VALIANT SOW Solicitation.pdf
PDF 1 MB Posted
- Attached to
- Dock-Side: USCGC VAILANT FY24 DS Federal contract opportunity
- Solicitation number
- 70Z08024QMECP0001
About this file
This specification outlines the requirements for dock-side repairs and maintenance to be conducted on the USCGC VALIANT (WMEC-210B) under solicitation number 70Z08024QMECP0001. Key work items include cleaning and inspecting seawater heat exchangers, lube oil heat exchangers, exhaust piping, pneumatic tanks, holding tanks and piping. Additional requirements involve tasks such as renewing flexible couplings, inspecting davits and pumps, installing compasses and hatches, and providing temporary services. The specification establishes general expectations, references applicable drawings and technical publications, and provides item-level details for accomplishing the work in accordance with safety and quality standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CGC VALIANT DS FY24_SF30 A0001_QandA.pdf | ||
| 70Z08024QMECP0001.pdf | ||
| VALIANT Schedule of Services.xls | XLS spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC VALIANT (WMEC 621)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2024
Developed By: Colin D Gregory
(Rev-0, 28 June 2023)
Attachment 2
USCGC VALIANT (WMEC-210B) DOCKSIDE AVAILABILITY FY2024
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property .............................................................................. viii Consolidated List of Critical Inspection Items ............................................................................................. ix Principal Characteristics ................................................................................................................................ x General Requirements WORK ITEM 1: Flexible Couplings, Renew WORK ITEM 2: Seawater Heat Exchangers, Clean, Inspect And Hydro WORK ITEM 3: Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean WORK ITEM 4: Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial Clean WORK ITEM 5: Boiler Exhaust Stack Uptakes, Commercial Clean WORK ITEM 6: Lube Oil Heat Exchangers; Clean, Inspect And Hydro WORK ITEM 7: Chill Water System, Clean and Flush WORK ITEM 8: Potable Water Pneumatic Tanks, Clean and Inspect WORK ITEM 9: Hot Water Accumulator Tanks, Clean and Inspect WORK ITEM 10: Single Point Davit, Inspect and Service WORK ITEM 11: Sewage Discharge and Vacuum Pumps, Renew WORK ITEM 12: Grey Water Holding Tanks, Clean and Inspect WORK ITEM 13: Sewage Holding Tanks, Clean and Inspect WORK ITEM 14: Sewage Piping, Clean and Flush WORK ITEM 15: Tanks, Grey Water Holding, Preserve, Partial WORK ITEM 16: Tanks (Sewage Holding), Preserve, Partial WORK ITEM 17: Temporary Services, Heating and Cooling WORK ITEM 18: Compass And Binnacle, Install WORK ITEM 19: Watertight Hatches, External DC Deck and Below, Renew WORK ITEM 20: Fuel Oil Piping, Clean and Inspect WORK ITEM 21: CPP Suction Piping, Renew WORK ITEM 22: Sewage Vacuum and Vent Piping, Clean and Inspect WORK ITEM 23: Deck Plating and Deck Covering, Interior, Wet and Dry, Renew WORK ITEM 24: Gaylord Hood Drain Piping, Clean and Inspect WORK ITEM 25: Pilothouse Deck Plating, Preservation WORK ITEM 26: Bridge Window Drains, Renew WORK ITEM 27: Fantail Mooring Chock Foundation, Renew WORK ITEM 28: Turbid Tank Clean and Tank Level Indicator Float Switch Threaded Couplings, Renew103 WORK ITEM 29: Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift . 107 WORK ITEM 30: Fuel Tank Cleaning and Fuel Oil Piping, Renew WORK ITEM 31: Bridge Wing Deck Drain and Plating, Renew iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Bill of Materials 627 WMEC 088, Rev F, Arr. of Plumbing Sys & Deck Drains
Coast Guard Bill of Materials 627 WMEC 099, Rev D, Arrt MSD System
Coast Guard Bill of Materials 627 WMEC 327, Rev G, Watertight Doors, Hatches, & Scuttles
