Vertical Storage for BLDG 79 SOW Final.docx

DOCX document 19 KB Posted

Attached to
145th MXG Vertical Lift Federal contract opportunity
Solicitation number
W50S87-20-Q-5029
Issued by
Department of the Army North Carolina Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to 145th MXG Vertical Lift, newest first.
File Type Posted
W50S87-20-Q-5029.pdf PDF
Vertical Storage for BLDG 4 and 51 SOW Final.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Building #79 North Carolina Air National Guard 145 MXS/Aircraft Structural Maintenance

· Vertical Carousel must be of Ergonomic Design

· All Vertical Carousels must be “Clip System” panel concept for fast assemble/disassemble and for maintenance purposes allowing for high operator security if stored goods fall inside the unit.

· All Vertical Carousels shall come with a lifetime warranty of the motor to assure years of reliable usage. All other components carry a 2-year warranty, including transportation, parts and labor.

· Vertical Carousels shall come equipped with an Emergency Power Crank for access to parts in case of power failure

· Vertical Carousels shall come equipped with a stainless-steel table surface at a standing position.

· Vertical Carousel shall have an imbalance indicator located on the operator station display that will alert the operator to any imbalance load.

· Vertical Carousels shall come equipped with a lockable lightweight one-piece sliding door. Self-counterbalanced sliding door can be opened and closed with minimal effort. Two-piece sliding doors without counterbalance are not acceptable.

· Vertical Carousels must have 100% Reliable Safety Security System

· Vertical Carousels shall come equipped with finger protection safety buffer at rear of posting board.

· Vertical Carousels must come with transport rollers for fast and easy repositioning in the case of internal moves, providing maximum flexibility for unit positioning with minimum downtime and reinstallation costs.

· Vertical Carousels must have standard manual override systems allowing for the unit to be used until service technician’s repair.

· Vertical Carousels must have a standard manual override that can be operated with the door open, so parts can be located using “drive and view”, without having to know what carrier the part is stored on.

· The contactor must ensure the equipment complies with DIN EN 15095 “Power-operated mobile racking and shelving, carousels and storage lifts” and has been tested and certified by TÜV (Technical Observation & Control), a USA NRTL and a Canadian CB.

· The manufacture must be certified ISO 9001.

· The manufacture must be certified ISO 14001.

1. DETAILED VENDOR REQUIREMENTS:

· Contractor services shall be offered through an office that has a 24-hour turn-around time and must be assured and guaranteed on all requests for service. The installation and service must be performed by factory trained and authorized qualified individuals.

· Contractor must include Preventive Maintenance Services every 6 months for the duration of the 2-year warranty period in the price of the contract for the equipment.

2. OVERALL EQUIPMENT SPECIFICATION:

Vertical Carousel (VCM):

· Overall Unit Height: 11 ft-10.2 in.

· Minimum Room Height for Installation: 12 ft-0.1 in

· Overall Unit Width: 11 ft. – 7 in.

· Overall Unit Depth: 4 ft. – 10 in.

· Cubic Storage per Unit: 277.5 ft³

· Storage Area per Unit: 415.8 ft²

· Unit Weight (Empty): 6069 lb.

· Unit Weight (Loaded): 14577 lb.

· Maximum Imbalance Load: 2646 lb.

· Cycle Speed: 4.92 in. /sec.

· Access Time: 11 sec (1/4 Revolution)

· Power Supply: 3/PE 220V (50/60 Hz)

· Rated Operating Current: 12.5 A

· Motor Power: 3 HP; 2.2 kW

· Fuse Protection: 20 A t

· Control Generation C3000

· Power Consumption: 4.8 kVA

· Controller Location: Right hand end column

· E‐Stop Location: (1) per Side Panel (2 Total)

· Controller: OPLogicontrol

· Access Height 39.37 in.

· Access Opening Light (LED)

· Door Type: Manual

· Carriers per Unit: 12 Multipurpose Carriers

· Intermediate Shelves for Multipurpose Carriers: 12

· Spacing (Pitch): 18 in.

· Carrier Clear Height: 16.02 in. (6 carriers)

· Shelf (intermediate) Clear Height: 5.02 in., 5.02 and 5.12 in. (6 carriers)

· Carrier Clear Width: 120.1 in.

· Carrier Clear Depth: 20.8 in.

· Carrier Capacity (max): 772 lbs.

3. AT OPSEC Requirements:

· AT Level I training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within XX calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within XX calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil

· Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

· For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

END SCOPE OF WORK