This document is a Request for Qualifications (RFQ) issued by the State of Colorado's Office of the State Architect for Architectural/Engineering/Consulting Services for the University of Colorado Boulder. The project, designated as UCB001328-WEB-Maintenance-2026, involves upgrades to Weber Hall (Bear Creek Apartment A) Building during the summer of 2026, with potential improvements including mechanical systems, plumbing, painting, carpet, roofing, student rooms, fire alarm, lighting, and BAS systems. The RFQ follows a Design/Bid/Build delivery method with a project budget of approximately $1.9 million. The selection process involves two stages: initial submittal screening and scoring, followed by oral interviews, with a mandatory pre-submittal conference scheduled for 4/15/2025 at 10 AM via Microsoft Teams. Submittals are due electronically via Bidnet by 4/25/2025 at 2 PM, with interviews anticipated during the week of 5/5/2025.
The RFQ outlines specific minimum requirements for the Architect/Engineer team, including prior experience with similar project scope, construction schedules of 60-75 calendar days, knowledge of University of Colorado Boulder standards, and experience with Student Housing and Design/Bid/Build projects. The university prefers firms with experience in Buy Clean Colorado initiatives. Evaluation criteria include assessment of the project team, firm capabilities, prior experience, project approach, and work location, with weighted scoring across these categories. The university reserves the right to use this solicitation to award related similar projects within 12 months of RFQ completion. The anticipated professional services start date is 7/1/2025, with construction services scheduled from 5/26/2026 to 7/31/2026.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| SOL-ADD-01-2025-04-10.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ-AE
Rev. 01/2024 UCB Rev 10/2024
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
REQUEST FOR QUALIFICATIONS
FOR
ARCHITECTURAL/ENGINEERING/CONSULTING SERVICES
Notice Number: 25-43
For The
University of Colorado Boulder
For The
UCB001328-WEB-Maintenance-2026
UCB Rev 10/2024
REQUEST FOR QUALIFICATIONS
FOR
ARCHITECTURAL/ENGINEERING/CONSULTING SERVICES
TABLE OF CONTENTS
I. INTRODUCTION
A. Project Description/Minimum Requirements/Project Delivery B. Selection Process
1. Mandatory Pre-Submittal Conference
2. Architect/Engineer/Consultant Submittals
3. Screening Panel/ Short List
4. Oral Interviews
C. Schedule
II. SUBMITTAL REQUIREMENTS
A. Project Team B. Firm Capabilities C. Prior Experience D. Project Approach E. Work Location
APPENDICES
Appendix A: Preliminary Selection/Evaluation Form Appendix A1: Interview Selection/Evaluation Form Appendix A2: Final Ranking Matrix Appendix B: Architect/Engineer/Consultant Contract Appendix C: Acknowledgement & Attestation Form Appendix D: Scope of Work
Rev. 01/2024 UCB Rev 10/2024
ARCHITECTURAL/ENGINEERING/CONSULTING SERVICES
REQUEST FOR QUALIFICATIONS
DEPARTMENT OF HOUSING FACILITES SERVICES
University of Colorado Boulder
I. INTRODUCTION
A. PROJECT DESCRIPTION
Delivery Method will be Design/Bid/Build with a project budget of approximately $1.9 million dollars.
The Regents of the University of Colorado Boulder anticipates using a Design/Bid/Build approach to project delivery, and requests submittals for qualifications of Architectural/Engineering services for project titled UCB001328-WEB-Maintenance- 2026.The selection of an architect/engineer will be conducted in accordance with the Colorado Revised Statutes, 24-30-1401 et. seq. The process will involve two stages:
submittals will be screened and scored. A limited number of firms will be short listed and invited to participate in oral interviews. The University of Colorado Boulder will attempt to negotiate a contract with the highest ranked firm following the interview segment.
The project in Weber Hall (Bear Creek Apartment A) Building may include upgrades to mechanical system, plumbing, painting, carpet, roofing systems, student rooms, fire alarm, lighting, BAS systems and complete deferred maintenance during the summer of 2026.
Minimum Requirements for this project are:
1. Architect/Engineer team must have prior experience with projects of similar scope and size.
2. Architect/Engineer team must have prior experience with project construction schedules of
60-75 calendar days and of similar complexity.
3. Architect/Engineer team must have prior experience with and knowledge of University of
Colorado Boulder standards.
