CGC ACTIVE Amend A00004.doc
DOC document 64 KB Posted
- Attached to
- USCGC ACTIVE DOCK-SIDE Federal contract opportunity
- Solicitation number
- USCGC_ACTIVE_DS_FY2010
About this file
Amendment A00004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 618_DS_JAD_10R3.pdf | ||
| CGC ACTIVE Amend A00008.doc | DOC document | |
| CGC ACTIVE Amend A00007.doc | DOC document | |
| CGC ACTIVE Amend A00006.doc | DOC document | |
| CGC ACTIVE Amend A00005.doc | DOC document | |
| 618WMEC.zip | ZIP file | |
| CGC ACTIVE Amend A00003.doc | DOC document | |
| 618-WMEC_163_1_2_-_D 1 .pdf | ||
| CGC ACTIVE Amend A00002.doc | DOC document | |
| Active RFQ.doc | DOC document | |
| Active RFQ.doc | DOC document | |
| CGC ACTIVE Amend A00001 Questions and Responses.doc | DOC document | |
| Work Item 11.zip | ZIP file | |
| Standards.zip | ZIP file | |
| NAVSEA Drawings.zip | ZIP file | |
| CG Drawings.zip | ZIP file | |
| Active RFQ.pdf | ||
| 618_DS_JAD_10R2.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
DOA-3
PAGE
OF PAGES
2. AMENDMENT/MODIFICATION NO.
A00004
3. EFFECTIVE DATE
13 April 2010
4. REQUISITION/PURCHASE REQ. NO.
2110800P45H92
5. PROJECT NO.
6. ISSUED BY CODE:
Commander, U.S. Coast Guard
Surface Forces Logistics Center
Contracting and Procurement Branch
Attn: Angel C. Rhone/CPD-C&P1-MEC
300 E. Main Street, Suite 600
Norfolk, VA 23510
7. ADMINISTERED BY CODE:
See Block #6
8. NAME AND ADDRESS OF CONTRACTOR (No, street, county, state and Zip Code)
ALL PROSPECTIVE BIDDERS CODE: FACILITY CODE:
X
9a. AMENDMENT OF SOLICITATION NO.
HSCG80-10-Q-P45H92
9b. DATED (SEE ITEM 11)
14 April 2010___ ______________________
10a. MODIFICATION OF CONTRACT NO.
10b. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENT OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of offers is extended, X is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning one copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (IF REQUIRED)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO DESCRIBED IN ITEM 14.
A. This change order is issued pursuant to: (Specify authority) The changes set forth in Item 14 are made in the contract order no in item 10A.
B. The above numbered contract/order is modified to reflect the administrative changes (such as changes in paying office, appropriation data, etc.) set forth in Item 14 pursuant to the authority of FAR 43.103(b).
C. This supplemental agreement is entered into in pursuant to authority of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor ( is not, X is required to sign this document and return ___1___ copies to the issuing office.
14. Description of amendment/modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible)
USCGC ACTIVE (WMEC 618)
Solicitation No. HSCG80-10-Q-P45H92 is hereby amended as follows:
1. The purpose of this amendment is to: provide answer to the following question (Please see page 2).
2. All other terms and conditions of this solicitation remain unchanged.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Q: Item 2 "chill water system clean and flush" Para. 3.3 calls for system inspection for excessive deterioration or defects. Is the intent of this inspection to remove and reinstall the insulation from this system?
A: To inspect the piping the contractor needs to remove the insulation from the system.
File details come from the government source that posted it. Updated .