USDA ARS Athens GA Upgrade Chiller - Final Turnover Drawings 03-01-21.pdf
PDF 9 MB Posted
- Attached to
- Phase 2 of Chiller Replacement Federal contract opportunity
- Solicitation number
- 12405B23Q0315
About this file
This is a solicitation for Phase 2 of a chiller replacement project in Athens, GA. The project scope involves replacing an existing chiller and associated chilled water pumps. The competition is set aside for small businesses, with an applicable NAICS code of 236220. Prospective offerors must complete blocks 14, 15 and 19, and have an active SAM registration. The Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery is the contracting agency. The magnitude of the construction project is between $500,000 and $1,000,000.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wage Determination.pdf | ||
| SOW Chiller Phase 2 RRC Athens GA.docx | DOCX document | |
| Solicitation 12405B23Q0315.docx | DOCX document | |
| Attachment 4 ARS-372.pdf | ||
| USDA ARS Athens GA Upgrade Chiller - Final Turnover Specifications 03-01-21.pdf | ||
| Wage Determination.pdf | ||
| Attachment 3 - ARS-371.pdf | ||
| 12405B23Q0315.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER SHEET
U.S. DEPARTMENT OF AGRICULTURE
AGRICULTURAL RESEARCH SERVICE SOUTHEAST AREA
UPGRADE CHILLERS
ATHENS, GEORGIA
FINAL TURNOVER
JANUARY 28, 2021
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE, SUITE 301
BETHESDA, MARYLAND 20817
(T) 301-216-2871 (F) 301-216-9671 www.SalasObrien.com
KEY PLANVICINITY MAP - ATHENS, GA DRAWING INDEX
DRAWING NUMBER
DRAWING TITLE:
DRAWN BY:
GES PROJECT NO.:
DATE:
REGISTRATION:
REVISIONS:
PROJECT:
SOF
01-28-21
F20-43
SUBMISSIONS:
USDA PROJECT NO.:
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE SUITE 301
BETHESDA, MARYLAND 20817
T: 301.216.2871 (F) 301-216-9671 www.SalasObrien.com
AR EPM:
AGRICULTURAL RESEARCH SERVICES
SOUTHEAST AREA
950 College Station Road
Athens, GA 30605
UPGRADE
CHILLERS
RRC BUILDING
VE
AG-32SD-C-15-0044
1. 95% CD SUBMISSION 11/18/20
2. FINAL TURNOVER 01/28/21
G0.1
DWG TITLE SHEET
G0.1 COVER SHEET 1
M0.1 SYMBOL LEGEND AND GENERAL NOTES - MECHANICAL 2
M2.1 PHASE 1 - DEMO - MECHANICAL 3
M2.2 PHASE 1 - NEW - MECHANICAL 4
M3.1 PHASE 2 - DEMO - MECHANICAL 5
M3.2 PHASE 2 - NEW - MECHANICAL 6
M5.1 CONTROLS - MECHANICAL 7
M5.2 CONTROLS - MECHANICAL 8
M5.3 CONTROLS - MECHANICAL 9
M6.1 SCHEDULES - MECHANICAL 10
M7.1 DETAILS - MECHANICAL 11
M7.2 DETAILS - MECHANICAL 12
E0.1 SYMBOL LEGEND AND GENERAL NOTES - ELECTRICAL 13
E2.1 PHASE 1 - DEMO - ELECTRICAL 14
E2.2 PHASE 1 - NEW - ELECTRICAL 15
E3.1 PHASE 2 - DEMO - ELECTRICAL 16
E3.2 PHASE 2 - NEW - ELECTRICAL 17
E4.1 POWER RISER DIAGRAMS - ELECTRICAL 18
E6.1 SCHEDULES - ELECTRICAL 19
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text
AREA OF WORK
AutoCAD SHX Text
PROJECT SITE
NOTES
1. THIS IS A GENERAL COMPILATION OF SYMBOLS AND NOT ALL SYMBOLS SHOWN MAY BE USED ON THE CONTRACT DRAWINGS.
2. SCREENED SYMBOLS OR TEXT (EXAMPLE: AHU) INDICATE EXISTING EQUIPMENT OR CONDITIONS.
3. SCREENED AND DASHED AND LINES INDICATE LINES HIDDEN IN VIEW.
DUCT SMOKE DETECTOR
THERMOSTAT
TEMPERATURE SENSOR
PIPING
MECHANICAL LEGEND
DESCRIPTION
GENERAL
SYMBOL DESCRIPTIONSYMBOL
EQUIPMENT NUMBER
SECTION NUMBER
TYPE OF EQUIPMENT
DETAIL NUMBER
REFERENCE NOTE
AIR FLOW AMOUNT (CFM)
UNDER CUT DOOR
AIR DEVICE TAG
SHEET SECTION APPEARS
SHEET DETAIL APPEARS
X
X
X
X-X
X
X-X
UC
POINT OF DISCONNECTION
POINT OF CONNECTION
HVAC
DESCRIPTIONSYMBOL
BELL MOUTH TAP W/MVD
SQUARE TO ROUND DUCT TRANSITION
DUCT RISE OR DROP IN DIRECTION OF FLOW
RETURN INLET (SEE AIR DEVICE SCHEDULE)
EXHAUST INLET (SEE AIR DEVICE SCHEDULE)
SUPPLY OUTLET (SEE AIR DEVICE SCHEDULE)
MVD HAS REMOTE CONTROL IN RIGID CEILING
SUPPLY DUCT DOWN
EXHAUST DUCT DOWN
RETURN DUCT DOWN
DUCT CONTINUES
FIRE DAMPER (HORIZONTAL)
DUCT ACCESS DOOR - TOP
MANUAL VOLUME DAMPER
SUPPLY DUCT RISER
RETURN DUCT RISER
EXHAUST DUCT RISER
FLEXIBLE DUCT
SINGLE LINE DUCTWORK
TERMINAL UNIT
MOTORIZED DAMPER
CROSS HATCHED AREA = MINIMUM CLEARANCE
FOR HEATER ACCESS. MAINTAIN CLEARANCE.
FIRE DAMPER (VERTICAL)
BACKDRAFT DAMPER
BDD
MVD
FD
FD
LINEAR DIFFUSER
ELBOW W/TURNING VANES
REFRIGERANT SENSOR
SMOKE DAMPER (HORIZONTAL)SD
SD SMOKE DAMPER (VERTICAL)
COMBINATION FIRE/SMOKE DAMPER (HORIZONTAL)F/SD
F/SD COMBINATION FIRE/SMOKE DAMPER (VERTICAL)
ROTATING BEACON LIGHT
PIPE CONTINUATION
PIPE ELBOW DOWN
PIPE ELBOW UP
BLIND FLANGE
CAPPED LINE
HOSE END CONNECTION
DIRECTION OF FLOW IN PIPE
PIPE TEE DOWN
PIPE TEE UP
UNION
BALL VALVE
BUTTERFLY VALVE (MANUAL)
BUTTERFLY VALVE (MOTORIZED)
GATE VALVE
GLOBE VALVE
TRIPLE DUTY VALVE
PLUG VALVE
2-WAY DDC CONTROL VALVE
3-WAY DDC CONTROL VALVE
BALANCING VALVE WITH PRESSURE TAPS
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
FLOW BALANCING VALVE
MANUAL AIR RELIEF VENT
AUTOMATIC AIR RELIEF VENT
FLEXIBLE CONNECTION
CHECK VALVE
Y-STRAINER
PRESSURE/TEMPERATURE TEST PORT
PRESSURE GAUGE
THERMOMETER
PUMP
BASKET STRAINER W/ CLAMPED COVER
SUCTION DIFFUSER
DUCT-MOUNTED SMOKE DETECTOR
DUCT ACCESS DOOR - BOTTOM
DUCT ACCESS DOOR - SIDE
24x12
24x12Ø
24Ø ROUND DUCT, DIAMETER SHOWN (IN INCHES)
RECTANGULAR DUCT, FIRST FIGURE IS
DIMENSION OF SIDE SHOWN (IN INCHES)
FLAT OVAL DUCT, FIRST FIGURE IS
DIMENSION OF SIDE SHOWN (IN INCHES)
SMOKE DETECTOR A/V ANNUNCIATOR
OS&Y GATE VALVE
BALANCING VALVE
FLOW METER
CS-A
100 CFM
MARK - TYPE OR (INxIN)
AIRFLOW (CFM)
1 D1
OR
SS/12X6
100 CFM
OR
AN
SD
R
T
TS
SD
M
M
M
M
S
SOLENOID CONTROL VALVE
MECHANICAL ABBREVIATIONS
AC
DESCRIPTIONABBREV.
ALTERNATING CURRENT
AFF ABOVE FINISHED FLOOR
AMP AMPERE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATING
AND AIR CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
A/V AUDIBLE/VISUAL
BDD BACKDRAFT DAMPER
BHP BRAKE HORSEPOWER
BLDG BUILDING
BMS BUILDING MANAGEMENT SYSTEM
BTU BRITISH THERMAL UNITS
CFM CUBIC FEET PER MINUTE
CxA COMMISSIONING AGENT
D DEPTH
DB DRY BULB
DC DIRECT CURRENT
DDC DIRECT DIGITAL CONTROL
DEG F DEGREE FAHRENHEIT
DIA DIAMETER
EA EXHAUST AIR, EACH
EAT ENTERING AIR TEMPERATURE
ECM ELECTRICALLY COMMUTATED MOTOR
dB DECIBEL
EFF EFFICIENCY
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
ESP EXTERNAL STATIC PRESSURE
ETC ET CETERA
FD FIRE DAMPER, FLOOR DRAIN
FLA FULL LOAD AMPS
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET
FT-H2O FEET OF WATER
GA GAGE
GAL GALLON
GPM GALLONS PER MINUTE
H HEIGHT
HB HOSE BIBB
H-O-A HAND-OFF-AUTOMATIC
HP HORSEPOWER
HR HOUR
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
HZ HERTZ
IN INCH
IN.W.G. INCHES OF WATER - GAUGE
IPS IRON PIPE SIZE
KW KILOWATT
L LENGTH
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LF LINEAR FEET
MAX MAXIMUM
MBH THOUSAND BTU PER HOUR
MCA MINIMUM CURRENT AMPACITY
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MSS MANUFACTURERS STANDARDIZATION SOCIETY
MVD MANUAL VOLUME DAMPER
N/A NOT APPLICABLE, NONE ASSOCIATED, NONE
AVAILABLE
NC NOISE CRITERIA, NORMALLY CLOSED
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OA OUTDOOR AIR
PH PHASE
PRV PRESS RELIEF VALVE, PRESS REGULATING VALVE
PVC POLYVINYL CHLORIDE
QTY QUANTITY
RA RETURN AIR
RH RELATIVE HUMIDITY
RLA RUNNING LOAD AMPS
RM ROOM
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SD SMOKE DETECTOR
SEER SEASONAL ENERGY EFFICIENCY RATIO
SF SQUARE FEET
SMACNA SHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCIATION
SP STATIC PRESSURE
STD STANDARD
T THERMOSTAT
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UH UNIT HEATER
UL UNDERWRITERS LABORATORIES
UNO UNLESS NOTED OTHERWISE
V VOLTAGE
VA VOLT AMPERE
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
W WATT, WIDTH
WB WET BULB
WWF WELDED WIRE FABRIC
YR YEAR
B BOILER
CH CHILLER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CT COMPRESSION TANK
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
EWT ENTERING WATER TEMPERATURE
FCU FAN COIL UNIT
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
LWT LEAVING WATER TEMPERATURE
NO NUMBER, NORMALLY OPEN
OAT OUTDOOR AIR TEMPERATURE
OZ OUNCE
P PUMP
PPM PARTS PER MILLION
PRESS PRESSURE
PSI POUNDS PER SQUARE INCH
PSI-A POUNDS PER SQUARE INCH - ABSOLUTE
PSI-G POUNDS PER SQUARE INCH - GAUGE
RPZ REDUCED PRESSURE ZONE
GENERAL NOTES
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND
OPERABLE HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) SYSTEMS.
