UNIT_PAINTING-K-01282026.docx
DOCX document 26 KB Posted
- Attached to
- Painting and Patching Unit K- 02032026 State and local contract opportunity
- Solicitation number
- SRC0000036719
- Issued by
- Summit County, Akron City, Ohio
About this file
This is a Scope of Work document for a painting and patching service issued by the Ohio Department of Behavioral Health, Summit Behavioral Healthcare location. The vendor is responsible for patching and painting interior walls, three bedrooms and bathrooms, and nursing station walls in Unit K, with the goal of achieving a clean, uniform finish throughout all specified areas. The project scope includes preparation work such as inspecting areas requiring patches, ensuring walls are dry and debris-free, removing or covering furniture and fixtures, masking baseboards and trim, and protecting electrical outlets and light fixtures. The vendor must patch all cracks, holes, and surface imperfections using suitable drywall or plaster materials, sand patched areas to blend seamlessly, apply primer to patched areas as needed, and apply at least two coats of paint in the client-specified low-VOC satin finish. The project timeline runs from February 23, 2026 to March 20, 2026. A site visit is required to be considered for the project.
The vendor is responsible for supplying all paint, primer, and patching materials, as well as removing and disposing of all debris off-site. Quality standards require all painted surfaces to be smooth, consistent in color, and free of brush strokes, streaks, or roller marks, with patches blending seamlessly into surrounding walls. The vendor must comply with all applicable safety and environmental regulations, maintain a clean and safe working environment, provide regular project progress updates to the client, and have each completed area inspected and signed off by the client to confirm quality. Pricing terms, set-asides, funding amounts, and specific contract duration are not detailed in this scope of work document.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work for Vendor: Painting and Patching the interior walls and bedrooms of unit K Project Overview: The vendor is responsible for patching and painting the interior walls on unit K. In addition the are 3 bedrooms/bathrooms that need painted. The goal is to achieve a clean, uniform finish throughout all specified areas. In addition to these rooms, painting/patching the nursing stations wall. The ceiling is not included
1. Project Details
· Spaces to be painted: The common area on unit K - walls of the unit and patient bedrooms/bathrooms.
· Surfaces to be painted: Walls
· Existing Condition: Minor patches may be required for imperfections or previous damage.
2. Scope of Work Preparation
· Inspect each area requiring patchwork, such as cracks, dents, or holes.
· Ensure all walls are dry, and free of debris before starting work.
· Remove or cover all furniture, fixtures, and floor surfaces to protect from dust and paint splatters.
· Mask and tape all baseboards, trim, and edges around ceilings, doors, and windows to ensure clean paint lines.
· Move or protect any electrical outlets, light fixtures, and vent covers.
Patching
· Patch all cracks, holes, or surface imperfections using suitable materials for drywall or plaster.
· Sand patched areas smoothly to blend with the existing surface, ensuring a seamless finish.
· Conduct a final inspection to confirm all patched areas are smooth and level.
Priming (if required)
· Apply primer to any patched areas or other areas where needed, ensuring color consistency.
Painting
· Materials and Color: Use paint specified by the client (e.g., low-VOC paint, finish type (SATIN), and color) on walls and ceilings.
· Paint Application: Apply at least two coats of paint for full coverage and uniform finish.
· Maintain proper ventilation and temperature during the painting process.
· Check for uniformity in color and texture after each coat and correct any visible inconsistencies.
Clean-Up
· Remove all protective coverings carefully to avoid any paint spills or damage.
· Clean any minor paint splatters on floors, trim, and fixtures.
· Restore each area its original condition, moving furniture and fixtures back into place.
3. Quality Standards
· All painted surfaces should be smooth, consistent in color, and free of brush strokes, streaks, or roller marks.
· Patches should blend seamlessly with the rest of the wall or ceiling, with no visible lines or texture differences.
· All work should adhere to professional standards, with final inspections in each room to ensure a high-quality finish.
4. Project Timeline
· Start Date: February 23rd, 2026
· Completion Date: March 20, 2026
· The vendor will provide an estimated timeline for each unit and coordinate with the client if adjustments are required.
5. Deliverables
· Fully patched and painted walls in unit K (Common areas)
· Each area inspected and signed off by the client to confirm quality.
6. Materials and Supplies
· Responsibility for Materials: Vendor will supply paint, primer, and patching materials.
· Waste Disposal: Vendor is responsible for removing all debris and disposing of it off-site.
7. General Requirements
· Vendor must comply with all applicable safety and environmental regulations.
· Maintain a clean and safe working environment in all areas throughout the project.
· Provide regular updates to the client on project progress.
· Site Visit required to be considered for project