Attachment_A__-_Pricing_Sheet_Final.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Grounds Maintenance and Snow Removal Services Federal contract opportunity
Solicitation number
TFSAAFRW17CI0004
Issued by
Department of the Treasury Bureau of the Fiscal Service

About this file

Attachment A - Pricing Sheet in Excel format

View the file

Other files for this federal contract opportunity

Other files attached to Grounds Maintenance and Snow Removal Services, newest first.
File Type Posted
Amendment_00001.pdf PDF
RFP_TFSAAFRW17CI0004.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Grounds Maintenance- Base Year

ATTACHMENT A - Pricing Sheet
RFP - TFSAAFRW17CI0004 AFRH-W Grounds Maintenance Fixed-Price IDIQ Pricing
Base YearOption Year #1Option Year #2Option Year #3Option Year #4
ItemRequirement DescriptionGovernment Anticipated Annual Service NeedsCost Per One Service RequestGovernmernt Anticipated Annual Service NeedsCost Per One Service RequestGovernment Anticipated Annual Service NeedsCost Per One Service RequestGovernment Anticipated Annual Service NeedsCost Per One Service RequestGovernment Anticipated Annual Service NeedsCost Per One Service Request
Pristine Zone
Mowing/Edging (for entire area)Police the area removing debris in preparation of mowing; take precautions to prevent scalping, uneven mowing, rutting by equipment, damage to trees, shrubs, and irrigation system components; mow the entire zone to a height of no higher than 2" or higher if directed by the COR/ACOR; make repairs to any areas damaged by mowing; edge (not weedwack) all sidewalks, roads and flower beds to a depth of 1 inch and collect and properly dispose off site of debris/clippings in accordance with local, federal and state regulations.15-30Qty (1) $15-30Qty (1) $15-30Qty (1) $15-30Qty (1) $15-30Qty (1) $
Weed/Pest control (for entire area)Prepare the areas as required for application being used, remove all weeds, apply the most appropriate application in accordance with manufacture's recommendations to ensure area is weed and pest free from April 20 through the first killing frost, mark the area if required and return the area to its original condition.Qty (1) $
Fertilizing / lime / seeding (for entire area)Prepare the area for fertilizer application, apply the appropriate fertilizer to support healthy, green grass / ensure no bald spots from NLT April 20 through the first killing frost and area has a consistent appearance, mark the area if required and return the area to its original conditionQty (1) $
Weed/Pest control (for entire area)Qty (1)2-8Qty (1) $2-8Qty (1) $2-8Qty (1) $2-8Qty (1) $2-8Qty (1) $
Fertilizing / lime / seeding (for entire area)Prepare the area for fertilizer application, apply the appropriate fertilizer to support healthy, green grass / ensure no bald spots from NLT April 20 through the first killing frost and area has a consistent appearance, mark the area if required and return the area to its original condition2-5Qty (1) $2-5Qty (1) $2-5Qty (1) $2-5Qty (1) $2-5Qty (1) $
Aerate / Seed (for entire area)Prepare the area for aeration, detaching and seed application, aerate as recommended by seed manufacturer, overseed area to eliminate bald spots and water per manufacturer's recommendations.1-3Qty (1) $1-3Qty (1) $1-3Qty (1) $1-3Qty (1) $1-3Qty (1) $
Rut Management (per sq. ft.)Fill in ruts with soil which supports the growth of sod, pack down, and if required, protect area from heavy rains until soil can settle.0-20 sq. ft.Qty (1) Per Sq Ft: $0-20 sq. ft.Qty (1) Per Sq Ft: $0-20 sq. ft.Qty (1) Per Sq Ft: $0-20 sq. ft.Qty (1) Per Sq Ft: $0-20 sq. ft.Qty (1) Per Sq Ft: $
