CORRECT SAFETY DEFICIENCIES AT LOADING DOCK Federal contract opportunity
Solicitation number
VA24217B1182
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

VA242-17-B-1182 00002 VA242-17-B-1182 00002.docx

View the file

Other files for this federal contract opportunity

Other files attached to CORRECT SAFETY DEFICIENCIES AT LOADING DOCK, newest first.
File Type Posted
VA242-17-B-1182-00004000.docx DOCX document
VA242-17-B-1182-00003000.docx DOCX document
VA242-17-B-1182-00002001.pdf PDF
VA242-17-B-1182-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2.

AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF

CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV.

11/2016) is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITE

M 10A.

15C. DATE

SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR

43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE

SIGNED

14.

DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME

AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS

OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 00002 11-22-2017 526-13-108 36C242 Department of Veterans Affairs Network Contracting Office 2 James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx NY 10468-3904 36C242 Department of Veterans Affairs James J. Peters VA Medical Center Network Contracting Office 130 West Kingsbridge Road Bronx NY 10468-3904 To all Offerors/Bidders

VA242-17-B-1182

10-30-2017

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:

December 7, 2017 at 3PM EST X This amendment A00001 is for the Correct Safety Deficiencies at Loading Dock, Project 526-13-108, IFB

Solicitation VA242-17-B-1182 at the James J. Peters DVA, 130 W. Kingsbridge Road, Bronx, NY 10478

The sole purpose of this amendment is to provide the following to bidding contractors:

1. Provide sign in sheet from site visit conducted on 11/13 at 10:30AM

2. Provide responses to submitted RFI's. All RFI's shown below with "no response" will be responded to in a f inal amendment on 11/30/2017.

These RFI's are awariting AE response.

3. Noti fy bidding contractors that no further RFI's will be accepted for this solicitation.

4. Confirm that all amendments must be acknowledged with bids at bid opening.

5. Notify all contractors that the bid due date is extended to Thursday, 12/7 at 3PM EST in order to respond to RFI’s Patricia Cordero

CONTRACT SPECIALIST

Correct Safety Deficiencies at Loading Dock Contractor RFI’s and VA/AE Responses Please see below RFI’s and VA/AE Responses below:

RFI 1: Drawing S201 has detail 2/S301 showing reinforcement to the existing loading dock wall. We need to know the extent of the repair. No measurements are provided.

VA/AE Response: RFI TO BE RESPONDED TO IN SEPARATE AMENDMENT BY 11/302017 RFI 2: Section 4/S301 show bottom reinforcement for the new deck leveler.

1 – Drawings have notes showing it as 4/S201, need clarification.

2 – Along the length of leveler wall it showed to provide cont. galvanized L3x3x1/4. We need details to construct the two side walls.

VA/AE Response: RFI TO BE RESPONDED TO IN SEPARATE AMENDMENT BY 11/302017 RFI 3: Section 1/S201 indicates compacted fill in between existing and new wall. What is the purpose of this fill? Also is the new wall and top concrete a monolithic pour? If yes then how can contractor place the compacted fill after the pour?

VA/AE Response: RFI TO BE RESPONDED TO IN SEPARATE AMENDMENT BY 11/302017

RFI 4: What are working hours for the replacement of concrete pavement?

VA/AE Response: See Site Phasing notes on drawing CS102. There are numerous phases in order to support the continued operations of the loading dock service for deliveries to the Medical Center.

RFI 5: Please confirm if the thickness of existing/removed concrete pavement is 8" thick?

VA/AE Response: Existing thickness of concrete to be removed is approximately 8-10”.

RFI 6: Plan AE103 Door schedule – Door 05 – is a double acting door shown as a pair of 3/0 x 7/0 doors. The referenced detail 8/AE103 indicated a pair of 4/0 x 7/0 doors. Please advise correct size

VA/AE REPLY: Door 05 is 8’ as per detail.

RFI 7: Please indicate thickness of existing concrete pavement scheduled for removal?

VA/AE RESPONSE: See notes and details in drawing S301.

RFI 8: Please specify what reinforcement is scheduled for the New 8” Thick Concrete Pavement. Plan S303 – Typical Ramp/ Pad shows 4 x 4 W4.0 x W4.0 WWM but the concrete pavement detail does not indicate any reinforcement other than smooth dowels at contraction joints. Please advise what to use for reinforcement in concrete pavement?

VA/AE REPLY: RFI TO BE RESPONDED TO IN SEPARATE AMENDMENT BY 11/302017

RFI 9: Plans AE102 & AE103 indicate existing storage building with existing columns, steel beams and steel trusses which are all scheduled to remain. Detail 1/AE103 states - to apply a 1 hr rated sprayed Fireproofing over all exposed steel framing members including columns, beams & trusses. Please indicate the number of existing steel trusses or please indicate what the existing truss spacing is oc?

VA/AE REPLY: There are 3 trusses.

RFI 10: Please advise if the existing steel decking that is to remain, is to also receive a full coverage of spray fireproofing and to what rating if in fact the decking is to be covered?

VA/AE REPLY: See Note 1 and 6 of drawing AE102

RFI 11: Plan AE103 / Detail 3 – Metal Roof Panel Detail – Indicates existing metal decking with a (new) nailable sheathing and (new) building paper on the sheathing. The metal panels then attach to the nailable sheathing. Question – Please advise what thickness and type of plywood sheathing is required?

VA/AE REPLY: See Metal deck notes in drawing S001.

RFI 12: Plan S001 Foundation & Soil Preparation notes – Item 5 – specifies a 6” layer of compacted open graded stone overlaying a 16” min thick layer of structural fill compacted. Plan S303 details referencing concrete pavements, stone and subgrades shows only a “Compacted subgrade”. Please confirm the requirement to install 16” of structural fill under the 6” layer of open graded stone at all concrete pavement locations?

RFI 13: Reference item 7 above, this affects how much of a cut will be required to install 16” of structural fill at the concrete pavement locations. This is a substantial amount of area and depth (which means a substantial amount of cut fill to be removed off site) and we cannot find anywhere in the plans or specs if the owner has had soils testing completed to as to be able to classify such soils? Please advise

SPECIAL NOTE TO BIDDERS: ALL RFI’S ABOVE THAT DO NOT INDICATE A RESPONSE WILL BE ANSWERED IN SEPARATE AMENDMENT BY 11/30/2017. A FINAL AMENDMENT WILL BE ISSUED TO RESPOND TO THESE RFI’S (#1,2,3,8,12,AND 13) NO LATER THAN 11/30/2017. BIDS WILL BE DUE ON THURSDAY, 12/7 AT 3PM. BID LOCATION IS JAMES J. PETERS VAMC, GC-100 CONFERENCE ROOM.

END OF RFI’S

See attached document: CORRECT SAFETY DEFICIENCIES AT LOADING DOCK_S04_PRE-BID SITE VISIT SIGN IN SHEET-11.13.17.