2. THE CONTRACTOR IS EXPECTED TO ORDER MATERIALS IN SUFFICIENT TIME TO AVOID DELAYING THE COMPLETION
OF THE PROJECT. DELAY IN DELIVERIES WILL NOT BE CONSIDERED A JUSTIFIABLE REASON FOR SUBSTITUTION OF
MATERIALS.
3. THE CONTRACTOR SHALL COMPLY WITH THE FOLLOWING CODES:
a. INTERNATIONAL BUILDING CODE 2018 EDITION
b. INTERNATIONAL RESIDENTIAL CODE 2018 EDITION
c. INTERNATIONAL PLUMBING CODE 2018 EDITION
d. INTERNATIONAL MECHANICAL CODE 2018 EDITION
e. INTERNATIONAL FUEL GAS CODE 2018 EDITION
f. INTERNATIONAL ENERGY CONSERVATION CODE 2015 EDITION
g. INTERNATIONAL FIRE CODE 2018 EDITION
h. NATIONAL ELECTRICAL CODE 2017 EDITION
4. ALL REQUESTS FOR INFORMATION (RFI'S) SUBMITTED BY THE CONTRACTOR SHALL INCLUDE A PROPOSED
SOLUTION.
5. INSTALLATION OF EQUIPMENT SHALL COMPLY WITH EQUIPMENT MANUFACTURER'S INSTALLATION AND CLEARANCE
REQUIREMENTS. THE CONTRACTOR SHALL VERIFY INSTALLATION CLEARANCES WILL BE MAINTAINED AND
DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER PRIOR TO THE ACQUISITION OF EQUIPMENT.
6. THE GENERAL CONTRACTOR SHALL COORDINATE THE WORK OF THE DIFFERENT TRADES SO THAT INTERFERENCE
BETWEEN HVAC, PIPING, EQUIPMENT, STRUCTURAL, AND ELECTRICAL WORK WILL BE AVOIDED. ALL NECESSARY
OFFSETS AND FITTINGS REQUIRED TO INSTALL THE WORK PROPERLY SHALL BE PROVIDED COMPLETE IN PLACE AT
NO ADDITIONAL COST TO THE DESIGN TEAM OR OWNER.
7. THE CONTRACTOR IS RESPONSIBLE TO REPAIR, AT HIS COST, ANY DAMAGED ITEMS DUE TO WORK PERFORMED.
DAMAGED ITEMS SHALL BE BROUGHT BACK TO LIKE-NEW CONDITION OR REPLACED WITH ORIGINAL.
8. PIPING AND EQUIPMENT LOCATIONS SHOWN ARE SCHEMATIC. PRIOR TO LAYOUT AND CONSTRUCTION OF THE
MECHANICAL SYSTEMS, THE CONTRACTOR SHALL SUBMIT LAYOUT AND FABRICATION SHOP DRAWINGS FOR
APPROVAL. CONTRACTOR SHALL NOT COMMENCE WORK WITHOUT APPROVED SHOP DRAWINGS ON THE
CONSTRUCTION SITE.
9. INSULATE ALL SURFACES SUBJECT TO CONDENSATION. IN ADDITION TO PIPES AND APPURTENANCES, THIS
INCLUDES SURFACES OF THE CHILLER WHICH MAY REQUIRE FLEXIBLE ELASTOMERIC INSULATION.
10. PROVIDE COLD GALVANIZED PAINT ON ALL FIELD CUTS/WELDS OF GALVANIZED STEEL SUPPORTS AND THREADED
RODS.
11. ALL ELECTRICAL WORK SHALL CONFORM TO THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE (NFPA 70).
THE EQUIPMENT INDICATED ON THE DRAWINGS HAS BEEN COORDINATED WITH THE ELECTRICAL SYSTEMS. IF THIS
CONTRACTOR SELECTS TO USE ALTERNATE EQUIPMENT, HE SHALL BE RESPONSIBLE FOR ALL COORDINATION
WITH THE ELECTRICAL ENGINEER AND SHALL BEAR ANY ADDED EXPENSE TO THE ELECTRICAL CONTRACTOR AND
CONSULTANTS RESULTING FROM SUCH ALTERNATE SELECTION.
GENERAL PHASING NOTES
1. THE CONTRACT DOCUMENTS ARE DIVIDED INTO 2 PHASES. IN ADDITION TO THE MECHANICAL CONTRACTOR'S
SCOPE, WORK WILL BE REQUIRED BY THE CONTROLS CONTRACTOR AND TEST AND BALANCE CONTRACTOR IN
BOTH PHASES.
2. THIS PROJECT OCCURS IN AN EXISTING FACILITY THAT SHALL REMAIN IN OPERATION DURING CONSTRUCTION.
COORDINATION OF ALL WORK WITH THE OWNER SHALL BE REQUIRED. OUTAGES OF SHORT DURATION WILL BE
ALLOWED AT THE SOLE DIRECTION OF THE OWNER. THE CONNECTION TO THE EXISTING CHILLED WATER PIPING
SHALL USE LINE-STOPS WITH BYPASSES TO MINIMIZE, IF NOT COMPLETELY ELIMINATE, THE DISRUPTION OF
CHILLED WATER PRODUCTION TO THE BUILDINGS SERVED BY THE CENTRAL PLANT.
3. THE CONTRACTOR SHALL INCLUDE THE USE OF A TEMPORARY AIR-COOLED CHILLER AND PUMPING PACKAGE TO
PROVIDE CHILLED WATER TO THE BUILDING WHILE THE CENTRAL COOLING PLANT IS OUT OF SERVICE. THE
MINIMUM REQUIREMENTS FOR THE TEMPORARY EQUIPMENT IS LISTED AS FOLLOWS:
a. CAPACITY: 800 TONS
b. FLOW: 1,920
c. PUMP HEAD: 70 FT-H20
d. POWER: 460V/3PH/60HZ
4. THE MECHANICAL WORK ASSOCIATED WITH THESE PHASES IS DETAILED AND SUMMARIZED ON SHEETS M2.1, M2.2, M3.1, AND M3.2. A GENERAL SUMMARY OF THE MECHANICAL PORTION OF THE PHASING IS AS FOLLOWS:
a. PHASE 1: IN GENERAL, THE MECHANICAL SCOPE IS AS FOLLOWS:
1) REPLACE THE COOLING TOWERS.
2) REPLACE CONDENSER WATER PIPING AND ADD COOLING TOWER BYPASS PIPES AT THE COOLING TOWERS.
3) RELOCATE AND REPLACE CONDENSER WATER PUMPS.
4) PREPARE PLANT FOR FUTURE PHASES.
5) REFER TO E-SHEETS FOR ELECTRICAL MODIFICATIONS ASSOCIATED WITH PHASE 1.
b. PHASE 2: IN GENERAL, THE MECHANICAL SCOPE IS AS FOLLOWS:
1) REPLACE CHILLER CH-2 AND PUMP CHWP-2.
2) REFER TO E-SHEETS FOR ELECTRICAL MODIFICATIONS ASSOCIATED WITH PHASE 2.
GENERAL DEMOLITION AND RENOVATION NOTES
1. THE CONTRACTOR SHALL COORDINATE THE LOCATION OF SITE MOBILIZATION WITH THE OWNER PRIOR TO
COMMENCING THE WORK.
2. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION OF EXISTING MECHANICAL
SYSTEMS AS REQUIRED TO PERFORM NEW MECHANICAL WORK. NOTHING TAKEN OUT OF SERVICE UNDER THIS
PROJECT SHALL BE ABANDONED IN PLACE. ALL DEBRIS SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND
BE REMOVED FROM THE SITE.
3. THE CONTRACTOR SHALL MAINTAIN AREAS NOT DIRECTLY IMPACTED BY THE WORK DUST-FREE DURING THE LIFE
OF THE PROJECT. THE CONTRACTOR SHALL PROVIDE ALL DUST CONTROL/PREVENTION SYSTEMS AS REQUIRED TO
COMPLETE DEMOLITION, CONSTRUCTION, AND INSTALLATION OF NEW SYSTEMS. THE CONTRACTOR SHALL CLEAN
UP NIGHTLY SO AS NOT TO IMPACT THE BUILDING'S EMPLOYEES DURING THE WORK WEEK.
GENERAL NOTES
RMS REFRIGERANT MONITORING SYSTEM
M0.1
SYMBOL LEGEND
AND GENERAL
NOTES -
MECHANICAL
DRAWING NUMBER
DRAWING TITLE:
DRAWN BY:
GES PROJECT NO.:
DATE:
REGISTRATION:
REVISIONS:
PROJECT:
SOF
01-28-21
F20-43
SUBMISSIONS:
USDA PROJECT NO.:
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE SUITE 301
BETHESDA, MARYLAND 20817
T: 301.216.2871 (F) 301-216-9671 www.SalasObrien.com
AR EPM:
AGRICULTURAL RESEARCH SERVICES
SOUTHEAST AREA
950 College Station Road
Athens, GA 30605
UPGRADE
CHILLERS
RRC BUILDING
VE
AG-32SD-C-15-0044
1. 95% CD SUBMISSION 11/18/20
2. FINAL TURNOVER 01/28/21
AutoCAD SHX Text
DROP
RISE
X9 X10 X11 X12X8
XA
XB
XC
XE
X7X6
D2
CWP
CH
CT
D5
D2
D2
D1
CHWP
1. IN GENERAL, THE MECHANICAL SCOPE OF PHASE 1 IS AS FOLLOWS:
a. CHILLED WATER SHALL BE PROVIDED TO THE DISTRIBUTION SYSTEM
UNINTERRUPTED THROUGHOUT CONSTRUCTION.
b. INSTALL LINE-STOPS WITH BYPASSES TO KEEP PLANT OPERATIONAL
DURING CONSTRUCTION.
c. INSTALL PLANT ISOLATION VALVES AND TAPS FOR A TEMPORARY CHILLER
CONNECTION.
d. PROVIDE AN AIR-COOLED CHILLER AND PUMP PACKAGE TO PROVIDE
CHILLED WATER WHILE THE PLANT IS OUT OF SERVICE.
e. REPLACE THE COOLING TOWERS.
f. REPLACE CONDENSER WATER PIPING AND ADD COOLING TOWER BYPASS
PIPES AT THE COOLING TOWERS.
g. RELOCATE AND REPLACE CONDENSER WATER PUMPS.
h. MODIFY CONDENSER WATER PIPING CONNECTIONS AT CH-2.
i. PRESSURE TEST AND CLEAN ALL NEW PIPING BEFORE WATER IS
ALLOWED TO CIRCULATE THROUGH THE SYSTEM.
j. ADD ISOLATION VALVES IN THE CHILLED WATER PIPE TO MINIMIZE PLANT
DOWNTIME DURING FUTURE WORK .
k. COORDINATE CHEMICAL TREATMENT EQUIPMENT MODIFICATIONS FOR
THE COOLING TOWER WITH THE EXISTING CHEMICAL PROVIDER.
l. TEST AND BALANCE PER THE PHASE 1 SCOPE OUTLINED IN THE
SPECIFICATIONS.
m. UPDATE CONTROLS AND SEQUENCES FOR THE INTEGRATION OF THE
REPLACEMENT EQUIPMENT.