Sod Replacement (per sq. ft.)Prepare the area for laying sod, lay sod using industry standards with sod which consists of 90 to 95 percent tall fescue varieties blended with 5 to 10 percent Kentucky bluegrass varieties and water areas to promote growth.5-50 sq. ft.Qty (1) Per Sq Ft: $5-50 sq. ft.Qty (1) Per Sq Ft: $5-50 sq. ft.Qty (1) Per Sq Ft: $5-50 sq. ft.Qty (1) Per Sq Ft: $5-50 sq. ft.Qty (1) Per Sq Ft: $
Flower / Shrub Bed Maintenance (for all beds within zone)Plant and maintain flower / shrub beds with-in the area (including Eagle Gate, Band Stand Garden, Flag Pole and Sherman, Sheridan & Scott buildings), removal of all weeds beds, enhance with soil amendments to ensure healthy, blooming plants, haul away all debris and clean sidewalks / surrounding areas. Contractor not required to supply flowers for flower beds. (See Attachment C for flower bed locations)2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $
Flower/Shrub Garden Mulching (per all beds within zone)Mulch flower / shrub beds with treated mulch which matches existing color to a depth of at least 3 inches for shrub beds and 2 inches for flower beds, ensure no dirt spots, remove debris and clean sidewalks / surrounding areas. (See Attachment C for location)2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $
Irrigation System Parts (mark up)Purchase parts in the most cost effective way and purchase only parts approved by COR/ACORN/AMarkup Percentage:N/AMarkup Percentage:N/AMarkup Percentage:N/AMarkup Percentage:N/AMarkup Percentage:
Irrigation System Service (hourly rate)Provide estimated hours to repair / maintain irrigation system, make repairs to Irrigation System within approved estimated hours and guarantee operation of irrigation system for a minimum of 60 days2-8 hoursQty (1) Hourly Rate: $2-8 hoursQty (1) Hourly Rate: $2-8 hoursQty (1) Hourly Rate: $2-8 hoursQty (1) Hourly Rate: $2-8 hoursQty (1) Hourly Rate: $
Tree Pruning (hourly rate)Provide estimated hours to complete designated pruning, prune trees as directed by COR/ACOR, collect and properly dispose of leaves / branches / debris off-site in accordance with local, federal and state regulations.0-20 hoursQty (1) Hourly Rate: $0-20 hoursQty (1) Hourly Rate: $0-20 hoursQty (1) Hourly Rate: $0-20 hoursQty (1) Hourly Rate: $0-20 hoursQty (1) Hourly Rate: $
Leaf Blowing X 12 (per all areas in zone)Remove and disposal of all nature debris (tree limbs, dry brush, rodent habitat, animal carcasses and man-made debris; remove all leaves from turf, buildings, sidewalks, entryways, stairwells, Sherman moot, curbs, roads and flower / shrub beds; ensure all storm drains are clear and collect and properly dispose of leaves / debris off-site in the spring in accordance with local, federal and state regulations or if requested by the COR/ACOR collect and spread leaves over the Community Garden area. (See Attachment D for Size of Zone area)4-16Qty (1) $4-16Qty (1) $4-16Qty (1) $4-16Qty (1) $4-16Qty (1) $
Building Vegetation Removal (for all buildings within zone)Remove vegetation growing on and surrounding building, use pest control sprays as appropriate to prevent future growth and collects / properly disposes of debris off-site in accordance with local, federal and state regulations.1-6Qty (1) $1-6Qty (1) $1-6Qty (1) $1-6Qty (1) $1-6Qty (1) $
Good Zone
Mowing/Edging (for entire area)Police the area removing debris in preparation of mowing; take precautions to prevent scalping, uneven mowing, rutting by equipment, damage to trees and shrubs; mow the entire zone to a height of no higher than 3" or higher if directed by the COR/ACOR; and properly dispose off site of debris/clippings in accordance with local, federal and state regulations.5-20Qty (1) $5-20Qty (1) $5-20Qty (1) $5-20Qty (1) $5-20Qty (1) $