Coast Guard Drawing 618 WMEC 256-003, Rev B, CAT 3306B EDG Installation S.W. Cooling Piping
Mods
Coast Guard Drawing 627 WMEC 131-001, Rev D, Second & Main Deck Plating & Supports
Coast Guard Drawing 627 WMEC 136-001, Rev G, 01, 02 & Bridge Deck Plating & Supports
Coast Guard Drawing 627 WMEC 154-001, Rev C, Aluminum Pilothouse Details
Coast Guard Drawing 627 WMEC 167-001, Rev L, Schedule of Steel Doors, Hatches, Scuttles, &
Manholes
Coast Guard Drawing 627 WMEC 184-001, Rev N, Pilothouse and Bridge Deck FDNS
Coast Guard Drawing 627 WMEC 184-006, Rev-, Pilothouse and Bridge Deck FDNS
Coast Guard Drawing 627 WMEC 201-001, Rev C, Arrangement of Machinery Plans, Sections &
Elevations
Coast Guard Drawing 627 WMEC 243-001, Rev D, Arrangement and Details Stern Tube Seals
Coast Guard Drawing 627 WMEC 243-008, Rev K, Shaft Installation
Coast Guard Drawing 627 WMEC 243-010, Rev -, CPP Hydraulic Storage Tank & Piping Arrangement
Coast Guard Drawing 627 WMEC 252-001, Rev G, Control Air Piping Arrangement
Coast Guard Drawing 627 WMEC 252-006, Rev -, LUFKIN HSQ2724 Marine Gear Schematics – Lube
Oil System and Wiring
Coast Guard Drawing 627 WMEC 259-001, Rev D, Arrangement Exhaust Piping
Coast Guard Drawing 627 WMEC 261-001, Rev C, Diagram Fuel Oil System
Coast Guard Drawing 627 WMEC 261-002, Rev F, Arrangement of Fuel Oil System
Coast Guard Drawing 627 WMEC 262-001, Rev E, Arrangement of Lube Oil System
Coast Guard Drawing 627 WMEC 262-002, Rev E, Diagram Lube Oil System
Coast Guard Drawing 627 WMEC 262-005, Rev A, Mods to Lube Oil & Associated Piping for Spinner II
Installation
Coast Guard Drawing 627 WMEC 401-001, Rev AL, I.C. & Gyro Room General Arrangement
Coast Guard Drawing 627 WMEC 401-004, Rev AK, Pilothouse Arrangement
Coast Guard Drawing 627 WMEC 512-007, Rev D, Ventilation Diagram - Main Deck v (Rev-0)
Coast Guard Drawing 627 WMEC 514-001, Rev D, Diagram: Heating and Chilled Water System
Coast Guard Drawing 627 WMEC 514-002, Rev C, Arrangement of Chilled and Hot Water System
Inside Machinery Space
Coast Guard Drawing 627 WMEC 514-003, Rev D, Arrangement of Chilled and Hot Water System
Outside Machinery Space
Coast Guard Drawing 627 WMEC 514-004, Rev C, Heating, Ventilation & Air Cond Control, Block &
Schematic Wrg Diagrams
Coast Guard Drawing 627 WMEC 528-001, Rev H, Arr. of Plumbing Sys & Deck Drains
Coast Guard Drawing 627 WMEC 528-002, Rev E, Diagram of Plumbing System & Deck Drains
Coast Guard Drawing 627 WMEC 533-001, Rev K, Diag. Hot & Cold Potable Water System
Coast Guard Drawing 627 WMEC 533-003, Rev C, Piping Diagram & Arrg’t Helicopter Engine Water
Washdown
Coast Guard Drawing 627 WMEC 533-004, Rev D, Hot Water Storage Tank Mod
Coast Guard Drawing 627 WMEC 536-001, Rev C, Diagram Sea Water Piping for Mn Engs, Aux &
Emergency Gens. & A.C. Condensers
Coast Guard Drawing 627 WMEC 536-002, Rev G, Arr. of S.W. Cooling for Main and Aux. Engines &
A/C Condensers
Coast Guard Drawing 627 WMEC 536-003, Rev D, Diagram – F.W. for Machinery Cooling
Coast Guard Drawing 627 WMEC 536-053, Rev A, Heat Exchanger
Coast Guard Drawing 627 WMEC 551-001, Rev E, Diagram Compressed Air Piping
Coast Guard Drawing 627 WMEC 551-002, Rev D, Arrangement of Compressed Air in Machinery Space
Coast Guard Drawing 627 WMEC 582-002, Rev -, Mooring Bitts & Chocks
Coast Guard Drawing 627 WMEC 583-003, Rev C, Boat Davit Hydraulic Circuit
Coast Guard Drawing 627 WMEC 583-007, Rev D, D5700 CT SPD/RHI Arrg’t & Dets. Port Side
Coast Guard Drawing 627 WMEC 593-001, Rev B, Diagram - MSD System
Coast Guard Drawing 627 WMEC 593-002, Rev D, Arrg’t. MSD System
Coast Guard Drawing 627 WMEC 601-003, Rev E, General Arrangement – Second and Third Decks
Coast Guard Drawing 627 WMEC 601-004, Rev D, General Arrangement – Main & 01 Deck
Coast Guard Drawing 627 WMEC 601-005, Rev F, General Arrangement – 02 Dk, Bridge Dk, & House
