Thermal Battery Quali (Signed).pdf

PDF 896 KB Posted

Attached to
F-22 Thermal Batteries Federal contract opportunity
Solicitation number
FA821321R3039
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document outlines quality assurance requirements for two thermal battery components supporting the F-22 weapon system. Teledyne Risi, Inc. and Chemring Energitic Devices, Inc. will each provide 100 units of their respective components under solicitation FA821321R3039 issued by the Department of the Air Force Materiel Command Lifecycle Management Center. The Defense Contract Management Agency will inspect the manufacturers' processes and documentation at various hold points, including explosive weight verification, leak testing, x-ray examination, lot acceptance testing, and preparation for shipment. Additional oversight may be imposed as necessary. Delivery of the completed order is due by the final date indicated on the individual contract awards.

View the file

Other files for this federal contract opportunity

Other files attached to F-22 Thermal Batteries, newest first.
File Type Posted
Amendment FA281321R3039 001.pdf PDF
Solicitation FA281321R3039.pdf PDF
CDRLs 21-50107.pdf PDF
Form 1653.pdf PDF
Form 807- 015873591.pdf PDF
Form 807- 015155924.pdf PDF
ES7034 (Attachment 5).pdf PDF
SPI F01-515-5924.pdf PDF
SPI F01-587-3591.pdf PDF
FORM 158 FD2020-21-50107.pdf PDF
TransInstruction4.pdf PDF
SOW SPI.pdf PDF
JFQR F-22 Thermal Battery Master_Signed.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name

CAGE code

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor, at a minimum, shall allow DCMA to inspect the following points:

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend per comment section.

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.

Notify - N: By phone or email prior to action.

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer Signature

Rev Date: 5 May 2019

Sheet1

Text46: 29 June 2020
2020-06-29T10:21:48-0600
ROCHOLL.NOAH.SCOTT.1549493501
undefined_9: N
Text32: 9. Additional Requirements
undefined_8: M
Text31: 8. Shippers (DD250, Reports)
undefined_7: M
Text30: 7. AMMO Data Card Review
undefined_6: V
Text29: 6. Preparation for Shipment
undefined_5: W
Text28: 5. LAT
undefined_4: V
Text27: 4. LAT Sample Selection
undefined_3: V
Text26: 3. X-Ray/N-Ray
undefined_2: V
Text25: 2. Leak Test
undefined: V
Text36: 1. Explosive Weight

2. Verify gross leak and fine leak check are performed.

3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer

Text24: 1.Inspection
Part Number: 10000811-501 AND 6212100
DODIC: JM39
Text20:
Text19:
Part Number Line 2:
Contract No: 21-50107
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: F-22

File details come from the government source that posted it. Updated .