Fertilizing / lime / seeding (for entire area)Prepare the area for fertilizer application, applying the appropriate fertilizer per manufacture's recommendation to support healthy, green grass / ensure no bald spots from NLT April 20 through the first killing frost and area has a consistent appearance, marking the area if required and returning the area to its original condition1-3Qty (1) $1-3Qty (1) $1-3Qty (1) $1-3Qty (1) $1-3Qty (1) $
Rut Management (per sq. ft.)Fill in ruts with soil which supports the growth of sod, pack down, and if required, protect area from heavy rains until soil can settle.0-10 sq. ft.Qty (1) Per Sq Ft: $0-10 sq. ft.Qty (1) Per Sq Ft: $0-10 sq. ft.Qty (1) Per Sq Ft: $0-10 sq. ft.Qty (1) Per Sq Ft: $0-10 sq. ft.Qty (1) Per Sq Ft: $
Flower / Shrub Bed Maintenance (for all beds within zone)Plant and maintain flower / shrub beds with-in the area, removal of all weeds beds, enhance with soil amendments to ensure healthy, blooming plants, haul away all debris and clean sidewalks / surrounding areas. Contractor not required to supply flowers for flower beds. (See Attachment C for flower bed locations)2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $
Flower/Shrub Garden Mulching (for all beds within zone)Mulch flower / shrub beds with treated mulch which matches existing color to a depth of at least 3 inches for shrub beds and 2 inches for flower beds, ensure no dirt spots, remove debris and clean sidewalks / surrounding areas. (See Attachment C for location)1-2Qty (1) $1-2Qty (1) $1-2Qty (1) $1-2Qty (1) $1-2Qty (1) $
Manual watering of flower / shrub beds (ordered as part of another service)Set up manual watering system to water flower / shrub bed from standpipe located in the Sheridan Plaza area, ensure beds are properly irrigated to maintain healthy plants, remove system and return areas to their original condition.2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $
Leaf Blowing (for entire area)Remove and disposal of all nature debris (tree limbs, dry brush, rodent habitat, animal carcasses and man-made debris; remove all leaves from turf, buildings, sidewalks, entryways, stairwells, Sherman moot, curbs, roads and flower / shrub beds; ensure all storm drains are clear and collect and properly dispose of leaves / debris off-site in the spring in accordance with local, federal and state regulations or if requested by the COR/ACOR collect and spread leaves over the Community Garden area. (See Attachment D for Size of Zone area)4-16Qty (1) $4-16Qty (1) $4-16Qty (1) $4-16Qty (1) $4-16Qty (1) $
Building Vegetation Removal (for all buildings within zone)Remove vegetation growing on and surrounding building, use pest control as appropriate to prevent future growth and collects / properly disposes of debris off-site in accordance with local, federal and state regulations.1-6Qty (1) $1-6Qty (1) $1-6Qty (1) $1-6Qty (1) $1-6Qty (1) $
School Zone
Mowing/Edging (for entire area)Police the area removing debris in preparation of mowing; take precautions to prevent scalping, uneven mowing, rutting by equipment, damage to trees, shrubs, and irrigation system components; mow the entire zone to a height of no higher than 2" or higher if directed by the COR/ACOR; make repairs to any areas damaged by mowing; edge (not weedwack) all sidewalks, roads and flower beds to a depth of 1 inch and collect and properly dispose off site of debris/clippings in accordance with local, federal and state regulations.15-30Qty (1) $15-30Qty (1) $15-30Qty (1) $15-30Qty (1) $15-30Qty (1) $