2. THE CHEMICAL TREATMENT SYSTEM IS NOT BEING MODIFIED AS PART OF
THIS PROJECT. THE INTENT IS TO DISCONNECT AND RECONNECT.
COORDINATE WITH THE OWNER'S CHEMICAL VENDOR TO MANAGE THE
CHEMICALS DURING THE CONSTRUCTION PROCESS. USE ONLY CLEANING
AND FLUSHING AGENTS APPROVED BY THE CHEMICAL VENDOR. THE
MECHANICAL CONTRACTOR SHALL PROVIDE AND INSTALL THREAD-O-LET
TAPS IN THE NEW PIPING FOR ALL REQUIRED CHEMICAL TREATMENT
CONNECTIONS.
GENERAL NOTES - PHASE 1
REFERENCE NOTES - PHASE 1 - DEMO
D1
INSTALL LINE-STOPS WITH BYPASSES TO KEEP PLANT OPERATIONAL
DURING CONSTRUCTION. INSTALL NEW 10-INCH DIAMETER PIPE AND TEE
IN BETWEEN LINE-STOPS WITH 10-INCH DIAMETER LUG-STYLE BUTTERFLY
ISOLATION VALVE FACING DOWN. INSTALL A MANUAL OPERATOR ON THE
LINE STOP VALVE ON THE CHILLER-SIDE AND USE THIS AS A MEANS TO
ISOLATE THE CHILLERS FROM THE BUILDING DISTRIBUTION SYSTEM. USE
THE NEW TEE CONNECTIONS TO PIPE IN CHILLED WATER FROM A
TEMPORARY AIR-COOLED CHILLER WITH PUMP PACKAGE.
DISCONNECT PIPING AND PREPARE FOR CONNECTION OF NEW.
THE EXISTING REFRIGERANT MONITORING SYSTEM SHALL REMAIN IN
SERVICE.
DEMOLISH PUMP AND HOUSEKEEPING PAD. GRIND FLOOR AND PATCH
FLOOR SMOOTH AND LEVEL TO MATCH ADJACENT FLOOR. PREP AND
APPLY EPOXY FINISH TO FLOOR TO MATCH EXISTING FLOOR COATING.
DEMOLISH COOLING TOWER, ACCESS PLATFORMS, AND MISCELLANEOUS
SUPPORT STEEL. CONCRETE SUPPORTS WALLS SHALL REMAIN AND BE
PROTECTED DURING THE CONSTRUCTION PROCESS.
· DISCONNECT MAKE-UP WATER CONNECTION AND PREPARE FOR
CONNECTION TO NEW TOWER.
· EXISTING DRAIN PIPE BELOW TOWER IS TO REMAIN AND BE REUSED.
D2
D3
D4
D5
D3
D4
CWP
D4
D2
D2
D1
12" UNDERGROUND CWS
PIPE EXISTING-TO-REMAIN
EXISTING AIR
COMPRESSOR
A/C/ EQUIPMENT ROOM
BOILER ROOM
ELECTRICAL ROOM
OFFICE/CONTROL ROOM
GENERATOR ROOM
D2
CHWP
D2
D2
D2
CH
M2.1
PHASE 1 - DEMO -
MECHANICAL
DRAWING NUMBER
DRAWING TITLE:
DRAWN BY:
GES PROJECT NO.:
DATE:
REGISTRATION:
REVISIONS:
PROJECT:
SOF
01-28-21
F20-43
SUBMISSIONS:
USDA PROJECT NO.:
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE SUITE 301
BETHESDA, MARYLAND 20817
T: 301.216.2871 (F) 301-216-9671 www.SalasObrien.com
AR EPM:
AGRICULTURAL RESEARCH SERVICES
SOUTHEAST AREA
950 College Station Road
Athens, GA 30605
UPGRADE
CHILLERS
RRC BUILDING
VE
AG-32SD-C-15-0044
1. 95% CD SUBMISSION 11/18/20
2. FINAL TURNOVER 01/28/21
0' 8'2' 4'
GRAPHIC SCALE
1/8"=1'-0"
M2.1
PHASE 1 - DEMO - MECHANICAL
1/8"=1'-0"
XB
XC
XE
X7X6
CH
GENERAL NOTES - PHASE 1
REFERENCE NOTES - PHASE 1 - NEW
INSTALL BLIND FLANGES ON NEW EMERGENCY CHILLED WATER
CONNECTIONS AND INSULATE AND JACKET AFTER TEMPORARY CHILLER
IS DISCONNECTED.
CONNECT NEW PIPING TO EXISTING.
NEW PUMP ON INERTIA PAD SECURED TO NEW CONCRETE
HOUSEKEEPING PAD. COORDINATE HOUSEKEEPING PAD HEIGHT TO
ALIGN SUCTION DIFFUSER PIPE CONNECTION WITH INCOMING
CONDENSER WATER SUPPLY PIPE ELEVATION.
NEW COOLING TOWER, ACCESS PLATFORMS, AND MISCELLANEOUS
SUPPORT STEEL.
· CONNECT MAKE-UP WATER TO EXISTING CONNECTION.
· ROUTE OVERFLOW PIPING AND COOLING TOWER DRAIN PIPING TO
EXISTING DRAIN RISER BELOW TOWER.
BASKET STRAINER WITH CLAMPED COVER AND ISOLATION VALVES
SUPPORTED BY NEW CONCRETE HOUSEKEEPING SLAB BELOW. REFER TO
DETAIL ON M7.1 FOR MORE INFORMATION.
COOLING TOWER BYPASS PIPE TERMINATED INDIRECTLY INTO COOLING
TOWER BASIN. PIPE SHALL TERMINATE 6-INCHES ABOVE TOP LIP OF BASIN
IN ORDER TO MAINTAIN AN AIR GAP.
INSTALL A BALANCING VALVE AT EACH CONDENSER WATER RETURN
COOLING TOWER CONNECTION.
NEW TEE WITH 10-INCH-DIAMETER LUG STYLE ISOLATION VALVE FOR
FUTURE CHILLER 1 REPLACEMENT. INSTALL A BLIND FLANGE AND
INSULATE AND JACKET.
INSTALL NEW 12-INCH DIAMETER ISOLATION VALVE COORDINATED WITH
THE LOCATION FOR THE FUTURE NEW CHILLER AND ROUTE NEW,
TEMPORARY, 8-INCH DIAMETER PIPING TO EXISTING CHILLER. THIS
TEMPORARY PIPING WILL BE REPLACED WITH NEW 12-INCH DIAMETER
PIPING AND ACCESSORIES IN PHASE 2. EXISTING PIPE APPURTENANCES
CAN BE SALVAGED AND REUSED FOR THE TEMPORARY PIPING BUT THE
FINAL INSTALLATION SHALL HAVE ALL NEW PIPE APPURTENANCES.
GENERAL LOCATION OF PUMP VFD, COORDINATE EXACT LOCATION WITH
ELECTRICAL DRAWINGS TO ENSURE PROPER CLEARANCES ARE
MAINTAINED. DIV 23 CONTRACTOR SHALL PROVIDE AND MOUNT THE VFD,
THE DIV 26 CONTRACTOR SHALL INSTALL THE VFD.
THE EXISTING STARTERS ARE BEING DEMOLISHED AS PART OF THE
PHASE 1 ELECTRICAL WORK. THE NEW VFD SHALL BE SIZED FOR FUTURE
PUMP INSTALLATION BUT BALANCED TO OPERATE AT CONSTANT SPEED
TO PROVIDE THE REQUIRED CHILLED WATER FLOW FOR THE EXISTING
CHILLER SERVED. THE VFD WILL BE REBALANCED WHEN THE NEW PUMPS
ARE INSTALLED IN THE FUTURE.
COORDINATE MOUNTING OF VFD TO ENSURE PROPER CLEARANCES WILL
BE MAINTAINED WITH THE EXISTING PUMP, AND THE LOCATION OF THE
NEW PUMP TO BE INSTALLED PHASE 2.
NEW 10-INCH-DIAMETER BUTTERFLY ISOLATION VALVE.
NEW 12-INCH-DIAMETER BUTTERFLY ISOLATION VALVE.
CWP
CWP
CT
CT
8"
12"
12"
12"
12"
12"
10"
M V
MV
MV
M V
SERVICE LADDER WITH SAFETY
CAGE TO TOP PLATFORM
SAFETY RAIL ON
TOP ALL AROUND
COOLING TOWER CT-1
PACKAGED CONTROLLER
COOLING TOWER CT-2
PACKAGED CONTROLLER
12" UNDERGROUND CWS
PIPE EXISTING-TO-REMAIN
12"
12"
EXISTING AIR
COMPRESSOR
A/C/ EQUIPMENT ROOM
BOILER ROOM
ELECTRICAL ROOM
OFFICE/CONTROL ROOM
GENERATOR ROOM
(TYP 4)
EXISTING CONCRETE
SUPPORT WALL
NEW W12x50 GALVANIZED
STEEL SUPPORT (TYP 2)
REFER TO COOLING TOWER MANUFACTURER'S INSTALLATION
INSTRUCTIONS FOR SUPPORT LOCATION AND SPACING
COOLING TOWER OUTLINE
ENLARGED DETAIL AREA
3/4" DIA HILTI EPOXY ANCHOR
WITH 8-INCH EMBED (TYP 2)
EQUAL
EXISTING CONCRETE
SUPPORT WALL
NEW W12x50 COOLING
TOWER SUPPORT BEAM
MINIMUM 9-INCH OVERHANG
2 SIDES
NEW PLATE 1/2"x8"x16"
1/4
ALL STEEL SHALL
BE GALVANIZED
CL
REFER TO COOLING TOWER
MANUFACTURER'S INSTALLATION
INSTRUCTIONS FOR ATTACHMENT
REQUIREMENTS
EXISTING CONCRETE
SUPPORT WALL
1. IN GENERAL, THE MECHANICAL SCOPE OF PHASE 1 IS AS FOLLOWS:
a. CHILLED WATER SHALL BE PROVIDED TO THE DISTRIBUTION SYSTEM
UNINTERRUPTED THROUGHOUT CONSTRUCTION.
