VA242-17-B-1182-00003000.docx

DOCX document 34 KB Posted

Attached to
CORRECT SAFETY DEFICIENCIES AT LOADING DOCK Federal contract opportunity
Solicitation number
VA24217B1182
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

VA242-17-B-1182 00003 VA242-17-B-1182 00003.docx

View the file

Other files for this federal contract opportunity

Other files attached to CORRECT SAFETY DEFICIENCIES AT LOADING DOCK, newest first.
File Type Posted
VA242-17-B-1182-00004000.docx DOCX document
VA242-17-B-1182-00002000.docx DOCX document
VA242-17-B-1182-00002001.pdf PDF
VA242-17-B-1182-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

15C. DATE

SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE

SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) A 00003 11-30-2017 526-13-108 36C242 Department of Veterans Affairs Network Contracting Office 2 James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx NY 10468-3904 36C242 Department of Veterans Affairs James J. Peters VA Medical Center Network Contracting Office 2 130 West Kingsbridge Road Bronx NY 10468-3904 To all Offerors/Bidders

VA242-17-B-1182

10-30-2017

X X ** HOUR & DATE for Receipt of Offers is 12/7/17 at 3PM EST X This amendment A00003 is for the Correct Safety Deficiencies at Loading Dock, Project 526-13-108, IFB

Solicitation VA242-17-B-1182 at the James J. Peters DVA, 130 W. Kingsbridge Road, Bronx, NY 10478

The sole purpose of this amendment is to provide the following information to bidding contractors:

1. Provide AE responses to remaining RFI's #1 ,2,3,8,12,and 13 not answered in previous amendment.

2. Confirm that all amendments must be acknowledged with bids at bid opening.

3. Confirm that the bid opening date is Thursday, 12/7 at 3PM EST.

Bids may be hand delivered directly to the CO, Patricia Cordero in GC-125. The bid opening will be held at 3PM sharp in the Facility Management Service Center Conference Room, GC-100.

Patricia Cordero

CONTRACT SPECIALIST

Correct Safety Deficiencies at Loading Dock, IFB Solicitation VA242-17-B-1182 Please see AE Responses for previously submitted RFI’s # 1, 2, 3, 8, 12, and 13 below:

RFI 1: Drawing S201 has detail 2/S301 showing reinforcement to the existing loading dock wall. We need to know the extent of the repair. No measurements are provided.

AE Response: Detail 2/S301 depicts the wall returns at each end of the “New Wall Segment” identified on S-201. The total length of each wall return is 2’-0” as noted in detail 1/S301.

RFI 2: Section 4/S301 show bottom reinforcement for the new deck leveler.

1 – Drawings have notes showing it as 4/S201, need clarification.

2 – Along the length of leveler wall it showed to provide cont. galvanized L3x3x1/4. We need details to construct the two side walls.

AE Response: 1. RFI is unclear. No response provided by AE

2. The detail of the side walls in the transverse direction is the same as the section (the detail is the same along all three siders of the dock leveler).

RFI 3: Section 1/S201 indicates compacted fill in between existing and new wall. What is the purpose of this fill? Also is the new wall and top concrete a monolithic pour? If yes then how can contractor place the compacted fill after the pour?

AE Response: The slab and the wall are not monolithic. The wall shall be constructed and then backfilled with compacted stone. The slab can then be placed atop of the wall and backfill.

RFI 8: Please specify what reinforcement is scheduled for the New 8” Thick Concrete Pavement. Plan S303 – Typical Ramp/ Pad shows 4 x 4 W4.0 x W4.0 WWM but the concrete pavement detail does not indicate any reinforcement other than smooth dowels at contraction joints. Please advise what to use for reinforcement in concrete pavement?

AE REPLY: No reinforcement is required by design (refer to “General Note” No. 1A on sheet S001. Dowels are required @ each joint per details on sheet S303

RFI 12: Plan S001 Foundation & Soil Preparation notes – Item 5 – specifies a 6” layer of compacted open graded stone overlaying a 16” min thick layer of structural fill compacted. Plan S303 details referencing concrete pavements, stone and subgrades shows only a “Compacted subgrade”. Please confirm the requirement to install 16” of structural fill under the 6” layer of open graded stone at all concrete pavement locations?

AE REPLY: All concrete pavement shall bear on a 6” layer of open graded stone above a 16” layer of structural fill per “Foundation and Soil Preparation Note” No. 5 on sheet S001.

RFI 13: Reference item 7 above, this affects how much of a cut will be required to install 16” of structural fill at the concrete pavement locations. This is a substantial amount of area and depth (which means a substantial amount of cut fill to be removed off site) and we cannot find anywhere in the plans or specs if the owner has had soils testing completed to as to be able to classify such soils? Please advise.

AE REPLY: Geotechnical information was not provided for design. Contractor will be responsible to provide necessary soil testing and report to verify existing soil.

END OF RFI RESPONSES