Weed/Pest control (for entire area)Prepare the areas as required for application being used, remove all weeds, apply the most appropriate application in accordance with manufacture's recommendations to ensure area is weed and pest free from April 20 through the first killing frost, mark the area if required and return the area to its original condition.2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $
Fertilizing / lime / seeding (for entire area)Prepare the area for fertilizer application, apply the appropriate fertilizer to support healthy, green grass / ensure no bald spots from NLT April 20 through the first killing frost and area has a consistent appearance, mark the area if required and return the area to its original condition2-5Qty (1) $2-5Qty (1) $2-5Qty (1) $2-5Qty (1) $2-5Qty (1) $
Rut Management (per sq. ft.)Fill in ruts with soil which supports the growth of sod, pack down, and if required, protect area from heavy rains until soil can settle.0-20 sq. ftQty (1) Per Sq Ft: $0-20 sq. ftQty (1) Per Sq Ft: $0-20 sq. ftQty (1) Per Sq Ft: $0-20 sq. ftQty (1) Per Sq Ft: $0-20 sq. ftQty (1) Per Sq Ft: $
Sod Replacement (per sq. ft.)Prepare the area for laying sod, lay sod using industry standards with sod which consists of 90 to 95 percent tall fescue varieties blended with 5 to 10 percent Kentucky bluegrass varieties and water areas to promote growth.0-20 sq. ftQty (1) Per Sq Ft: $0-20 sq. ftQty (1) Per Sq Ft: $0-20 sq. ftQty (1) Per Sq Ft: $0-20 sq. ftQty (1) Per Sq Ft: $0-20 sq. ftQty (1) Per Sq Ft: $
Flower / Shrub Bed Maintenance (for all beds within zone)Plant and maintain flower / shrub beds with-in the area (including Eagle Gate, Band Stand Garden, Flag Pole and Sherman, Sheridan & Scott buildings), removal of all weeds beds, enhance with soil amendments to ensure healthy, blooming plants, haul away all debris and clean sidewalks / surrounding areas. Contractor not required to supply flowers for flower beds. (See Attachment C for flower bed locations)2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $
Flower/Shrub Garden Mulching (per all beds within zone)Mulch flower / shrub beds with treated mulch which matches existing color to a depth of at least 3 inches for shrub beds and 2 inches for flower beds, ensure no dirt spots, remove debris and clean sidewalks / surrounding areas. (See Attachment C for location)1-5Qty (1) $1-5Qty (1) $1-5Qty (1) $1-5Qty (1) $1-5Qty (1) $
Tree Pruning (per hour)Provide estimated hours to complete designated pruning, prune trees as directed by COR/ACOR, collect and properly dispose of leaves / branches / debris off-site in accordance with local, federal and state regulations.0-6Qty (1) Hourly Rate $0-6Qty (1) Hourly Rate $0-6Qty (1) Hourly Rate $0-6Qty (1) Hourly Rate $0-6Qty (1) Hourly Rate $
Leaf Blowing X 12 (per all areas in zone)Remove and disposal of all nature debris (tree limbs, dry brush, rodent habitat, animal carcasses and man-made debris; remove all leaves from turf, buildings, sidewalks, entryways, stairwells, Sherman moot, curbs, roads and flower / shrub beds; ensure all storm drains are clear and collect and properly dispose of leaves / debris off-site in the spring in accordance with local, federal and state regulations or if requested by the COR/ACOR collect and spread leaves over the Community Garden area. (See Attachment D for Size of Zone area)4-16Qty (1) Hourly Rate $4-16Qty (1) Hourly Rate $4-16Qty (1) Hourly Rate $4-16Qty (1) Hourly Rate $4-16Qty (1) Hourly Rate $
Basic Zone
Mowing X 12Police the area removing debris in preparation of mowing; take precautions to prevent damage to trees and shrubs and mow the entire zone to a height of no higher than 2" or higher if directed by the COR/ACOR.0-4Qty (1) $0-4Qty (1) $0-4Qty (1) $0-4Qty (1) $0-4Qty (1) $