b. INSTALL LINE-STOPS WITH BYPASSES TO KEEP PLANT OPERATIONAL
DURING CONSTRUCTION.
c. INSTALL PLANT ISOLATION VALVES AND TAPS FOR A TEMPORARY CHILLER
CONNECTION.
d. PROVIDE AN AIR-COOLED CHILLER AND PUMP PACKAGE TO PROVIDE
CHILLED WATER WHILE THE PLANT IS OUT OF SERVICE.
e. REPLACE THE COOLING TOWERS.
f. REPLACE CONDENSER WATER PIPING AND ADD COOLING TOWER BYPASS
PIPES AT THE COOLING TOWERS.
g. RELOCATE AND REPLACE CONDENSER WATER PUMPS.
h. MODIFY CONDENSER WATER PIPING CONNECTIONS AT CH-2.
i. ADD ISOLATION VALVES IN THE CHILLED WATER PIPE TO MINIMIZE PLANT
DOWNTIME DURING FUTURE WORK .
j. PRESSURE TEST AND CLEAN ALL NEW PIPING BEFORE WATER IS
ALLOWED TO CIRCULATE THROUGH THE SYSTEM.
k. COORDINATE CHEMICAL TREATMENT EQUIPMENT MODIFICATIONS FOR
THE COOLING TOWER WITH THE EXISTING CHEMICAL PROVIDER.
l. TEST AND BALANCE PER THE PHASE 1 SCOPE OUTLINED IN THE
SPECIFICATIONS.
m. UPDATE CONTROLS AND SEQUENCES FOR THE INTEGRATION OF THE
REPLACEMENT EQUIPMENT.
2. THE CHEMICAL TREATMENT SYSTEM IS NOT BEING MODIFIED AS PART OF
THIS PROJECT. THE INTENT IS TO DISCONNECT AND RECONNECT.
COORDINATE WITH THE OWNER'S CHEMICAL VENDOR TO MANAGE THE
CHEMICALS DURING THE CONSTRUCTION PROCESS. USE ONLY CLEANING
AND FLUSHING AGENTS APPROVED BY THE CHEMICAL VENDOR. THE
MECHANICAL CONTRACTOR SHALL PROVIDE AND INSTALL THREAD-O-LET
TAPS IN THE NEW PIPING FOR ALL REQUIRED CHEMICAL TREATMENT
CONNECTIONS.
CHWP
V F
D V
F D
V F
D V
F D
V F
D V
F D
V F
D
V F
D
CH
CHWP
M2.2
PHASE 1 - NEW -
MECHANICAL
DRAWING NUMBER
DRAWING TITLE:
DRAWN BY:
GES PROJECT NO.:
DATE:
REGISTRATION:
REVISIONS:
PROJECT:
SOF
01-28-21
F20-43
SUBMISSIONS:
USDA PROJECT NO.:
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE SUITE 301
BETHESDA, MARYLAND 20817
T: 301.216.2871 (F) 301-216-9671 www.SalasObrien.com
AR EPM:
AGRICULTURAL RESEARCH SERVICES
SOUTHEAST AREA
950 College Station Road
Athens, GA 30605
UPGRADE
CHILLERS
RRC BUILDING
VE
AG-32SD-C-15-0044
1. 95% CD SUBMISSION 11/18/20
2. FINAL TURNOVER 01/28/21
0' 8'2' 4'
GRAPHIC SCALE
1/8"=1'-0"
M2.2
PHASE 1 - NEW - MECHANICAL
XB
XC
XE
X7X6 X9 X10 X11 X12X8
XA
XB
XC
XE
X7X6
CH
D5
D4
D2
CWP
CWP
CT
CT
8"
12"
12"
12"
12"
10"
M V
MV
MV
M V
12" UNDERGROUND CWS
PIPE EXISTING-TO-REMAIN
12"
12"
EXISTING AIR
COMPRESSOR
A/C/ EQUIPMENT ROOM
BOILER ROOM
ELECTRICAL ROOM
OFFICE/CONTROL ROOM
GENERATOR ROOM
REFERENCE NOTES - PHASE 2 - DEMO
D1
DISCONNECT PIPING AND PREPARE FOR CONNECTION OF NEW.
DEMOLISH CH-2 REFRIGERANT RELIEF DISCHARGE PIPE AND PATCH HOLE
IN EXTERIOR WALL WITH 18 GA GALVANIZED STEEL SHEET METAL PATCH.
PATCH SHALL BE LOCATED ON THE EXTERIOR SECURED AND SEALED
WEATHER-TIGHT. COAT PATCH METAL WITH 2 COATS OF GALVANIZING
PRIMER AND PAINT TO MATCH BUILDING EXTERIOR.
THE EXISTING REFRIGERANT MONITORING SYSTEM SHALL REMAIN IN
SERVICE TO MONITOR FOR LEAKS FROM CHILLER CH-1.
DEMOLISH PUMP AND HOUSEKEEPING PAD. GRIND FLOOR AND PATCH
FLOOR SMOOTH AND LEVEL TO MATCH ADJACENT FLOOR. PREP AND
APPLY EPOXY FINISH TO FLOOR TO MATCH EXISTING FLOOR COATING.
DEMOLISH CHILLER CH-2 AND PATCH HOLES AND IMPERFECTIONS IN
HOUSEKEEPING PAD.
D2
D3
D4
D5
D3
1. IN GENERAL, THE MECHANICAL SCOPE OF PHASE 2 IS AS FOLLOWS:
a. CHILLED WATER SHALL BE PROVIDED TO THE DISTRIBUTION SYSTEM
UNINTERRUPTED THROUGHOUT CONSTRUCTION.
b. PROVIDE AN AIR-COOLED CHILLER AND PUMP PACKAGE ON SITE AND
READY FOR CONNECTION SHOULD CHILLER 1 FAIL TO PROVIDE ADEQUATE
CHILLED WATER TO THE DISTRIBUTION SYSTEM.
c. ISOLATE THE PIPING SERVING CH-2 TO ALLOW FOR THE DEMOLITION AND
REPLACEMENT OF THE CHILLER AND CHILLED WATER PUMP WITHOUT
DISRUPTING THE OPERATION OF THE PLANT.
d. REPLACE CHILLER CH-2 AND PUMP CHWP-2.
e. ADD CHEMICAL SHOT FEEDER TO CHILLED WATER SYSTEM.
f. REPLACE CONDENSER WATER PIPING BETWEEN CHILLER CH-2 AND
ISOLATION VALVES WITH 12-INCH DIAMETER PIPE AND NEW
APPURTENANCES AND CONTROLS.
g. PRESSURE TEST AND CLEAN ALL NEW PIPING BEFORE APPLYING
INSULATION AND BEFORE WATER IS ALLOWED TO CIRCULATE THROUGH
THE SYSTEM.
h. TEST AND BALANCE PER THE PHASE 2 SCOPE OUTLINED IN THE
SPECIFICATIONS.
i. UPDATE CONTROLS AND SEQUENCES FOR THE INTEGRATION OF THE
REPLACEMENT EQUIPMENT.
GENERAL NOTES - PHASE 2
D1
CHWP
D1
D1
V F
D V
F D
V F
D V
F D
CHWP
CH
M3.1
PHASE 2 - DEMO -
MECHANICAL
DRAWING NUMBER
DRAWING TITLE:
DRAWN BY:
GES PROJECT NO.:
DATE:
REGISTRATION:
REVISIONS:
PROJECT:
SOF
01-28-21
F20-43
SUBMISSIONS:
USDA PROJECT NO.:
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE SUITE 301
BETHESDA, MARYLAND 20817
T: 301.216.2871 (F) 301-216-9671 www.SalasObrien.com
AR EPM:
AGRICULTURAL RESEARCH SERVICES
SOUTHEAST AREA
950 College Station Road
Athens, GA 30605
UPGRADE
CHILLERS
RRC BUILDING
VE
AG-32SD-C-15-0044
1. 95% CD SUBMISSION 11/18/20
2. FINAL TURNOVER 01/28/21
0' 8'2' 4'
GRAPHIC SCALE
1/8"=1'-0"
M3.1
PHASE 2 - DEMO - MECHANICAL
XB
XC
XE
X7X6
CH
CH
CWP
CWP
CHWP
CT
CT
8"
10"
12"
12"
12"
12"
10"
8"
M V
MV
MV
M V
12" UNDERGROUND CWS
PIPE EXISTING-TO-REMAIN
12"
12"
EXISTING AIR
COMPRESSOR
A/C/ EQUIPMENT ROOM
BOILER ROOM
ELECTRICAL ROOM
OFFICE/CONTROL ROOM
GENERATOR ROOM
REFERENCE NOTES - PHASE 2 - NEW
CONNECT NEW 12-INCH DIAMETER PIPES FROM EXISTING 12-INCH
DIAMETER ISOLATION VALVE INSTALLED IN PHASE 1. INSTALL ALL NEW
PIPE ACCESSORIES IN NEW SECTION OF PIPE.
CONNECT NEW PIPING TO EXISTING.
NEW CHILLER HOUSEKEEPING PAD EXTENSION COORDINATED WITH NEW
CHILLER DIMENSIONS. REFER TO DETAILS ON M7.1 FOR HOUSEKEEPING
PAD EXTENSION REQUIREMENTS.
NEW CHILLER CH-2 SECURED TO HOUSEKEEPING PAD.
NEW PUMP ON INERTIA PAD SECURED TO NEW HOUSEKEEPING PAD.
NEW REFRIGERANT MONITORING SYSTEM (RMS) CONTROLLER INSTALLED
ON THE WALL NEXT TO THE EXISTING RMS CONTROLLER.
NEW CH-2 REFRIGERANT RELIEF DISCHARGE PIPE TERMINATED AS HIGH
ON WALL AS POSSIBLE. TERMINATE PIPE INSIDE A WALL-CAP WITH BIRD
SCREEN. PRIME AND PAINT WALL CAP TO MATCH BUILDING EXTERIOR.
REFER TO DETAIL ON M7.1 FOR MORE INFORMATION.
MAINTAIN THE SPACE BETWEEN THE CHILLERS FREE OF OBSTRUCTIONS
TO ALLOW FOR TUBE ACCESS AND CLEANING.
THE INTENT IS FOR THE FUTURE NEW CHILLER TO BE INSTALLED TO
SHARE THE ACCESS SPACE BETWEEN THE CHILLERS FOR TUBE ACCESS
AND CLEANING.
ADJUST THE VFD SPEED TO ACCOMMODATE THE NEW PUMP AND FLOW
RATE AS PART OF THE PHASE 2 TESTING AND BALANCING.