4. Architect/Engineer team must have prior experience working on Student Housing projects
5. Architect/Engineer team must have prior experience working on Design/Bid/Build projects
6. Architect/Engineer team is preferred to have prior experience working on projects requiring adherence to Buy Clean Colorado or knowledge of the program
The University of Colorado Boulder reserves the right to use this solicitation to award related similar project, within 12 months of RFQ completion.
B. SELECTION PROCESS
The selection of an architect/engineer/consultant will be conducted in accordance with the Colorado Revised Statutes, 24-30-1401 et. seq. The process will involve two stages:
submittals will be screened and scored. A limited number of firms will be short listed and invited to participate in oral interviews. The [agency/institution] will attempt to negotiate a contract with the highest ranked firm following the interview segment. Following is additional information relative to the selection process:
Rev. 01/2024 UCB Rev 10/2024
1. Mandatory Pre-submittal Conference: To ensure sufficient information is available to firms preparing submittals, a mandatory pre-submittal conference has been scheduled. The intent of this conference is to have University of Colorado Boulder staff available to discuss the project. Firms preparing submittals must attend and sign-in in order to have their submittals accepted. The pre-submittal conference will be held at:
4/15/2025 at 10AM Microsoft Teams Need help?
Join the meeting now Meeting ID: 267 782 796 314 Passcode: Vs6af6yF
Dial in by phone +1 720-372-0802,,952571694# United States, Aurora
(833) 782-4222,,952571694# United States (Toll-free) Find a local number Phone conference ID: 952 571 694# For organizers: Meeting options | Reset dial-in PIN
PLEASE USE THE COMPUTER AUDIO OR TOLL FREE NUMBER WHEN ABLE
Org help | Privacy and security
2. Architect/Engineer/Consultant’s Submittals: Specific requirements for submittals and scoring criteria are detailed in II. SUBMITTAL REQUIREMENTS. In order to facilitate review, one (1) electronic (pdf) format copy of submittals must be provided.
Submittals must be received attention:
Mykala Keuter, University of Colorado Boulder Project Manager Cynthia London, University of Colorado Boulder Project Coordinator
Submittals are to be submitted electronically via Bidnet at:
https://www.bidnetdirect.com/colorado/universityofcoloradodesignandconstruction
Deadline for receipt via Bidnet is 4/25/2025 at 2PM
Late submittals will be rejected without consideration. The University of Colorado Boulder and the State of Colorado assume no responsibility for costs related to the preparation of submittals.
3. Screening Panel/Short List: Submittals will be evaluated by a panel of individuals selected in accordance with state policies. The panel will review and score the submittals. Firms ranked the highest will be invited to an oral interview. It is anticipated no fewer than three (3) or no more than seven (7) will be interviewed.
4. Oral Interviews. It is anticipated that oral interviews will be conducted during the week of 5/5/2025. Interviews will be conducted at: 3500 Marine St, Boulder CO, 80309.
The time for interviews is to be determined. Key personnel from the firm and major consultants who will be directly involved with the project should attend the interview. The interview panel will, in particular, be interested in knowing about the project approach proposed and in meeting the individuals who will act as the primary contacts with the [agency/institution].
https://aka.ms/JoinTeamsMeeting?omkt=en-US https://teams.microsoft.com/l/meetup-join/19%3ameeting_N2M1NGZhNmQtMGM5NC00ZTc5LWExZDEtNTgwZGUzM2NmMWQy%40thread.v2/0?context=%7b%22Tid%22%3a%223ded8b1b-070d-4629-82e4-c0b019f46057%22%2c%22Oid%22%3a%22d2925202-9487-4052-b8b4-edcff6aad8e6%22%7d tel:+17203720802,,952571694 tel:8337824222,,952571694 https://dialin.teams.microsoft.com/ae0abe46-b1d0-44c1-8dcc-8d6e8ea083eb?id=952571694 https://teams.microsoft.com/meetingOptions/?organizerId=d2925202-9487-4052-b8b4-edcff6aad8e6&tenantId=3ded8b1b-070d-4629-82e4-c0b019f46057&threadId=19_meeting_N2M1NGZhNmQtMGM5NC00ZTc5LWExZDEtNTgwZGUzM2NmMWQy@thread.v2&messageId=0&language=en-US https://dialin.teams.microsoft.com/usp/pstnconferencing https://support.office.com/en-us/article/join-a-meeting-in-teams-1613bb53-f3fa-431e-85a9-d6a91e3468c9 https://oit.colorado.edu/services/messaging-collaboration/microsoft-office-365/help/teams/accessibility
UCB Rev 10/2024
C. SCHEDULE
Following is a detailed schedule of events for the RFQ process and an outline of the schedule for the balance of the project.