Debris RemovalPolice the grounds and remove debris which could become a hazard; dispose of all nature debris (tree limbs, dry brush, rodent habitat, animal carcasses) in area designated in low upkeep zone, collect and dispose of man-made debris off-site in accordance with local, federal and state regulations.0-4Qty (1) $0-4Qty (1) $0-4Qty (1) $0-4Qty (1) $0-4Qty (1) $
Vegetation Growth on Building X 2Remove vegetation growing on and surrounding building, use pest control as appropriate to prevent future growth and collects / properly disposes of debris off-site in accordance with local, federal and state regulations.1-3Qty (1) $1-3Qty (1) $1-3Qty (1) $1-3Qty (1) $1-3Qty (1) $
Green Roofs/ Courtyard
Flower / Shrub Bed Maintenance (for all beds within zone)Plant and maintain flower / shrub beds with-in the area, removal of all weeds beds, enhance with soil amendments to ensure healthy, blooming plants, haul away all debris and clean sidewalks / surrounding areas.2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $
Debris Removal / Leaf Blowing (for entire area)Remove and disposal of all nature debris (tree limbs, dry brush, rodent habitat, animal carcasses and man-made debris; , remove all leaves green roof and courtyard, ensure all storm drains are clear and collect and properly dispose of leaves / debris off-site in accordance with local, federal and state regulations.1-6Qty (1) $1-6Qty (1) $1-6Qty (1) $1-6Qty (1) $1-6Qty (1) $
Flower/Shrub Garden Mulching (for all beds within zone)Mulch flower / shrub beds to a depth of at least 3 inches for shrub beds and 2 inches for flower beds, ensure no dirt spots, remove debris and clean sidewalks / surrounding areas.1-2Qty (1) $1-2Qty (1) $1-2Qty (1) $1-2Qty (1) $1-2Qty (1) $
Drip Irrigation System Parts (percentage of mark up)Purchase parts in the most cost effective way and purchase only parts approved by COR/ACOR1-2Markup Percentage:1-2Markup Percentage:1-2Markup Percentage:1-2Markup Percentage:1-2Markup Percentage:
Drip Irrigation System Service (hourly rate)Provide an estimated hours to repair system, make repairs to Irrigation System within approved estimated hours and guarantee operation of irrigation system for a minimum of 60 days0-6 hoursQty (1) Hourly Rate: $0-6 hoursQty (1) Hourly Rate: $0-6 hoursQty (1) Hourly Rate: $0-6 hoursQty (1) Hourly Rate: $0-6 hoursQty (1) Hourly Rate: $
Community Gardens
Prepare for PlantingPrepare area by removing debris, rotatill garden area to a depth of at least 2 feet and apply fertilizer according to manufacturer's recommendations to support gardening of vegables and flowers.1Qty (1) $1Qty (1) $1Qty (1) $1Qty (1) $1Qty (1) $
Winterize before first frostPrepare area by removing debris and plow / disc the garden area to a depth of at least 18 inches to incorporate leaves for fertilization.1Qty (1) $1Qty (1) $1Qty (1) $1Qty (1) $1Qty (1) $
MowingPolice area in preparation of mowing, mow 2 ft wide path around the perimeter of the garden ensuring clippings and other debris do not enter the garden area, mow a 2 ft. wide path from the roadway and sheds to the garden to provide safe access to the gardens during the growing season (AFRH will mark the access path); and collect and properly dispose of all debris / clippings off-site in accordance with local, federal and state regulations.1-5Qty (1) $1-5Qty (1) $1-5Qty (1) $1-5Qty (1) $1-5Qty (1) $
Softball Field
MowingPolice the area removing debris in preparation of mowing; mow the entire field to the height specified by the COR/ACOR, and properly dispose off site of debris/clippings in accordance with local, federal and state regulations.3-7Qty (1) $3-7Qty (1) $3-7Qty (1) $3-7Qty (1) $3-7Qty (1) $