GENERAL NOTES - PHASE 2
1. IN GENERAL, THE MECHANICAL SCOPE OF PHASE 2 IS AS FOLLOWS:
a. CHILLED WATER SHALL BE PROVIDED TO THE DISTRIBUTION SYSTEM
UNINTERRUPTED THROUGHOUT CONSTRUCTION.
b. PROVIDE AN AIR-COOLED CHILLER AND PUMP PACKAGE ON SITE AND
READY FOR CONNECTION SHOULD CHILLER 1 FAIL TO PROVIDE ADEQUATE
CHILLED WATER TO THE DISTRIBUTION SYSTEM.
c. ISOLATE THE PIPING SERVING CH-2 TO ALLOW FOR THE DEMOLITION AND
REPLACEMENT OF THE CHILLER AND CHILLED WATER PUMP WITHOUT
DISRUPTING THE OPERATION OF THE PLANT.
d. REPLACE CHILLER CH-2 AND PUMP CHWP-2.
e. ADD CHEMICAL SHOT FEEDER TO CHILLED WATER SYSTEM.
f. REPLACE CONDENSER WATER PIPING BETWEEN CHILLER CH-2 AND
ISOLATION VALVES WITH 12-INCH DIAMETER PIPE AND NEW
APPURTENANCES AND CONTROLS.
g. PRESSURE TEST AND CLEAN ALL NEW PIPING BEFORE APPLYING
INSULATION AND BEFORE WATER IS ALLOWED TO CIRCULATE THROUGH
THE SYSTEM.
h. TEST AND BALANCE PER THE PHASE 2 SCOPE OUTLINED IN THE
SPECIFICATIONS.
i. UPDATE CONTROLS AND SEQUENCES FOR THE INTEGRATION OF THE
REPLACEMENT EQUIPMENT.
CHWP
V F
D V
F D
V F
D V
F D
M3.2
PHASE 2 - NEW -
MECHANICAL
DRAWING NUMBER
DRAWING TITLE:
DRAWN BY:
GES PROJECT NO.:
DATE:
REGISTRATION:
REVISIONS:
PROJECT:
SOF
01-28-21
F20-43
SUBMISSIONS:
USDA PROJECT NO.:
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE SUITE 301
BETHESDA, MARYLAND 20817
T: 301.216.2871 (F) 301-216-9671 www.SalasObrien.com
AR EPM:
AGRICULTURAL RESEARCH SERVICES
SOUTHEAST AREA
950 College Station Road
Athens, GA 30605
UPGRADE
CHILLERS
RRC BUILDING
VE
AG-32SD-C-15-0044
1. 95% CD SUBMISSION 11/18/20
2. FINAL TURNOVER 01/28/21
0' 8'2' 4'
GRAPHIC SCALE
1/8"=1'-0"
M3.2
PHASE 2 - NEW - MECHANICAL
CONTROL SYSTEM GENERAL NOTES
1. THIS PROJECT OCCURS IN AN EXISTING BUILDING WITH AN EXISTING CONTROL SYSTEM. THE NEW
SYSTEMS (CHILLER, COOLING TOWER, PUMPS, VFD'S, ETC.) ARE TO BE INCORPORATED INTO THE
EXISTING SYSTEM.
2. EXISTING CONTROL SYSTEM MANUFACTURER: AUTOMATED LOGIC
3. THE DDC SYSTEM SHALL PROVIDE FOR GLOBAL CONTROL AND MONITORING OF THE INDIVIDUAL
ITEMS OF EQUIPMENT. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR
REQUIRED TO INSTALL A COMPLETE FUNCTIONING AND OPERABLE DDC SYSTEM.
4. THE INTENT OF THESE CONTROL SHEETS IS TO PROVIDE A GENERAL SCOPE. IT IS NOT THE INTENT
OF THESE SHEETS TO SPECIFICALLY LIST EVERY CONTROL POINT REQUIRED BY THIS PROJECT.
POINTS LISTED ONCE ON THESE SHEETS MAY BE REQUIRED MULTIPLE TIMES BY THIS PROJECT
DEPENDING ON HOW MANY PIECES OF A PARTICULAR PIECE OF EQUIPMENT IS REQUIRED FOR
THIS PROJECT.
5. THE WORK SHALL INCLUDE, BUT NOT BE LIMITED TO, THE FOLLOWING:
a. MICROPROCESSOR BASED CONTROLLERS
b. PANELS
c. ROUTERS AND COMMUNICATION
d. SWITCHES
e. WIRING AND CONDUIT
f. SENSORS, INSTRUMENTATION, WELLS, ACTUATORS, CONTROL VALVES, CONTROL DAMPERS, ETC.
g. SOFTWARE OPERATING SYSTEMS AND PROGRAMMING
h. OPERATOR SYSTEM GRAPHICS
i. COMMISSIONING, CALIBRATION, ACTIVATION, AND DE-BUGGING
j. DEMONSTRATIONS AND TRAINING
5. ALL CONTROL POINTS SHALL BE VISIBLE AND USER ADJUSTABLE THROUGH THE CONTROL SYSTEM
INTERFACE.
6. COORDINATE THE RANGE, SET POINT, DEAD-BAND, CHARACTERISTICS AND MOUNTING LOCATIONS
OF SENSORS WITH THE ACTUAL EQUIPMENT FURNISHED. INSTALL SENSORS, TUBING, AND WIRING
TO BE ACCESSIBLE AND AS NOT TO IMPEDE OR ENCROACH UPON EQUIPMENT SERVICE AND
ACCESS AREAS.
7. ALL SENSOR TUBING SHALL BE RIGID HARD-DRAWN TYPE L COPPER TUBING.
8. ALERT THE ENGINEER PRIOR TO PROCEEDING WITH WORK WHERE PROPOSED SEQUENCES
COULD DEFEAT THE EQUIPMENT MANUFACTURER'S EQUIPMENT SAFETIES, OR BE DETRIMENTAL
TO THE EQUIPMENT CONTROLLED.
9. SEQUENCES ARE PERFORMANCE-BASED AND GENERALLY DO NOT REFER TO SPECIFIC
DEAD-BANDS, RESET RATIOS, DELAYS, AND RANGES REQUIRED FOR STABLE OPERATION. THESE
PARAMETERS SHALL BE FULLY ADJUSTABLE THROUGH THE DDC SYSTEM INTERFACE.
10. PROVIDE MODIFICATION TO THE SET POINTS, DEAD-BANDS, DELAYS AND RANGES BASED UPON
THE ACTUAL PERFORMANCE OF THE CONTROLLED EQUIPMENT IN ORDER TO PROVIDE STABLE
OPERATION WITHOUT EXCESSIVE CYCLING OR HYSTERESIS. DO NOT MODIFY THE SEQUENCE
WITHOUT SUBMITTING AN ALTERNATE SEQUENCE TO THE ENGINEER FOR REVIEW AND APPROVAL.
11. DEMONSTRATE THE SEQUENCE OF OPERATION IN THE PRESENCE OF THE COMMISSIONING AGENT
FOR ALL CONTROLLED EQUIPMENT, TO INCLUDE GENERATION OF ALARMS AND SIMULATION OF
POWER OUTAGES, POWER RESTORATION, AND GENERAL EQUIPMENT FAILURES.
12. IN ADDITION TO SPECIFIC EQUIPMENT ALARMS NOTED IN THE CONTRACT DOCUMENTS, PROVIDE
STANDARD ALARMS FOR ITEMS SUCH AS SENSOR FAILURE, OUT-OF-RANGE (HIGH/LOW LIMITS)
AND SIMILAR ITEMS. REFER TO THE POINTS LIST ON M6.02 FOR MORE INFORMATION REGARDING
ALARMS.
13. COORDINATE SEQUENCES AND DATA ACQUISITION REQUIREMENTS AND PROVIDE FOR TREND
LOGGING, REPORT GENERATION, CALCULATED RUN-HOURS, AND SIMILAR PREVENTATIVE
MAINTENANCE FUNCTIONS.
14. ALL POWER,COMMUNICATION, AND CONTROL WIRES SHALL BE RUN IN GALVANIZED STEEL
CONDUIT.
15. POWER WIRING SHALL NOT BE RUN IN THE SAME CONDUIT AS LOW VOLTAGE WIRING, SIGNAL, OR
COMMUNICATIONS WIRING. FINAL CONNECTION TO SENSORS AND ACTUATORS MAY BE MADE
WITH FLEXIBLE CONDUIT NOT TO EXCEED 30 INCHES IN LENGTH.
16. WIRING SHALL BE INSTALLED IN ACCORDANCE WITH THE CURRENT VERSION OF THE NATIONAL
ELECTRIC CODE (NEC). CONDUCTORS SHALL BE COPPER, ONE-PIECE, INSTALLED WITHOUT
SPLICES.
17. POWER (120V AND ABOVE) AND CONDUIT SHALL BE PROVIDED AND TERMINATED BY THE
ELECTRICAL CONTRACTOR. TRANSFORMERS, DC POWER RECTIFIERS, AND EXTENSION OF
LOW-VOLTAGE POWER TO ACTUATORS, TRANSMITTERS, AND SIMILAR CONTROL DEVICES AND
SENSORS SHALL BE PROVIDED BY THE CONTROLS CONTRACTOR.
18. ALL CONTROL COMPONENTS, INCLUDING VALVE ACTUATORS, LOCATED OUTDOORS SHALL BE
DESIGNED FOR SUCH APPLICATION. COMPONENT ENCLOSURES SHALL ALLOW ACCESS AND BE
WEATHERPROOF WHEN CLOSED.