Advertisement 4/10/2025 Mandatory Pre-submittal 4/14/2025 at 10AM Date Questions Due via Bidnet 4/17/2025 at 2PM Date Answers Issued via Bidnet 4/22/2025 at 2PM RFQ Submittal Due via Bidnet 4/25/2025 at 2PM Interview List Released via Bidnet 5/2/2025 at 2PM Oral Interviews (as scheduled) 5/5/2025 to 5/9/2025
Times will be determined based on submittals
Negotiation of A/E Contract 5/13/2025 to 5/23/2025 Contract Approval (projected) 6/15/2025 Anticipated A/E Professional Services – Start 7/1/2025 Anticipated Construction Services – Start/Finish 5/26/2026 to 7/31/2026
II. SUBMITTAL REQUIREMENTS
Firms will be judged not only on their past experience for the type of work involved, but also on their ability to address issues critical to the success of the project requirements outlined in this RFQ document. (Note that the primary focus of the prequalification evaluation will be the firm(s) capability and the primary focus of the oral interview will be the proposed Project Management Team members capabilities.)
Appendix C, Acknowledgement and Attestation Form must be fully completed and certified.
The following are elements that will be used to evaluate each firm's qualifications:
A. PROJECT TEAM
Identify the project principal, the project manager, key staff and sub-consultants. Present a brief discussion regarding how the team's qualifications and experience relate to the specific project.
Qualifications and relevant individual experience.
Unique knowledge of key team members relating to the project.
Experience on projects as a team.
Key staff involvement in project management and on-site presence.
Time commitment of key staff.
Qualifications and relevant sub-consultant experience.
B. FIRM/TEAM CAPABILITIES
Are the lines of authority and coordination clearly identified?
Are essential management functions identified?
Are the functions effectively integrated? (e.g., sub-consultants’ role delineated)?
Current and projected workload.
Note: Organization charts and graphs depicting your capacity may be included.
C. PRIOR EXPERIENCE
Use this portion of your submittal to describe relevant experiences with the project type described in this RFQ document and various services to be provided.
Experience of the key staff and firm with projects of similar scope and complexity.
Demonstrated success on past projects of similar scope and complexity.
References.
Buy Clean Colorado Experience
− Describe how Buy Clean Colorado has been incorporated into your projects in the past
Note: Include the name and current telephone number of the owner’s project manager for every project listed.
D. PROJECT APPROACH
For the project and services outlined in the RFQ document, describe how you plan to accomplish the following project control and management issues:
− Budget Methodology/Cost Control.
− Establish and maintain estimates of probable cost within owner's established budget.
− Control consultant contract costs − Coordinate value engineering activities
− Quality Control Methodology.
− Ensure State procedures are followed − Ensure University of Colorado Standards and Housing Facilities Services
Standards are followed − Improve energy efficiency through the use of an integrated design process, life cycle costing, the use of an energy standard (current OSA energy code) and the specification of energy efficient materials, systems, and equipment
− Reduce embodied carbon emissions by utilizing and submitting Environmental Product Declarations (EPDs) that meet the OSA’s maximum acceptable global warming potential (GWP) limits
− Ensure the project is designed for durability and maintainability − Schedule.
− Manage the required work to meet the established schedule
E. WORK LOCATION
Describe where the prime and sub-consultants will do the key work elements of this project.
− Proximity of firms office as it may affect coordination with the State's project manager and the potential project location.
− Firm's familiarity with the project area.
− Knowledge of the local labor and material markets.
[The rest of this page intentionally left blank]
Appendix A
PRELIMINARY SELECTION/EVALUATION FORM
ARCHITECT/ENGINEERING/CONSULTANT SERVICES
QUALIFICATION BASED SELECTION (This form is to be used in the first step, i.e. short listing, of an architectural/engineering/consulting services selection process.)