Top
Coast Guard Drawing 627 WMEC 621-003, Rev D, Joiner General Arrangement 01 Deck, 02 Deck &
Bridge Deck
Coast Guard Drawing 627 WMEC 634-001, Rev D, Deck Coverings
Coast Guard Drawing 627 WMEC 651-001, Rev H, Arrg’t Crews Galley, Mess & Scullery
Coast Guard Drawing 627 WMEC-635-002, Rev B, Sheathing & Insulation
Coast Guard Drawing FL-1602-CGY-25, Rev A, Raised Watertight Hatches
NAVSEA Drawing 167-7379842, Rev A, Procedure & Welding Sequence for Non-Ballistic, Watertight
& Airtight Quick Acting or Individually Dogged Personnel Doors
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Technical Publication (TP) 2754, SWBS 583, August 2013, Hydraulic Power Unit (HPU) vi (Rev-0)
Coast Guard Technical Publication (TP) 3233B, Section A, Magnetic Compass and the American
Reflector Binnacle
Coast Guard Technical Publication (TP) 3240B, SWBS 583, May 2010, Hydraulic Power Unit – Motor
Controller
Coast Guard Technical Publication (TP) 3241A, SWBS 593, June 2011, Vacuum Sewage System
Coast Guard Technical Publication (TP) 3485C, SWBS 583, Sept 2013, Single Point Boat Model
D5700CT
Coast Guard Technical Publication (TP) 3965, Apr 2020, Air Conditioning System, R-134A – Model
90RMC025-D-6-D005/MS1
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2022, Overhaul AC
Electrical Motors
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2022, Install Interior
Deck Covering Systems
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 0000), 2022, Temporary
Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2022, Temporary
Hull Accesses
OTHER REFERENCES
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2019, Disinfection of Water-Storage Facilities
American Society for Testing and Materials (ASTM) International F1508, 2016, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services
American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves-Flanged, Threaded, and
Welding End
ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets
Cassen & Plath Technical Publication, Reflecta/1 Operation – Installation Manual
Code of Federal Regulations (CFR) Title 29, Part 1915, 2022, Occupational Safety and Health Standards for Shipyard Employment
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment
Commercial Item Description (CID) A-A-59316, 2016, Abrasive Materials; for Blasting
Commercial Item Description (CID) A-A-59588, July 2018, Rubber Silicone
Commercial Item Descriptions (CID) A-A-59316, Nov 2003; Abrasive Materials for Blasting
Manufacturer’s Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2018 Edition, Pipe Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation vii (Rev-0)
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2019 Edition, Pressure Testing Of Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2019 Edition, Bronze Gate, Globe, Angle and Check Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2018 Edition, Pipe Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation
Military Specification MIL-A-22262B, March 1996, Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-PRF-17672E, Oct 2010, Hydraulic Fluid, Petroleum, Inhibited
MIL-PRF-24667C, May 2008, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application
QPL-24667, Qualified Product List (Military) of Products Qualified Under Detail Specification MIL-
PRF-24667, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP-1), 2015, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 3, (SSPC-SP-3), 2018, Power Tool Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Standard No. 11 (SSPC-SP 11), 2013, Power-Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC)/NACE International (NACE) 2007, Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, Near-White Metal Blast Cleaning viii (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
2 N MDE JW Seal Kit NSN: 2930-01-602-8570 P/N:
10-1AEW SEAL
2 ea 1,250.00
2 Y **JW Cooler NSN: 4420-01-698-9362 2 ea 31,200.00
2 Y **JW Cooler Tube
Bundle
NSN: 4420-01-496-9702 2 ea 12,900.00
6 N Gasket, Shell, Inner NSN: 5330-01-478-5220 2 ea 27.00
6 N O-ring, Shell, Outer
End
NSN: 5331-01-478-5310 4 ea 19.00
6 N Gasket, Shell, Outer NSN: 5330-01-478-5215 4 ea 29.00
6 Y **Lube Oil Cooler NSN: 2930-01-698-9373 2 ea 44,900.00
6 N **Lube Oil Cooler
Tube Bundle
NSN: 4420-01-524-9258 2 ea 33,000.00
10 N Rope, wire assembly with swage socket
PN: FL-8201-093 Item 1
NSN: 4010-01-602-8365
1 ea. 250.00
10 Y Hook, release PN: APR-356-CBH NSN:
4030-01-467-1005
1 ea. 4,340.00
10 Y Davit control console PN: 60576 NSN: 2030-01-
612-7381
1 ea. 44,000.00
11 N Sewage Discharge
Pump
NSN: 4320-01-273-9350 2 ea. 4,719.00
11 N Sewage Vacuum
Transfer Pump
NSN: 4320-01-519-3163 2 ea. 4,719.00
18 N Fiberline/Reflecta/1
Compass/Binnacle
PN: 210020 1 ea. 8,974.50
19 N 46 inch x 42 inch
Raised Watertight
Hatch, Steel, (Raised 13 inch coaming, 25 inch
WTS (hinge fwd))
NSN: 2040-01-LG4-3661 1 ea. 12,000
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
ix (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.1.4
(Inspection report particulars)):
Work
Item Title
10 Single Point Davit, Inspect and Service x (Rev-0)
PRINCIPAL CHARACTERISTICS
210' WMEC (B-CLASS)
PHYSICAL
Length overall 210' 6"
Length between perpendiculars 200' 0"
Beam molded 34' 0"
Depth molded, main deck amidships 19' 6"
Full load displacement 1,170 long tons
Draft, full load to baseline amidships
*Baseline is 9” below keel amidships
12' 0"
Design drag between perpendiculars 1' 6"
Highest projection above baseline
*VHF-FM ADF antenna
90' 0"
Shore tie voltage requirements 400A / 440V
Frame spacing 1' 0"
MACHINERY
Main propulsion 2 ALCO Model 16-251-B Diesel Engines, 5,000 BHP total
Ship's service generators 2 Caterpillar Model 3406B Diesel-driven SR4, 250 KW each @ 0.8 power factor, 440VAC, 3 phase, 60 cycle
Emergency generator Caterpillar Model 3306B Diesel-driven SR4, 180 KW @ 0.8 power factor, 440VAC, 3 phase 60 cycle
Number of propellers 2
Propeller diameter 7' 6"
Number of blades, each 4
Pitch Controllable
Shaft RPM 300
Shaft diameter 8.25" at exit of hull
Anchor & chain Two 2,800 lb Navy Stockless Anchors, 7 shots of chain each
TANK CAPACITIES
Diesel fuel total (95%) 48,427 gal.
Fresh water total (100%) 11,693 gal.
JP-5 fuel total (95%) 4,683 gal.
Lube oil total (95%) 2,390 gal.
1 (Rev-0)
00000_0522_FLT
REC_00000_FLT_Commercial Project @ CG Facility (0121)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-0)
NOTE
NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast
Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents.
Contractors can apply to NAVSEA headquarters directly for copies.
3.2 Fire watch requirements. The Contractor must refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec
0000, in accomplishing the following task:
• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
• Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.
3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).
3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.
3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.
Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:
• ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.
• ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.
3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.
For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).
3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;
for each additional 1000 square feet, perform an additional area measurement. A “measurements” for coating thickness is defined as follows:
• SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.
• SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must
3 (Rev-0) be moved to a new location within a 1.5 inch diameter circle defining the spot.