FAN - CENTRIFUGAL
COOLING COIL
HEATING COIL
AIR FILTER SECTION
TU
MANUALLY RE-SETTABLE TYPE
TERMINAL UNIT (VAV BOX)
PUMP
AIR FLOW MEASURING STATION
CONTROL SYSTEM LEGEND
DESCRIPTION
CONTROLS
SYMBOL DESCRIPTIONSYMBOL
EQUIPMENT
ANALOG INPUT
ANALOG OUTPUT
BI BINARY INPUT
BINARY OUTPUT
FULL BACNET COMMUNICATION
CURRENT SWITCH
DIFFERENTIAL PRESSURE SWITCH
DIFFERENTIAL PRESSURE TRANSMITTER
FREEZESTAT
SMOKE DETECTOR
STATIC PRESSURE LIMIT SWITCH
STATIC PRESSURE TRANSMITTER
MOTOR STARTER WITH RELAYS
TEMPERATURE SENSOR
VARIABLE FREQUENCY DRIVE
TRANSFORMER
MOTORIZED CONTROL VALVE ACTUATOR
VELOCITY PRESSURE SENSOR
FLOW METER
FLOW SWITCH
ABBREVIATIONS
AO
AI
BO
BC
AFMS
CS
DPS
DPT
FZ
FM
FS
SD
SPL
SPT
STR
TS
VFD
MV
VPS
XFMR
C
C
H
C
CARBON DIOXIDE SENSORCO2
ULTRAVIOLET LIGHT UV
OCCUPANCY SENSOROCC
ELECTRONICALLY COMMUTATED MOTORECM
BI-POLARIZATION BARION
RELAYRLY
SCR SILICON CONTROLLED RECTIFIER
MOTORIZED CONTROL DAMPER ACTUATORMD
OPPOSED BLADE DAMPER
PARALLEL BLADE DAMPER
E.C. ELECTRICAL CONTRACTOR
N.C. NORMALLY CLOSED
N.O. NORMALLY OPEN
EA EXHAUST AIR
F/A FIRE ALARM
OA OUTDOOR AIR
RA RETURN AIR
SA SUPPLY AIR
TU TERMINAL UNIT
UVL ULTRA-VIOLET LIGHT
VAV VARIABLE AIR VOLUME
CURRENT TRANSDUCERCT
FIRE ALARMF/A
PRESSURE SENSORPS
X
POINT DESCRIPTION - REFER TO DIRECT
DIGITAL CONTROLS (DDC) POINTS SCHEDULE
RELATIVE HUMIDITY SENSORRH
FAN - PLENUM
UV LIGHT
TS
DUCT-MOUNTED SENSOR
TS
DUCT-MOUNTED SENSOR
(AVERAGING)
DUCT ACCESS DOOR
CHILLER PLANT SEQUENCE OF OPERATIONS
RMS REFRIGERANT MONITORING SYSTEM
WATER LEVELLVL
PARTIAL CONTROL POINT SCHEDULE
CHILLER (TYP)
EVAPORATOR FLOW (GPM)
POINT
EVAPORATOR LEAVING TEMP (DEG F)
EVAPORATOR ENTERING TEMP (DEG F)
CONDENSER WATER RETURN TEMP (DEG F)
CONDENSER WATER SUPPLY TEMP (DEG F)
EVAPORATOR DIFFERENTIAL PRESSURE (PSI)
CONDENSER DIFFERENTIAL PRESSURE (PSI)
AI AO BI BO
CHWP PUMP MOTOR VFD
NOTES
SEE NOTES 2 AND 3
BASIN WATER LEVEL ALARM (1 PER STAGE)
BASIN WATER TEMP (DEG F)
SEE NOTE 1
CHILLER CONTROLLER SEE NOTE 2
CWR ISOLATION VALVE ACTUATOR POSITION
CWR TOWER BYPASS VALVE ACTUATOR POSITION
CONDENSER FLOW (GPM)
CHWP PUMP STRAINER DIFFERENTIAL PRESSURE (PSI)
RMS SYSTEM CONTROL PANEL SEE NOTE 2
SEE NOTE 1
OPEN/CLOSE - SPRING FAIL OPEN
MODULATING - SPRING FAIL CLOSED
COOLING TOWER FAN VFD SEE NOTES 2 AND 3
EVAPORATOR ENTERING PRESSURE (PSI)
EVAPORATOR LEAVING PRESSURE (PSI)
CONDENSER WATER SUPPLY PRESSURE (PSI)
CONDENSER WATER RETURN PRESSURE (PSI)
CWP PUMP MOTOR VFD SEE NOTES 2 AND 3
CWP PUMP STRAINER DIFFERENTIAL PRESSURE (PSI)
GENERAL NOTE: THIS IS NOT INTENDED TO BE A COMPLETE POINTS LIST. THERE ARE EXISTING CONTROL POINTS THAT ARE NOT
INCLUDED HERE AND ARE TO REMAIN. THE PURPOSE OF THIS POINTS LIST IS TO CLARIFY THE FUNCTION OF THE CONTROL
POINTS AFFECTED BY THIS PROJECT.
CONTROL POINT NOTES
1. USE THE BARREL DIFFERENTIAL PRESSURE TO CALCULATE THE FLOW. OBTAIN CHILLER MANUFACTURER'S DIFFERENTIAL
PRESSURE VS FLOW INFORMATION TO CREATE THE SOFTWARE CALCULATION.
2. PROVIDE BACNET COMMUNICATION TO ALLOW FOR MONITORING, CONTROL, AND ADJUSTMENT THROUGH THE THE BUILDING
MANAGEMENT DIRECT DIGITAL CONTROL SYSTEM.
3. CONTROL POINTS FOR VFD'S SHALL INCLUDE THE FOLLOWING:
· BI - HAND ON-OFF-AUTO SWITCH (ON/OFF/AUTO)
· BO - START/STOP COMMAND (ON/OFF)
· AI - STATUS (AMPS)
· BI - FAULT (ON/OFF)
· AO - SPEED COMMAND (HZ)
· AI - SPEED FEEDBACK (HZ)
SYSTEM GENERAL DESCRIPTION AND PHASING
1. THE EXISTING CHILLED WATER SYSTEM CONSISTS OF THE FOLLOWING:
a. TWO 411-TON WATER-COOLED CENTRIFUGAL CHILLERS AND TWO
COOLING TOWERS.
b. EACH CHILLER HAS A DEDICATED CHILLED WATER PUMP, A DEDICATED
CONDENSER WATER PUMP, AND A SHARED COOLING TOWER (CELLS
CAN BE MANUALLY ISOLATED).
c. THE CHILLERS ARE ALLOWED TO OPERATE ONE AT A TIME, OR
TOGETHER IN PARALLEL. THERE ARE NO MOTORIZED VALVES SO THE
PUMP CHECK VALVES KEEP THE WATER FROM FLOWING IN THE
INACTIVE SYSTEM WHEN ONLY 1 CHILLER IS OPERATING.
2. THE MODIFICATIONS TO THE SYSTEMS WILL BE COMPLETED IN 2 PHASES
AND CONTROLS WORK WILL BE REQUIRED FOR EACH PHASE. REVIEW
ENTIRE SET OF CONTRACT DOCUMENTS FOR ENTIRE REQUIRED SCOPE.
3. PHASE 1: THE RENOVATED CHILLED WATER SYSTEM CONSISTS OF THE
FOLLOWING:
a. ONE EXISTING 411-TON WATER-COOLED CENTRIFUGAL CHILLER (CH-1)
WITH EXISTING DEDICATED CHILLED WATER PUMP (CHWP-1) AND NEW
DEDICATED CONDENSER WATER PUMP (CWP-1).
b. ONE EXISTING 411-TON WATER-COOLED CENTRIFUGAL CHILLER (CH-2)
WITH EXISTING DEDICATED CHILLED WATER PUMP (CHWP-2) AND NEW
DEDICATED CONDENSER WATER PUMP (CWP-2).
c. TWO NEW COOLING TOWERS.
d. IT IS POSSIBLE TO USE EITHER COOLING TOWER WITH EITHER PUMP
VIA MANIPULATION OF MOTORIZED VALVES.
e. CHILLERS SHALL BE ALLOWED TO OPERATE SIMULTANEOUSLY.
f. ONLY ONE COOLING TOWER SHALL BE ALLOWED TO OPERATE AT A
TIME REGARDLESS OF HOW MANY CHILLERS ARE OPERATING.
3. PHASE 2: THE RENOVATED CHILLED WATER SYSTEM CONSISTS OF THE
FOLLOWING:
a. ONE EXISTING 411-TON WATER-COOLED CENTRIFUGAL CHILLER (CH-1)
WITH EXISTING DEDICATED CHILLED WATER PUMP (CHWP-1) AND NEW
DEDICATED CONDENSER WATER PUMP (CWP-1).
b. ONE NEW 900-TON WATER-COOLED CENTRIFUGAL CHILLER (CH-2)
WITH NEW DEDICATED CHILLED WATER PUMP (CHWP-2) AND NEW
DEDICATED CONDENSER WATER PUMP (CWP-2).
c. TWO NEW COOLING TOWERS.
d. IT IS POSSIBLE TO USE EITHER COOLING TOWER WITH EITHER PUMP
VIA MANIPULATION OF MOTORIZED VALVES.
e. ONLY ONE CHILLER SHALL BE ALLOWED TO OPERATE AT A TIME.
f. ONLY ONE COOLING TOWER SHALL BE ALLOWED TO OPERATE AT A
TIME.
4. THE EXISTING AUTOMATED LOGIC CONTROL SYSTEM SHALL BE EXPANDED
TO INCLUDE THE NEW COMPONENTS. THE CONTROL CONTRACTOR IS
REQUIRED TO UPDATE THE SOFTWARE, PROGRAMMING, AND GRAPHICS
AS PART OF THIS CONTRACT FOR BOTH PHASES.
SEQUENCE OF OPERATIONS
CHILLER OPERATING MODE ENABLE/DISABLE
1. THE CHILLERS SHALL BE ENABLED/DISABLED THROUGH A TIME-OF-DAY
SCHEDULE OR THROUGH A USER INPUT VIA THE DDC SYSTEM.
PHASE 1 - CHILLER OPERATING MODES
1. CHILLER OFF/STAND-BY MODE
a. CHILLER CONTROLS: DISABLED
b. CHILLED WATER PUMP VFD SPEED: 0 HZ
c. CONDENSER WATER PUMP VFD SPEED: 0 HZ
d. COOLING TOWER FAN: 0 HZ
e. COOLING TOWER ISOLATION VALVE: 0% OPEN
f. COOLING TOWER BYPASS VALVE: 100% OPEN
2. CHILLER CH-1 ON MODE
a. CH-1 CONTROLS: OPERATING
b. CHWP-1 VFD SPEED: SPEED (HZ) DETERMINED DURING TESTING AND
BALANCING TO PROVIDE 1,075 GPM.
c. CWP-1 VFD SPEED: SPEED (HZ) DETERMINED DURING TESTING AND
BALANCING TO PROVIDE 1,350 GPM.
d. CT-1 FAN VFD: OPERATING PER THE SEQUENCES
e. CT-1 ISOLATION VALVE: 100% OPEN
f. CT-1 BYPASS VALVE: OPERATING PER THE SEQUENCES
3. CHILLER CH-2 ON MODE
a. CH-2 CONTROLS: OPERATING
b. CHWP-2 VFD SPEED: SPEED (HZ) DETERMINED DURING TESTING AND
BALANCING TO PROVIDE 1,075 GPM.
c. CWP-2 VFD SPEED: SPEED (HZ) DETERMINED DURING TESTING AND
BALANCING TO PROVIDE 1,350 GPM.
d. CT-2 FAN VFD: OPERATING PER THE SEQUENCES
e. CT-2 ISOLATION VALVE: 100% OPEN
f. CT-2 BYPASS VALVE: OPERATING PER THE SEQUENCES
4. CHILLERS CH-1 AND CH-2 ON MODE
a. CH-1 AND CH-2 CONTROLS: OPERATING
b. CHWP-1 AND CHWP-2 VFD SPEED: SPEED (HZ) DETERMINED DURING
TESTING AND BALANCING TO EACH PROVIDE 1,075 GPM.
c. CWP-1 AND CWP-2 VFD SPEED: SPEED (HZ) DETERMINED DURING
TESTING AND BALANCING TO EACH PROVIDE 1,350 GPM.
d. CT-1 FAN VFD: DISABLED
e. CT-1 ISOLATION VALVE: 0% OPEN
f. CT-1 BYPASS VALVE: 100% OPEN - SEQUENCE DISABLED
g. CT-2 FAN VFD: OPERATING PER THE SEQUENCES
h. CT-2 ISOLATION VALVE: 0% OPEN
i. CT-2 BYPASS VALVE: OPERATING PER THE SEQUENCES
PHASE 2 - CHILLER OPERATING MODES
1. CHILLER OFF/STAND-BY MODE: SAME AS PHASE 1
2. CHILLER CH-1 ON MODE: SAME AS PHASE 1
3. CHILLER CH-2 ON MODE
a. CH-2 CONTROLS: OPERATING
b. CHWP-2 VFD SPEED: SPEED (HZ) DETERMINED DURING TESTING AND
BALANCING TO PROVIDE 2,150 GPM.
c. CWP-2 VFD SPEED: SPEED (HZ) DETERMINED DURING TESTING AND
BALANCING TO PROVIDE 2,700 GPM.
d. CT-2 FAN VFD: OPERATING PER THE SEQUENCES
e. CT-2 ISOLATION VALVE: 100% OPEN
f. CT-2 BYPASS VALVE: OPERATING PER THE SEQUENCES
4. CHILLERS CH-1 AND CH-2 ON MODE: SIMULTANEOUS OPERATION OF
CHILLERS IS NOT ALLOWED IN PHASE 2
PUMP START/STOP
1. THE DDC SYSTEM CONTROLLER WILL START A CHILLED WATER PUMP
THROUGH A CONTACT CLOSURE OF THE PUMP'S VARIABLE FREQUENCY
DRIVE (VFD) RUN-ENABLE CONTACTS. THE PUMP WILL OPERATE AT
CONSTANT VOLUME AT THE SPEED DETERMINED DURING THE TEST AND
BALANCE TO PROVIDE THE SCHEDULED WATER FLOW RATE.
