About this file

This combined synopsis and solicitation requests quotations for the fabrication of 105 non-functional components for the VIPER Surface Segment model. The National Aeronautics and Space Administration Johnson Space Center seeks to assemble a representative model to develop procedures and assess interfaces. Offerors must provide pricing and a technical approach for the fabrication methods, materials, and delivery schedule. The solicitation number is 80JSC020Q0018. Components include 55 different types totaling 105 pieces. Successful offerors must deliver the first component within 6 weeks of award and all components within 4 months, with staggered delivery. Quotes are due by September 25, 2020 and must include pricing, delivery schedule, payment terms, and technical approach. The award will be made to the responsible offeror whose proposal is most advantageous based on fabrication approach and cost, followed by ability to meet the delivery schedule.

View the file

Other files for this federal contract opportunity

Other files attached to VIPER Fabrication Services, newest first.
File Type Posted
OBTAINING ACCESS TO EXPORT CONTROLLED CONTENT AMD 2.pdf PDF
80JSC020Q0018 - Questions Answers.docx DOCX document
OBTAINING ACCESS TO EXPORT CONTROLLED CONTENT.pdf PDF
VIPER Fab Services IDIQ Contract 2020-09-02.pdf PDF
OBTAINING ACCESS TO EXPORT CONTROLLED CONTENT.docx DOCX document
Terms and Conditions1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EAR ECCN 99

- Export Administration Regulations (EAR) Notice -

This document contains information within the purview of the Export Administration Regulations (EAR), 15 CFR §730-774, and is export-controlled. It may not be transferred to foreign persons in the U.S. or abroad without specific approval of a knowledgeable export control official, and/or unless an export license or license exception is obtained/available from the Bureau of Industry and Security, United States Department of Commerce. Violations of these regulations are punishable by fine, imprisonment, or both.

EAR ECCN 99 This document contains information within the purview of the Export Administration Regulations (EAR), 15 CFR §730-774, and is export-controlled (see Cover Page)

VIPER Fabrication Services Statement of Work

Sample TO 1

The National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) is seeking fabrication services of non-functional components of the VIPER Surface Segment. Vendors are requested to provide a Quote with the understanding that the final reference data will be provided upon award. VIPER is a robotic mission that will be launched to the Moon in 2023 (see Figures 1 and 2). NASA will use these components to assemble a non-functional model of the VIPER Surface Segment as an aid to develop procedures and assess interfaces, alignments, clearances, and accessibility throughout the assembly and integration process.

Figure 1: Surface Segment Design

Figure 2: Surface Segment Internal Packaging

EAR ECCN 99 This document contains information within the purview of the Export Administration Regulations (EAR), 15 CFR

The Contractor shall fabricate 105 components that NASA will assemble into a representative, non-functioning model of the VIPER Surface Segment.

• The Contractor shall review the Government Furnished Data and determine fabrication processes and methods, materials, fastening methods and finishing for creating each of the components.

o Fastener through-holes and threaded interfaces are identified in the Reference Attachments.

o Threaded interfaces are critically important. If a threaded interface cannot be made patent via the selected fabrication process (e.g. SLA, LASER sintering, etc.), then an alternate threaded solution shall be incorporated into the component (e.g., brass heat set insert).

• The Contractor shall select fabrication processes and methods, materials, fastening method, and finishing for each component to enable assembly of the VIPER Surface Segment.

o Delivery of monolithically fabricated components is preferred, but components assembled from multiple pieces are acceptable for larger items.

• Prior to fabrication, the Contractor shall conduct a meeting with NASA to discuss the fabrication methods, materials, and fastening methods for each component for review and approval.

o This requirement can be satisfied by one or more meetings with NASA, at the Contractor’s discretion

• The Contractor shall fabricate each component in accordance with the methods and materials agreed to with NASA

• The Contractor shall inspect each component to verify dimensions at the fastening locations to +/- 1 millimeters and verify the overall Outer Mold Line dimensions to +/- 4 mm.

o No Certification of Compliance is required

• The Contractor shall deliver each finished component as it is completed (i.e., the delivery of components shall be staggered, rather than delivered all at once).

Government Furnished Data

The following Reference Data provides the design information for the components to be fabricated.

Vendors should provide a Quote with the understanding that the final Reference Data, including CAD models, will be provided upon award.

• Component quantities, dimensional information and details regarding the fastening locations (Reference Attachment A) o There are 55 different types of components to be fabricated – some in multiple quantities – for a total of 105 components to be delivered.

• CAD model of the Surface Segment and CAD models of each component to be fabricated (Reference Attachment B) o STL or STP formatted CAD models are provided for each component. Alternative CAD formats can be made available upon request.

EAR ECCN 99 This document contains information within the purview of the Export Administration Regulations (EAR), 15 CFR

Delivery Schedule

• The Contractor shall deliver the first component within 6 weeks of Authority to Proceed

(ATP)

• The Contractor shall deliver all components within 4 months of Authority to Proceed (ATP)