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor must provide and maintain environmental protection as defined in SFLC
Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable
Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is Large Quantity
Generator (LQG).
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
• Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an
NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
• Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.
3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’
Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;
ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous
4 (Rev-0)
Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental
Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix B, Requirements For
Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor must be aware of the following:
3.5.6.1 No Contractor or Subcontractor must have the authority to sign a Hazardous Waste Manifest using the
Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast
Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor must prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor must furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. The Contractor must refer to site (e.g. Base) Regulations and Instructions for details regarding local policies (e.g. crane services, parking, or facility usage).
3.7 SFLC Standard Specification approved changes. The Contractor must be aware that the following are approved changes to published SFLC 2022 Edition Standard Specifications and supersede published content:
3.7.1 SFLC Standard Specification 6310.
3.7.1.1 On page 2, replace REFERENCE “MIL-PRF-24667C, May 2008, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application” with “MIL-PRF-24667D, FEB 2021, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application”
3.7.1.2 On page 9, replace the NOTE under paragraph 3.1.8.5 as follows:
NOTE
De-ionized water may be used in cases where available fresh water has excessive chloride/chlorine content. Submit a CFR prior to using de-ionized water.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME
6 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
7 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
TIME
8 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):
Mean Reading
(mils)
9 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
10 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
11 (Rev-0)
4.2 Tank and Void Assessment form.
12 (Rev-0)
13 (Rev-0)
23300_CMD_0121_210_270
WORK ITEM 1: Flexible Couplings, Renew
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew designated flexible couplings and associated hoses for the Main Diesel Engines, Ship Service Diesel Generators, and
Emergency Diesel Generators.
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN
QTY ESTIMATED
COST
($/UNIT)
NOTE:
Cutter will supply GFE.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 618 WMEC 256-003, Rev B, CAT 3306B EDG Installation S.W. Cooling
Piping Mods
Coast Guard Drawing 627 WMEC 262-001, Rev E, Arrangement of Lube Oil System
Coast Guard Drawing 627 WMEC 262-002, Rev E, Diagram Lube Oil System
Coast Guard Drawing 627 WMEC 262-005, Rev A, Mods to Lube Oil & Associated Piping for
Spinner II Installation
Coast Guard Drawing 627 WMEC 536-002, Rev G, Arr. of S.W. Cooling for Main and Aux.
Engines & A/C Condensers
Coast Guard Drawing 627 WMEC 536-003, Rev D, Diagram – F.W. for Machinery Cooling
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
14 (Rev-0)
OTHER REFERENCES
Manufacturer’s Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2018
Edition, Pipe Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, (Interferences). Known interferences include, but are not limited to the following:
• Deck plates
• Work bench
• Piping
• Engine room machinery
3.2 Removal. The Contractor must disconnect and remove the flexible connections between the main engine, ship service diesel generator, and emergency diesel generator and the connected fluid systems for fuel, oil, lube oil, jacket water and seawater in accordance with the Coast Guard drawings and publications listed in Section 2 (References).
3.3 Alignment between coupling flanges. The Contractor must inspect each expansion joint piping flanges for axial, lateral, angular, and torsional alignment prior to installing new flexible connections and control rod assemblies, as follows. Submit a CFR.
NOTES
1. Piping misalignment in the system should not exceed a maximum of plus or minus 1/8 inch.
2. Axial alignment measurement should correspond to the expansion joint’s face to face dimension otherwise an axial misalignment is indicated.
3. Lateral misalignment is indicated by any variation in the measured dimensions and an inconsistency in the level.
4. Angular misalignment is indicated by any variation in the measured dimensions.
15 (Rev-0)
5. Torsional misalignment is indicated by any bolt holes on each flange not lining up to each other.
3.3.1 Axial alignment. Measure from inside of one mating flange to the inside of the other, to include the area in which the expansion joint is to be installed.
3.3.2 Lateral alignment. Place a level on the outside edge of the mating flanges and measure the distance across. Repeat the measurement an additional three times to obtain a total of four measurements evenly distributed around the circumference of the mating flanges.
3.3.3 Angular alignment. Measure from the edge of one mating flange to the same corresponding spot on the opposite flange. Record this value and then repeat the same measurement on the opposite side of the flange (180 degrees from the initial measurement). Repeat these measurements to obtain a total of at least four paired measurements evenly distributed around the circumference of the flanges.
3.3.4 Torsional alignment. Check the flange bolt pattern on each mating flange to ensure the bolt holes on each flange line up to each other.
3.4 Pipe hanger inspection. The Contractor must inspect the condition of each of the associated pipe hangers and other support devices in the vicinity of the flexible expansion joint being renewed, to ensure they are adequately supporting the weight of the piping systems and in accordance with MSS SP-58.
Significant movement of the piping system when the expansion joint is removed indicates the pipe hanger arrangement is insufficient. Submit a CFR.
3.5 Installation. The Contractor must install government-furnished flexible expansion joints, control rod assemblies, and Integral Tie Rod (ITR) plates after all alignment measurements have been verified to be within tolerance or corrected via a change request authorized by the KO, in accordance with Coast Guard
Drawings and Tech Pubs listed in Section 2 (References). The Contractor must renew all grade eight fasteners, flat washers, lock washers and nuts.
3.5.1 ITR plate position. The Contractor must secure the ITR plates in place with the flange bolting.
Position the ITR plates as shown below. Install the flange bolt head and flat washer against the ITR plates.
16 (Rev-0)
FIGURE 1. ITR PLATE POSITION
WARNING
The control rod assembly shall not be used to correct for flange misalignment.
3.5.2 Control rod assembly adjustment. The Contractor must ensure the following.
• Control rods are evenly spaced around the joint.
• Inner control rod nuts are adjusted to allow zero joint compression.
• Outer control rod nuts are adjusted to allow approximately 1/8 inch joint expansion.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.6 Operational test, post repairs. After completion of work, the Contractor must thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
3.7 Leak test. After completing all authorized mechanical (i.e. threaded, bolted, etc.) joint repairs, the
Contractor must test the system’s operation using the system fluid at normal operating pressure. Ensure zero visible leakage from or deformation of mechanical parts by repairing all leaks and discrepancies.
Submit a CFR.
4. NOTES
This section is not applicable to this work item.
25600_0223_210_270_295
17 (Rev-0)
25600_0223_210_270_295
REC_25600_210_270_295_210’ WMEC ‘B’ Class (ALL) (0922)
WORK ITEM 2: Seawater Heat Exchangers, Clean, Inspect And Hydro
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following heat exchanger(s):
TABLE 1 – HEAT EXCHANGERS
DESCRIPTION LOCATION OEM / MODEL QTY
MDE Jacket Water Engine Room American Precision, p/n
70A62A10108
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED COST
($/UNIT)
N MDE JW Seal Kit NSN: 2930-01-602-8570
P/N: 10-1AEW SEAL
2 ea 1,250.00
Y **JW Cooler NSN: 4420-01-698-9362 2 ea 31,200.00
Y **JW Cooler Tube Bundle NSN: 4420-01-496-9702 2 ea 12,900.00
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 627 WMEC 201-001, Rev C, Arrangement of Machinery Plans, Sections &
Elevations
Coast Guard Drawing 627 WMEC 536-001, Rev C, Diagram Sea Water Piping for Mn Engs, Aux
& Emergency Gens. & A.C. Condensers
Coast Guard Drawing 627 WMEC 536-003, Rev D, Diagram – F.W. for Machinery Cooling
Coast Guard Drawing 627 WMEC 536-053, Rev A, Heat Exchanger
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems
18 (Rev-0)
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2022, Temporary Hull Accesses
OTHER REFERENCES
Commercial Item Description (CID) A-A-59588, July 2018, Rubber Silicone
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, Paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, (Interferences). Known interferences include, but are not limited to the following:
• Piping and hoses
• Filters
• Deck plating and associated framing
• Electrical cables
• Thermal insulation.
3.2 Temporary access openings. With express permission of the KO via submission of a CFR and in accordance with SFLC Std Spec 8636, the Contractor may perform all work required to cut open and close temporary access openings to facilitate accomplishment of the work specified herein.
3.3 Fluid disposition, disposal. Dispose of all removed fluids in accordance with all applicable Federal, state, and local regulations.