PUMP STATUS
1. THE BAS CONTROLLER WILL DETECT PUMP RUN STATUS BY VIA THE AMP
DRAW INPUT FROM THE VFD.
PUMP FAILURE
1. IF A PUMP IS SCHEDULED TO OPERATE BUT THE VFD AMP DRAW SHOWS
THAT IT IS NOT RESPONDING, THE DDC SYSTEM CONTROLLER WILL
ANNUNCIATE A PUMP FAILURE ALARM TO THE DDC SYSTEM, SWITCH THE
ASSOCIATED CHILLER TO OFF/STAND-BY MODE, AND SWITCH THE OTHER
CHILLED WATER SYSTEM TO THE ON MODE.
COOLING TOWER FAN CONTROL
1. WHEN THE CHILLER ASSOCIATED WITH THE COOLING TOWER IS
OPERATING AND THE COOLING TOWER BASIN TEMPERATURE RISES TO 2.0
DEG. F (ADJ.) ABOVE THE SET POINT, THE COOLING TOWER FAN WILL BE
TURNED ON AT MINIMUM SPEED AND THE DDC CONTROL LOOP ENABLED.
THE FAN SPEED SHALL BE MODULATED TO MAINTAIN THE COOLING
TOWER BASIN TEMPERATURE AT SET POINT.
2. WHEN THE FAN IS OPERATING AT MINIMUM SPEED AND THE TOWER BASIN
WATER TEMPERATURE FALLS 5.0 DEG F (ADJ.) BELOW THE SET POINT, THE
TOWER FAN WILL TURN OFF.
COOLING TOWER FAN FAILURE
1. IF A FAN IS SCHEDULED TO OPERATE BUT THE VFD AMP DRAW SHOWS
THAT IT IS NOT RESPONDING, THE DDC SYSTEM CONTROLLER WILL
ANNUNCIATE A FAN FAILURE ALARM TO THE DDC SYSTEM, SWITCH THE
ASSOCIATED CHILLER TO OFF/STAND-BY MODE, AND SWITCH THE OTHER
CHILLED WATER SYSTEM TO THE ON MODE.
COOLING TOWER BYPASS CONTROL
1. WHEN THE ACTIVE SYSTEM'S COOLING TOWER FAN IS OFF AND THE
TOWER BASIN WATER TEMPERATURE FALLS 8.0 DEG F (ADJ.) BELOW THE
SET POINT, THE BYPASS VALVE SHALL START TO OPEN. THE COOLING
TOWER FAN SHALL NOT BE ALLOWED TO OPERATE WHEN THE TOWER IS
IN BY-PASS MODE.
2. THE BYPASS VALVE SHALL MODULATE TO MAINTAIN THE BASIN
TEMPERATURE AT SET POINT.
3. WHEN THE SET POINT IS SATISFIED AND THE BY-PASS CONTROL VALVE
HAS MODULATED CLOSED, THE COOLING TOWER SHALL EXIT THE BYPASS
CONTROL SEQUENCE AND RETURN TO NORMAL OPERATING SEQUENCES.
COOLING TOWER BASIN HEATER CONTROL
1. WHEN THE BASIN WATER TEMPERATURE FALLS BELOW 60 DEG F (ADJ),
THE BASIN HEATER SHALL BE ENABLED TO MAINTAIN THE TEMPERATURE
AT THE SET POINT.
COOLING TOWER LOW LEVEL ALARM
1. COOLING TOWER SUMP LEVEL SENSOR WILL PROVIDE A LOW WATER
LEVEL ALARM TO THE DDC SYSTEM.
M5.1
CONTROLS -
MECHANICAL
DRAWING NUMBER
DRAWING TITLE:
DRAWN BY:
GES PROJECT NO.:
DATE:
REGISTRATION:
REVISIONS:
PROJECT:
SOF
01-28-21
F20-43
SUBMISSIONS:
USDA PROJECT NO.:
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE SUITE 301
BETHESDA, MARYLAND 20817
T: 301.216.2871 (F) 301-216-9671 www.SalasObrien.com
AR EPM:
AGRICULTURAL RESEARCH SERVICES
SOUTHEAST AREA
950 College Station Road
Athens, GA 30605
UPGRADE
CHILLERS
RRC BUILDING
VE
AG-32SD-C-15-0044
1. 95% CD SUBMISSION 11/18/20
2. FINAL TURNOVER 01/28/21
M5.2
CHILLED WATER PLANT CONTROL SCHEMATIC - PHASE 1B - DEMO
NOT TO SCALE
CH
CONDENSER
EVAPORATOR
CHILLER
CONTROLLER
PS
PS
TS
DPT
DPT
TS
CH
CONDENSER
EVAPORATOR
CHILLER
CONTROLLER
PS
PS
TS
DPT
DPT
TS
PS
PS
PS
PS
CWP
CWP
CHWP
CHWP
8"
8"
8"
12"
8"
8"
10"
10"
CT
CT
CELL 1
CELL 2
10"
8"
X"
D1
D1
8" 8"
8" 8"
10"
M5.2
CHILLED WATER PLANT CONTROL SCHEMATIC - PHASE 1B - NEW
NOT TO SCALE
CH
CONDENSER
EVAPORATOR
CHILLER
CONTROLLER
CONDENSER
EVAPORATOR
CHILLER
CONTROLLER
PS
PS
CWP
12"
10"
10"
CT
CT
12"
8"
8" 8"
8"
8"
8"
12"
D1
D1
D1
MV
12"
12"12"
8" 8"
D1
12"
10"
12"
12"
12"
411 TONS 411 TONS
411 TONS
M5.2
PHASE 1A - LINE-STOP INSTALLATION
NOT TO SCALE
10"
10"
D6 D6
D6 D6
LINE-STOP WITH BYPASS (TYP 2)
SEE PHASE 1 FOR WORK IN THIS AREA
SEE PHASE 1B DEMO FOR GENERAL LOCATION OF WORK IN THIS AREA
PHASE 1A: INSTALL LINE-STOP WITH BYPASS TO MINIMIZE PLANT DOWNTIME.
REFERENCE NOTES - NEW REFERENCE NOTES - DEMO
D11
CONNECT NEW PIPING TO EXISTING.
ROUTE TEMPORARY PIPING TO TEMPORARY AIR-COOLED
CHILLER LOCATED OUTSIDE.
CLOSE VALVE TO ISOLATE THE CHILLER PLANT FROM THE
DISTRIBUTION LOOP AND USE THE TEMPORARY CHILLER TO
PROVIDE THE BUILDING'S CHILLED WATER.
REMOVE OPERATOR LEAVING THE LINE STOP VALVE IN THE
100% OPEN POSITION.
NEW COOLING TOWER.
NEW CONDENSER WATER PUMP AND ACCESSORIES.
NEW VFD FOR CHILLED WATER PUMP. THE EXISTING STARTERS
ARE BEING DEMOLISHED AS PART OF THE PHASE 1 ELECTRICAL
WORK. NEW VFD SHALL BE SIZED FOR FUTURE PUMP
INSTALLATION BUT BALANCED TO OPERATE AT CONSTANT
SPEED TO PROVIDE THE REQUIRED CHILLED WATER FLOW FOR
THE EXISTING CHILLER SERVED. THE VFD WILL BE REBALANCED
WHEN THE NEW PUMPS ARE INSTALLED IN THE FUTURE. THE DIV
23 CONTRACTOR SHALL PROVIDE AND MOUNT THE VFD, THE DIV
26 CONTRACTOR SHALL COMPLETE THE INSTALLATION.
DISCONNECT PIPING AND PREPARE FOR CONNECTION TO NEW.
DEMOLISH COOLING TOWER AND PIPING AS INDICATED.
DEMOLISH PUMP, PIPING, AND APPURTENANCES AS INDICATED.
ROUTE TEMPORARY PIPING TO TEMPORARY AIR-COOLED
CHILLER LOCATED OUTSIDE.
CLOSE VALVE TO ISOLATE THE CHILLER PLANT FROM THE
DISTRIBUTION LOOP AND USE THE TEMPORARY CHILLER TO
PROVIDE THE BUILDING'S CHILLED WATER.
INSTALL LINE-STOP WITH BYPASS IN THE 10-INCH DIAMETER
CHWS AND CHWR PIPES.
TO TEMP
CHILLER
TO TEMP
CHILLER
D2
D3
D3
D3
COOLING TOWER
EQUALIZER PIPING
CWP
12"
12"
GENERAL NOTES
1. COORDINATION WITH THE EXISTING CHEMICAL TREATMENT VENDOR
IS REQUIRED AS PART OF THIS PROJECT.
· THE CONTRACTOR SHALL PROVIDE ALL NEW PIPE CONNECTIONS
REQUIRED BY THE CHEMICAL TREATMENT VENDOR TO ALLOW
FOR CHEMICAL INJECTION AND MONITORING.
· THE CHEMICAL TREATMENT VENDOR SHALL ADJUST THE
CONDENSER WATER TREATMENT TO ACCOMMODATE THE
LARGER COOLING TOWERS.