Evaluator #:_____________________________________ Date:_________________________ Name of Firm:_________________________________________________________________ Name of Project:_______________________________________________________________
RFQ REFERENCE
MINIMUM REQUIREMENTS Y ____ N ____
If the minimum requirements have not been met, specify the reason(s):
Acknowledgment and Attestation included: Y _____ N _____
SCORE (PROJECT SPECIFIC QUALIFICATIONS): Weight2 x Rating3 = Score
1. PROJECT TEAM1
− Qualifications and relevant individual experience. 1 x_____=____ − Unique knowledge of key team members relating to the project. 3 x_____=____ − Experience on projects as a team. 3 x_____=____ − Key staff involvement in project management and on-site presence. 1 x_____=____ − Time commitment of key staff. 2 x_____=____ − Qualifications and relevant subconsultant experience. 4 x_____=____
2. FIRM CAPABILITIES1
− Are the lines of authority and coordination clearly identified 1 x_____=____ − Are essential management functions identified? 1 x_____=____ − Are the functions effectively integrated (e.g., subconsultants’ roles delineated?) 3 x_____=____ − Current and projected work load. 2 x_____=____
3. PRIOR EXPERIENCE1
− Experience of the key staff and firm with projects of similar scope and complexity. 3 x_____=____
− Demonstrated success on past projects of similar scope and complexity. 3 x_____=____
− References. 1 x_____=____
UCB Rev 10/2024
− Buy Clean Colorado Experience 4 x_____=____
4. PROJECT APPROACH1
− Budget methodology/cost control. 5 x_____=____ − Quality control methodology. 5 x_____=____ − Schedule maintenance methodology. 5 x_____=____
5. WORK LOCATION1
− Proximity of firm’s office as it may affect coordination with the state's project manager and the potential project location. 1 x_____=____ − Firm's familiarity with the project area. 3 x_____=____ − Knowledge of the local labor and material markets. 5 x_____=____
TOTAL SCORE: ________4
NOTES:
1. Criteria: Agencies/Institutions are encouraged to include additional criteria that reflect unique characteristics of the project under each category to help determine the submitter’s overall qualifications.
2. Weights: Agency/Institutions to assign weights, using whole numbers, to all criteria on evaluation forms for inclusion into RFQ document and prior to evaluations.
3. Ratings: Evaluator to assess the strength of each firms qualifications and assign a numerical rating of 1 to 5 with 5 being the highest rating 0 is missing information. (Use whole numbers)
4. Total Score: Includes the sum of all criteria. Note: a passing score (as a percentage of the total points available) is optional and should be assigned by the agency/institution prior to evaluation.
Appendix A1
ORAL INTERVIEW SELECTION/EVALUATION FORM
ARCHITECTURAL/ENGINEERING/CONSULTANT SERVICES
QUALIFICATION BASED SELECTION (This form is to be used in the second step, i.e. oral interview, of an architectural/engineering/consulting services selection process.)
Evaluator #:_________________________________________ Date:_____________________ Name of Firm:_________________________________________________________________ Name of Project:_______________________________________________________________
SCORE (OVERALL QUALIFICATIONS)1: Weight2 x Rating3 = Score
1. PROJECT TEAM1 4 x _____ = _____
2. TEAM CAPABILITIES1 3 x _____ = _____
3. PRIOR EXPERIENCE1 5 x _____ = _____
4. PROJECT APPROACH1 2 x _____ = _____
5. WORK LOCATION1 1 x _____ = _____
TOTAL SCORE: ________4
1. Criteria: Agencies/Institutions are encouraged to include additional criteria that reflect unique characteristics of the project under each category to help determine the submitter’s overall qualifications.
2. Weights: Agency/Institutions to assign weights, using whole numbers, to all criteria on evaluation forms for inclusion into RFQ document and prior to evaluations.
3. Ratings: Evaluator to assess the strength of each firms qualifications and assign a numerical rating of 0 to 5 with 5 being the highest rating. (Use whole numbers), 0 is missing information.
4. Total Score: Includes the sum of all criteria. Note: a passing score (as a percentage of the total points available) is optional and should be assigned by the agency/institution prior to evaluation.
Appendix A2
FINAL RANKING MATRIX
QUALIFICATION BASED SELECTION
(Use this form to rank and determine the most qualified architectural/engineering/consulting services firm for both the preliminary and interview evaluations.)
FIRM
QUALIFICATIONS SCORE1
CUMULATIVE2
TOTAL SCORE
RANK3
EVAL
#1
EVAL
#2
EVAL
#3
EVAL
#4
EVAL
#5
EVAL
#6
1. Insert total score from each evaluator's PRELIMINARY SELECTION or INTERVIEW SELECTION/EVALUATION FORMS. The scores from the
Preliminary Selection process are not used to determine the final score or ranking unless there is a tie score during Phase 2.
2. Add all evaluators' total scores to determine the cumulative score. NOTE: Each firm's cumulative total score should be as a percentage of the total points available.
3. Rank all firms with the highest scoring firm being the most qualified.
Appendix B
ARCHITECT/ENGINEER/CONSULTANT CONTRACT
(AE SC-5.1, AE-CM/GC SC-5.2, Consultant SC-5.3)
Sample forms can be found at the following link:
https://osa.colorado.gov/state-buildings/project-management-policies-guidelines/contract-forms https://osa.colorado.gov/state-buildings/project-management-policies-guidelines/contract-forms https://osa.colorado.gov/state-buildings/project-management-policies-guidelines/contract-forms
Appendix C
ACKNOWLEDGMENT AND ATTESTATION FORM
(Partnership Format)
By responding to this RFQ, the respondent(s) certify that he/she has reviewed the contents of this RFQ and addenda, and has agreed that the terms and conditions are expressly acceptable without change or modification.
We certify and declare that the foregoing is true and correct.
Subscribed on at Date City
, State of
County State
1) Partner Signature
Typed Name:
2) Partner Signature
Notary: ______________________________________________ ______________ Date
Commission Expires: _____________________________________
Note: Add additional signatures if there are more than two partners.
(Sole Proprietorship Format)
By responding to this RFQ, the respondent(s) certify that he/she has reviewed the contents of this RFQ and addenda, and has agreed that the terms and conditions are expressly acceptable without change or modification.
We certify and declare that the foregoing is true and correct.
Subscribed on at Date
City
Respondent Date
Notary:
Date
Commission Expires:
(Joint Venture Format)
By responding to this RFQ, the respondent(s) certify that he/she has reviewed the contents of this RFQ and addenda, and has agreed that the terms and conditions are expressly acceptable without change or modification.
We certify and declare that the foregoing is true and correct.
Subscribed on at
Date City
1) Venture Partner Binding Signature Date
Typed Name
Type of Business Title
Witness Date
2) Venture Partner Binding Signature Date
Type of Business Title
Notes:
1. Add additional venture partners as necessary.
2. Witnesses of venture partners shall be corporate secretary for corporations, partners for partnerships, and notaries for sole proprietorships.
3. Attach venture agreement.
4. Type of business shall identify the venture partner as a corporation, venture, partnership, sole proprietorship, or other legal entity.
ACKNOWLEDGEMENT AND ATTESTATION FORM
By responding to these guidelines, the respondent(s) certify that he/she has reviewed the Agreement and its Exhibits contained herein, and is familiar with their terms and conditions and finds them expressly workable without change or modification.
I certify and declare that the foregoing is true and correct.
Subscribed on ________________________ at _________________________, Date City ____________________________, State of ____________________________, Applicant or Corporate Officer Signature Date
NOTE: Use full corporate name and affix corporate seal (if available).
(Seal)
Appendix D
SCOPE OF WORK
| UCB001328-WEB-Maintenance-2026 REQUEST FOR QUALIFICATIONS |
| FOR |
| A. Project Description/Minimum Requirements/Project Delivery |
| B. Selection Process |
| C. Schedule |
| II. SUBMITTAL REQUIREMENTS |
| A. Project Team |
| B. Firm Capabilities |
| C. Prior Experience |
| D. Project Approach |
| E. Work Location |
| Appendix A: Preliminary Selection/Evaluation Form |
| Appendix A1: Interview Selection/Evaluation Form |
| Appendix A2: Final Ranking Matrix |
| Appendix B: Architect/Engineer/Consultant Contract |
| Appendix C: Acknowledgement & Attestation Form |
| Appendix D: Scope of Work |
| I. INTRODUCTION |
| A. PROJECT DESCRIPTION |
| B. SELECTION PROCESS |
| C. SCHEDULE |
| II. SUBMITTAL REQUIREMENTS |
| A. PROJECT TEAM |
| C. PRIOR EXPERIENCE |
| D. PROJECT APPROACH |
E. WORK LOCATION