3.4 Disassemble. The Contractor must drain and remove the designated heat exchangers (see paragraph
1.1 (Intent)) to a suitable repair facility and disassemble to the extent necessary to perform all work specified herein. Refer to Coast Guard Drawings 627 WMEC 201-001, 627 WMEC 536-001, 627 WMEC
536-003 and 627 WMEC 536-053 for guidance. Perform all disassembly and reassembly in accordance with manufacturer-recommended procedures using manufacturer-recommended tooling to ensure parts are reinstalled in proper sequence and configuration.
19 (Rev-0)
3.5 Inspection. Before cleaning is begun, the Contractor must visually inspect all heat exchanger surfaces for excessive deterioration and any other defects. Submit a CFR.
3.6 Cleaning requirements. The Contractor must clean all interior and exterior heat transfer surfaces to a state free of all debris, scale and surface contaminants in accordance with the heat exchanger manufacturer’s recommendations, and in compliance with all Federal, state, and local environmental regulations. Ensure that chemical cleaners do not damage the environment, heat exchanger or the vessel.
NOTE
Historically, chemical cleaning has been necessary to thoroughly clean most heat exchanger tubes.
3.7 Reassembly. After authorized repairs, if any, the Contractor must reassemble each heat exchanger.
3.7.1 Renew all software (seals, gaskets, O-rings, lantern rings).
3.7.2 Renew isolation fittings/mounts and fasteners if disturbed. Apply silicone rubber sealant conforming to CID A-A-59588 around all fasteners, nozzles or gaskets that penetrate the hull.
3.7.3 Renew all hoses, thermostats and anodes as applicable.
NOTE
See related work item “Lube Oil Heat Exchangers; Clean, Inspect And
Hydro” so work can be coordinated to minimize loss/renewal of jacket water.
3.7.4 Refill all heat exchanger fluid levels, including all jacket water in all disturbed engines, in accordance with manufacturer and vessel specifications. Prior to recirculation through the engines, the
Contractor must test the jacket water for chloride and nitrite concentrations in accordance with manufacturer recommendations in the presence of the Coast Guard Inspector. Submit a CFR.
3.8 Reinstallation. After completion of testing and all authorized repairs, if any, the Contractor must reinstall each cooler (if previously removed). Where applicable, renew all gaskets, and recessed hex-head bolts in accordance with the manufacturer's specifications. Apply a copper-based anti-seize compound on all bolts, and torque in accordance with manufacturer’s specifications.
3.9 Touch-up preservation. The Contractor must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, (Touch-ups and minor coating repairs.)
3.10 Cleanliness requirement. The Contractor must visually inspect and ensure that all cleaned surfaces are completely free of debris and surface contaminants. Submit a CFR.
CAUTION
Extreme caution must be taken to not exceed manufacturer’s recommended test pressure during hydrostatic testing.
3.11 Pressure test. After all authorized work is complete and prior to reconnecting the heat exchanger(s), the Contractor must pressure test each heat exchanger in accordance with SFLC Std Spec 5000, Appendix
C paragraph C2.7 (Heat exchangers and fluid coolers) using test pressures shown in Table(s) below.
20 (Rev-0)
Ensure no leakage from or permanent deformation of pressure-containing parts by repairing all leaks and discrepancies. Submit a CFR.
TABLE 1: SEAWATER COOLER HYDROSTATIC TEST PRESSURES
COMPONENT SHELL SIDE TEST
PRESSURE (PSI)
TUBE SIDE TEST
PRESSURE (PSI)
Main Diesel Engine 225 113
3.12 Label plates. The Contractor must attach an anodized aluminum test data plate to each heat exchanger using epoxy resin cement. Ensure that each plate is engraved with ¼-inch high letters, stating the following:
• Test pressure.
• Test date.
• Testing facility.
NOTE
If the heat exchanger design makes mounting a test data plate impractical, the
Government reserves the right to request written documentation of the above-listed testing data in lieu of a test data plate, at no additional cost to the
Government.
3.13 Leak test. After completing all authorized mechanical (i.e. threaded, bolted, etc.) joint repairs, the
Contractor must test the heat exchanger system's operation using the system fluid at normal operating pressure.