Resurface Softball InfieldRemove large rocks and debrise and resurface infield area to prepare for community softball season.1Qty (1) $1Qty (1) $1Qty (1) $1Qty (1) $1Qty (1) $
Infield MaintenancePrepare infield, remove large rocks, weed and grass in designated infield and drag infield to provide a softball infield o hold community softball games.1-5Qty (1) $1-5Qty (1) $1-5Qty (1) $1-5Qty (1) $1-5Qty (1) $
Perimeter A
MowingPolice the area removing debris in preparation of mowing; take precautions to prevent damage to trees and shrubs and mow the entire zone to a height of no higher than 2" or higher if directed by the COR/ACOR.5-10Qty (1) $5-10Qty (1) $5-10Qty (1) $5-10Qty (1) $5-10Qty (1) $
Debris RemovalPolice the grounds and remove debris which could become a hazard; dispose of all nature debris (tree limbs, dry brush, rodent habitat, animal carcasses) in area designated in low upkeep zone, collect and dispose of man-made debris off-site in accordance with local, federal and state regulations.1-3Qty (1) $1-3Qty (1) $1-3Qty (1) $1-3Qty (1) $1-3Qty (1) $
Weed ControlApply pest control materials per manufacturer's recommendations appropriate to prevent growth of weeds and mark area if appropriate.1-2Qty (1) $1-2Qty (1) $1-2Qty (1) $1-2Qty (1) $1-2Qty (1) $
Perimeter B
Weed ControlApply pest control materials per manufacturer's recommendations appropriate to prevent growth of weeds and mark area if appropriate.0-2Qty (1) $0-2Qty (1) $0-2Qty (1) $0-2Qty (1) $0-2Qty (1) $
Low Upkeep Zone
BushwhackingPolice the grounds to prepare for bushwhacking, bushwhack area and properly dispose of man-made debris in accordance with local, federal and state regulations.0-3Qty (1) $0-3Qty (1) $0-3Qty (1) $0-3Qty (1) $0-3Qty (1) $
Pasture Zone
BushwhackingPolice the grounds to prepare for bushwhacking, bushwhack area and properly dispose of man-made debris in accordance with local, federal and state regulations.0-3Qty (1) $0-3Qty (1) $0-3Qty (1) $0-3Qty (1) $0-3Qty (1) $
Historic Canal
Debris ClearingPolice canal, remove debris from canal and on 1 foot of each side to ensure water can flow throughout the full length of the canal, dispose of natural material in the designated area of the low up-keep zone and properly dispose of man-made material in accordance with local, federal and state regulations.2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $2-6Qty (1) $
Tree Removal/Replacement (Per diameter)
>1.5"Removal of tree and replacement with a minimum approved 15 Gal (per individual tree removal)0-5Qty (1) $0-5Qty (1) $0-5Qty (1) $0-5Qty (1) $0-5Qty (1) $
1.5"-3.0"Removal of tree and replacement with a minimum approved 15 Gal (per individual tree removal)0-6Qty (1) $0-6Qty (1) $0-6Qty (1) $0-6Qty (1) $0-6Qty (1) $
3.1" - 6"Removal of tree and replacement with a minimum approved 15 Gal (per individual tree removal)0-7Qty (1) $0-7Qty (1) $0-7Qty (1) $0-7Qty (1) $0-7Qty (1) $
6.1" - 12"Removal of tree and replacement with a minimum approved 15 Gal (per individual tree removal)0-8Qty (1) $0-8Qty (1) $0-8Qty (1) $0-8Qty (1) $0-8Qty (1) $
12.1" - 18"Removal of tree and replacement with a minimum approved 15 Gal (per individual tree removal)0-3Qty (1) $0-3Qty (1) $0-3Qty (1) $0-3Qty (1) $0-3Qty (1) $
18.1" - 24"Removal of tree and replacement with a minimum approved 15 Gal (per individual tree removal)0-4Qty (1) $0-4Qty (1) $0-4Qty (1) $0-4Qty (1) $0-4Qty (1) $
24.1" - 30"Removal of tree and replacement with a minimum approved 15 Gal (per individual tree removal)0-5Qty (1) $0-5Qty (1) $0-5Qty (1) $0-5Qty (1) $0-5Qty (1) $
30.1" - 36Removal of tree and replacement with a minimum approved 15 Gal (per individual tree removal)0-6Qty (1) $0-6Qty (1) $0-6Qty (1) $0-6Qty (1) $0-6Qty (1) $