COOLING TOWER DRAIN
COOLING BYPASS
MV
COOLING OVERFLOW
12"
MV
MV
COOLING OVERFLOW
12"
COOLING BYPASS
12"
DPT
TS
TS
TS LVL TS LVL
TS
LVL
TS
LVL
VFD
VFD
VFD
VFD
DPT
DPT
12"
12"
RMS
14 15
14 15
14 15
14 15
22 21
22 21
PS
PS
TS
DPT
DPT
TS
PS
PS
TS
DPT
DPT
TS
CHWP
CHWP
8"
8"
8"
8"
8"
CH
411 TONS
8"
8"
13 13
D5
D5
D4
D4
10"
10"
D4
D5
D1
D1
D2
D2
D6
D1
NEW LUG STYLE BUTTERFLY VALVE
WITH BLIND FLANGE FOR FUTURE
NEW CHILLER CH-1 CONNECTION
D1
D1
D1
D1
D1
D1
10"10"
RMS
VFD19
VFD19
M5.2
CONTROLS -
MECHANICAL
DRAWING NUMBER
DRAWING TITLE:
DRAWN BY:
GES PROJECT NO.:
DATE:
REGISTRATION:
REVISIONS:
PROJECT:
SOF
01-28-21
F20-43
SUBMISSIONS:
USDA PROJECT NO.:
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE SUITE 301
BETHESDA, MARYLAND 20817
T: 301.216.2871 (F) 301-216-9671 www.SalasObrien.com
AR EPM:
AGRICULTURAL RESEARCH SERVICES
SOUTHEAST AREA
950 College Station Road
Athens, GA 30605
UPGRADE
CHILLERS
RRC BUILDING
VE
AG-32SD-C-15-0044
M5.3
CHILLED WATER PLANT CONTROL SCHEMATIC - PHASE 2 - DEMO
NOT TO SCALE
CH
CONDENSER
EVAPORATOR
CHILLER
CONTROLLER
PS
PS
TS
DPT
DPT
TS
PS
PS
TS
DPT
DPT
TS
PS
PS
8"
8"
8"
10"
10"
8"
CH
CONDENSER
EVAPORATOR
CHILLER
CONTROLLER
TS
10"
10"
8"
8"
D1
12"
TS
900 TONS
REFERENCE NOTES - NEW REFERENCE NOTES - DEMO
D11
CONNECT NEW PIPING TO EXISTING.
NEW CHILLER.
NEW CHILLED WATER PUMP AND ACCESSORIES.
DISCONNECT PIPING AND PREPARE FOR CONNECTION TO NEW.
DEMOLISH CHILLER AND PIPING AS INDICATED.
DEMOLISH PUMP, PIPING, AND APPURTENANCES AS INDICATED.
CLOSE VALVE TO ISOLATE CH-2 FROM THE DISTRIBUTION LOOP
AND USE CH-1 TO PROVIDE THE BUILDING'S CHILLED WATER.
PROVIDE TEMPORARY AIR-COOLED CHILLER TIED INTO THE
DISTRIBUTION SYSTEM IF WORK IS PERFORMED IN THE WARMER
MONTHS WHEN CH-1 CANNOT HANDLE THE LOAD.
D2
D3
D3
D4
CHWP
3/4"
NEW CHEMICAL SHOT FEEDER
GENERAL NOTES
1. COORDINATION WITH THE EXISTING CHEMICAL TREATMENT VENDOR
IS REQUIRED AS PART OF THIS PROJECT.
· THE CONTRACTOR SHALL PROVIDE ALL NEW PIPE CONNECTIONS
REQUIRED BY THE CHEMICAL TREATMENT VENDOR TO ALLOW
FOR CHEMICAL INJECTION AND MONITORING.
· THE CHEMICAL TREATMENT VENDOR SHALL PROVIDE CHEMICAL
PELLETS FOR THE CHILLED WATER SHOT FEEDER.
2. THE REQUIREMENT FOR A TEMPORARY AIR-COOLED CHILLER FOR
PHASE 2 WORK IS DEPENDANT ON THE TIME OF YEAR THE WORK IS
PERFORMED. IF THE WORK IS TO BE PERFORMED DURING MONTHS
WHERE THE PLANT DEMAND HAS BEEN HISTORICALLY GREATER
THAN THE CAPACITY OF CHILLER CH-1, THE CONTRACTOR SHALL
PROVIDE AN AIR-COOLED CHILLER AND PUMP PACKAGE TIED INTO
THE EMERGENCY CHILLED WATER CONNECTIONS. THE TEMPORARY
CHILLER SHALL OPERATE IN PARALLEL WITH CHILLER CH-1.
DPT
VFD DPT
12"
DPT
TS
TS
8"
8"
CONDENSER
EVAPORATOR
CHILLER
CONTROLLER
CWP
12"
CT
CT
12"
8" 8"
MV
12"
8" 8"
12"
12"
COOLING TOWER
EQUALIZER PIPING
CWP
12"
12"
COOLING TOWER DRAIN
COOLING BYPASS
MV
COOLING OVERFLOW
12"
MV
MV
COOLING OVERFLOW
12"
COOLING BYPASS
12"
TS
LVL
TS
LVL
VFD
VFD
VFD
VFD
DPT
DPT
12"
12"
14 15
14 15
22 21
22 21
CH
12"
D1
M5.3
CHILLED WATER PLANT CONTROL SCHEMATIC - PHASE 2 - DEMO
NOT TO SCALE
CH
CONDENSER
EVAPORATOR
CHILLER
CONTROLLER
PS
PS
TS
DPT
DPT
TS
PS
PS
8"
10"
10"
12"
RMS
12"
CWP
12"
CT
CT
12"
8" 8"
MV
12"
8" 8"
12"
12"
COOLING TOWER
EQUALIZER PIPING
CWP
12"
12"
COOLING TOWER DRAIN
COOLING BYPASS
MV
COOLING OVERFLOW
12"
MV
MV
COOLING OVERFLOW
12"
COOLING BYPASS
12"
TS
LVL
TS
LVL
VFD
VFD
VFD
VFD
DPT
DPT
12"
12"
14 15
14 15
22 21
22 21
12"
RMS
8"
8"
8"
DPT8
TS
TS
12"
12"
3/4"
411 TONS
411 TONS411 TONS
D2
D1
D11
CHWP
8"
10"
10"
10" 10"
RMS
D4
D4
10" EMERGENCY CHILLED
WATER SUPPLY CONNECTION
10" EMERGENCY CHILLED
WATER RETURN CONNECTION
10" EMERGENCY CHILLED
WATER SUPPLY CONNECTION
10" EMERGENCY CHILLED
WATER RETURN CONNECTION
VFD19
CHWP
CHWP
VFD19
VFD19
M5.3
CONTROLS -
MECHANICAL
DRAWING NUMBER
DRAWING TITLE:
DRAWN BY:
GES PROJECT NO.:
DATE:
REGISTRATION:
REVISIONS:
PROJECT:
SOF
01-28-21
F20-43
SUBMISSIONS:
USDA PROJECT NO.:
ENGINEERING
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT
6700A ROCKLEDGE DRIVE SUITE 301
BETHESDA, MARYLAND 20817
T: 301.216.2871 (F) 301-216-9671 www.SalasObrien.com
AR EPM:
AGRICULTURAL RESEARCH SERVICES
SOUTHEAST AREA
950 College Station Road
Athens, GA 30605
UPGRADE
CHILLERS
RRC BUILDING
VE
AG-32SD-C-15-0044
MANUFACTURER
ENTERING WATER TEMP (DEG F)
WATER FLOW (GPM)
NOMINAL CAPACITY (TONS)
MANUFACTURER
COOLING TOWERS
ELECTRICAL DATA
MOCP
MCA
OUTLET SUCTION CONNECTION SIZE (IN)
INLET CONNECTION SIZE (IN)
OPERATING WEIGHT (LBS)
UNIT REQUIREMENTS
WATER-COOLED CHILLERS
NOTES
ACCESSORIES
MARK
NOTES
VOLTS/PHASE/HZ
EVAPORATOR
FULL LOAD KW/TON
MARK
MODEL
LOCATION
TYPE
CT-1
1. SIDE CWR OUTLET CONNECTION
2. TOP DUAL CWR INLET CONNECTION WITH BALANCING VALVES
3. BOTTOM EQUALIZER PIPE AND OVERFLOW PIPE CONNECTIONS
4. 304 STAINLESS STEEL BASIN
5. VIBRATION CUT OUT SWITCH
6. TEFC VARIABLE SPEED FAN MOTOR, INVERTER DUTY RATED PER NEMA MG-1
7. FAN MOTOR SHAFT GROUNDING RINGS
8. FAN MOTOR SPACE HEATERS
9. EXTENDED LUBRICATION LINES
10. DRIFT ELIMINATORS
11. AUTOMATIC WATER LEVEL MEASUREMENT AND CONTROL
12. IBC STANDARD STRUCTURAL DESIGN WITH 1.0 IMPORTANCE FACTOR
13. LADDER W/SAFETY CAGE, SAFETY RAILS AROUND TOP PLATFORM, EXTERIOR
ACCESS DOOR PLATFORM, AND INTERNAL WALKWAY AND PLATFORM FOR FAN
MOTOR ACCESS
14. FACTORY-MOUNTED COOLING TOWER CONTROL ENCLOSURE (NEMA 4X) WITH
SINGLE-POINT 460V CONNECTION AND UNIT-MOUNTED DISCONNECT AND VFD
WITH H-O-A SWITCH. PANEL SHALL PROVIDE POWER FOR ALL SERVICES
REQUIRED BY THE COOLING TOWER INCLUDING, BUT NOT LIMITED TO, THE
FOLLOWING:
· 460V FOR FAN MOTOR VFD WITH INTEGRAL BYPASS
· 460V FOR BASIN HEATERS
· 120V FOR CONTROLS, COOLING FAN, PANEL HEATER, AND MOTOR HEATER
· 24V FOR CONTROLS
1. RIG UNITS INTO PLACE IN STRICT ACCORDANCE WITH THE MANUFACTURER'S
RIGGING INSTRUCTIONS.
2. SET UNIT DEAD LEVEL IN BOTH DIRECTIONS.
3. SUPPORT PIPE SO NO WEIGHT RESTS ON COOLING TOWERS.
4. THOROUGHLY CLEAN UNIT BEFORE FILLING TOWERS.
5. BALANCE THE WATER FLOW BETWEEN THE CELLS.
6. GREASE OR OIL ALL BEARINGS IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS.
7. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL COMPONENTS
SHIPPED LOOSE WITH THE COOLING TOWER.
8. COOLING TOWER CONTROLS SHALL BE INTEGRATED INTO THE EXISTING
BUILDING DDC CONTROLS - AUTOMATED LOGIC CONTROLS.
NOTES
1. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL COMPONENTS
SHIPPED LOOSE WITH THE CHILLER.
2. THE REPLACEMENT OF CHILLER CH-1 IS NOT IN THE SCOPE OF THIS
PROJECT.
CH-2
ACCESSORIES (PROVIDE THE FOLLOWING)
MARK
SERIES
WATER FLOW RATE (GPM)
MANUFACTURER
MOTOR RPM
MOTOR HP
PUMP
PUMPS
CHWP-1
IMPELLER SIZE (IN)
1,000
NOTES
LOCATION
MECH ROOM
TYPE
TOTAL HEAD (FT-H2O)
VOLTS/PHASE/HZ 460/3/60
END-SUCTION
ACCESSORIES
GENERAL
3,4
OPERATING WEIGHT (LBS)
NOTES
ACCESSORIES…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .