horizontal run of pipe. Buried steel components shall be provided with a corrosion protective coating in accordance with AWWA C203. Piping more than 5 feet outside the building walls shall meet the requirements of Section 33 11 00
WATER DISTRIBUTION.
3.6 EARTHWORK
Earthwork shall be performed in accordance with applicable provisions of
SECTION 21 13 13.00 10 Page 15
Section 31 00 00 EARTHWORK.
3.7 ELECTRICAL WORK
Except as modified herein, electric equipment and wiring shall be in accordance with Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Alarm signal wiring connected to the building fire alarm control system shall be in accordance with Section 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM. All wiring for supervisory and alarm circuits shall be minimum #16 AWG solid copper installed in metallic tubing or conduit.
Wiring color code shall remain uniform throughout the system.
3.8 PIPE COLOR CODE MARKING
Color code marking of piping shall be as specified in Section 09 90 00
PAINTS AND COATINGS.
3.9 PRELIMINARY TESTS
The system, including the underground water mains, and the aboveground piping and system components, shall be tested to assure that equipment and components function as intended. Submit proposed procedures for Preliminary Tests, no later than 14 days prior to the proposed start of the tests and proposed date and time to begin the preliminary tests. The underground and aboveground interior piping systems and attached appurtenances subjected to system working pressure shall be tested in accordance with NFPA 13 , NFPA 14 and NFPA 24 . Upon completion of specified tests, submit three copies of the completed Preliminary Test Report, no later than 7 days after the completion of the Tests. The Report shall include both the Contractor's Material and Test Certificate for Underground Piping and the Contractor's Material and Test Certificate for Aboveground Piping. All items in the Preliminary Tests Report shall be signed by the Fire Protection Specialist.
3.9.1 Underground Piping
3.9.1.1 Flushing
Underground piping shall be flushed in accordance with NFPA 24 . This includes the requirement to flush the lead-in connection to the fire protection system at a flow rate not less that the calculated maximum water demand rate of the system.
3.9.1.2 Hydrostatic Testing
New underground piping shall be hydrostatically tested in accordance with NFPA 24 . The allowable leakage shall be measured at the specified test pressure by pumping from a calibrated container. The amount of leakage at the joints shall not exceed 2 quarts per hour per 100 gaskets or joints, regardless of pipe diameter.
3.9.2 Aboveground Piping
3.9.2.1 Hydrostatic Testing
Aboveground piping shall be hydrostatically tested in accordance with NFPA 13 at not less than 200 pounds per square inch or 50 pounds per square inch in excess of maximum system operating pressure, whichever is greater, and shall maintain that pressure without loss for 2 hours. There shall be
SECTION 21 13 13.00 10 Page 16 no drop in gauge pressure or visible leakage when the system is subjected to the hydrostatic test. The test pressure shall be read from a gauge located at the low elevation point of the system or portion being tested.
3.9.2.2 Backflow Prevention Assembly Forward Flow Test
Each backflow prevention assembly shall be tested at system flow demand, including all applicable hose streams, as specified in NFPA 13 . Provide all equipment and instruments necessary to conduct a complete forward flow test, including 2.5-inch diameter hoses, playpipe nozzles, calibrated pressure gauges, pitot tube gauge, plus all necessary supports to safely secure hoses and nozzles during the test. At the system demand flow, the pressure readings and pressure drop (friction) across the assembly shall be recorded. Provide a metal placard on the backflow prevention assembly that lists the pressure readings both upstream and downstream of the assembly, total pressure drop, and the system test flow rate. The pressure drop shall be compared to the manufacturer's data.
3.9.3 Testing of Alarm Devices
Each alarm switch shall be tested by flowing water through the inspector's test connection. Each water-operated alarm devices shall be tested to verify proper operation.
3.9.4 Main Drain Flow Test
Following flushing of the underground piping, a main drain test shall be made to verify the adequacy of the water supply. Static and residual pressures shall be recorded on the certificate specified in paragraph SUBMITTALS. In addition, a main drain test shall be conducted each time after a main control valve is shut and opened.
3.10 FINAL ACCEPTANCE TESTS
3.10.1 USACE - Automatic Sprinkler System
Begin the Final Acceptance Test with the Contracting Officer's Designated Representative (COR) only when the Preliminary Test Report has been approved. The Fire Protection Installer shall conduct the Final Acceptance Test and shall provide a complete demonstration of the operation of the system. This shall include operation of control valves and flowing of inspector's test connections to verify operation of associated waterflow alarm switches. After operation of control valves has been completed, the main drain test shall be repeated to assure that control valves are in the open position. In addition, the representative shall have available copies of as-built drawings and certificates of tests previously conducted. Final Acceptance Testing shall be witnessed by the QFPE. The installation shall not be considered accepted until identified discrepancies have been corrected and test documentation is properly completed and received.
Submit the Final Acceptance Test Report as specified in the Submittals paragraph.
3.10.2 Base Fire Department, Base Plumbing Shop and Base Fire Alarm Shop - Automatic Sprinkler System
Begin the Final Acceptance Test with the Base Fire Department, Base Plumbing Shop and Base Fire Alarm Shop only when both the Preliminary Test Report has been approved and the Final Acceptance Test performed with the Contracting Officer's Designated Representative (COR) has been completed
SECTION 21 13 13.00 10 Page 17 and accepted. The Fire Protection Installer shall conduct the Final Acceptance Test and shall provide a complete demonstration of the operation of the system.