36.1" - 42"Removal of tree and replacement with a minimum approved 15 Gal (per individual tree removal)0-2Qty (1) $0-2Qty (1) $0-2Qty (1) $0-2Qty (1) $0-2Qty (1) $
42.1" - 48"Removal of tree and replacement with a minimum approved 15 Gal (per individual tree removal)0-2Qty (1) $0-2Qty (1) $0-2Qty (1) $0-2Qty (1) $0-2Qty (1) $
Over 48.1"Removal of tree and replacement with a minimum approved 15 Gal (per individual tree removal)0-1Qty (1) $0-1Qty (1) $0-1Qty (1) $0-1Qty (1) $0-1Qty (1) $
Other IDIQ Work
Non-emergency workOther Non-emergency IDIQ work requested for Campus Beautification or Upgrade (hourly rate per employee)350 HoursQty (1) Hourly Rate: $350 HoursQty (1) Hourly Rate: $350 HoursQty (1) Hourly Rate: $350 HoursQty (1) Hourly Rate: $350 HoursQty (1) Hourly Rate: $
Emergency workOther Emergency IDIQ work requested to ensure campus is operational at all times (hourly rate per employee)150 HoursQty (1) Hourly Rate: $150 HoursQty (1) Hourly Rate: $150 HoursQty (1) Hourly Rate: $150 HoursQty (1) Hourly Rate: $150 HoursQty (1) Hourly Rate: $

Snow Removal Base Year Snow Removal Fixed-Price IDIQ Pricing

Base YearOption #1Option #2Option #3Option #4
Priority 1 AreaCost Per ServiceEstimated # Each YearCost Per ServiceEstimated # Each YearCost Per ServiceEstimated # Each YearCost Per ServiceEstimated # Each YearCost Per ServiceEstimated # Each Year
Pre-Treatment (per each service)
Sidewalks & Building Entrances1010101010
Paved Surfaces88888
Clearing/Shoveling/Plowing (per each snow event)
Sidewalks & Entrance ways
Under 2"1010101010
2.1-3"1010101010
3.1-6"66666
6.1-10"66666
10.1-18"22222
>18.122222
Paved Surfaces
Under 2"1010101010
2.1-3"1010101010
3.1-6"66666
6.1-10"66666
10.1-18"22222
>18.122222
Post Treatment (per each service)
Sidewalks & Entrances1010101010
Paved Surfaces88888
Priority 2 AreaCost Per ServiceEstimated # Each YearCost Per ServiceEstimated # Each YearCost Per ServiceEstimated # Each YearCost Per ServiceEstimated # Each YearCost Per ServiceEstimated # Each Year
Pre-Treatment (per each service)
Sidewalks & Building Entrances101010$0.0010$0.0010
Paved Surfaces101010$0.0010$0.0010
Clearing/Shoveling/Plowing (per each snow event)
Sidewalks & Entrance ways
Under 2"1010101010
2.1-3"1010101010
3.1-6"66666
6.1-10"66666
10.1-18"22222
>18.122222
Paved Surfaces
Under 2"1010101010
2.1-3"1010101010
3.1-6"66666
6.1-10"66666
10.1-18"22222
>18.122222
Post Treatment (per each service)
Sidewalks & Entrances1010101010
Paved Surfaces1010101010
School ZoneCost Per ServiceEstimated #Cost Per ServiceEstimated #Cost Per ServiceEstimated #Cost Per ServiceEstimated #Cost Per ServiceEstimated #
Pre-Treatment (per each service)
Sidewalks & Building Entrances1010101010
(Paved surfaces in other zones)
Clearing/Shoveling/Plowing (per each snow event)
Sidewalks & Entrance ways
Under 2"1010101010
2.1-3"1010101010
3.1-6"66666
6.1-10"66666
10.1-18"22222
>18.122222
(Paved surfaces in other zones)
Post Treatment (per each service)
Sidewalks & Entrances1010101010
(Paved surfaces in other zones)
Area Outside Eagle GateCost Per ServiceEstimated # Each YearCost Per ServiceEstimated # Each YearCost Per ServiceEstimated # Each YearCost Per ServiceEstimated # Each YearCost Per ServiceEstimated # Each Year
Clearing/Shoveling/Plowing (per each snow event)
Sidewalks & Entrance ways
Under 2"N/AN/AN/AN/AN/A
2.1-3"N/AN/AN/AN/AN/A
3.1-6"66666
6.1-10"22222
10.1-18"22222
>18.122222
Snow Removal MaterialsCost per ItemEstimated #Cost per ItemEstimated #Cost per ItemEstimated #Cost per ItemEstimated #Cost per ItemEstimated #
Road Salt (per ton)6060606060
Pellet Salt (sidewalk) (per pallet)55555
Sand (per ton)4040404040

File details come from the government source that posted it. Updated .