Technical Specifications.pdf

PDF 3 MB Posted

Attached to
Wrangell Ranger District Complex HVAC Phase I Federal contract opportunity
Solicitation number
1240BJ21R0003
Issued by
Department of Agriculture Forest Service

About this file

This is a solicitation for HVAC renovation services at the Wrangell Ranger District Complex in Alaska. The USDA Forest Service is seeking removal and replacement of boilers and heating systems in several buildings. Optional items include replacing electrical panels. Drawings depict the entire multi-phase project, but this solicitation is only for Phase 1. The work is set aside for small businesses. Proposals are due by June 25, 2021 and must be submitted electronically to the specified email address. Award dates are not provided.

View the file

Other files for this federal contract opportunity

Other files attached to Wrangell Ranger District Complex HVAC Phase I, newest first.
File Type Posted
Amendment 001_w_Attachments.pdf PDF
Drawings_WRG HVAC_Final.pdf PDF
Wage Determination.pdf PDF
1240BJ21R0003 Solicitation.pdf PDF
2_16_BAA DF Nonavailability_012821.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wrangell Compound HVAC Renovation Final Construction Documents Submittal

May 19, 2021

Corporate Office: 500 W 27th Avenue, Suite A, Anchorage, AK 99503 Branch Offices: Wilsonville OR; Kodiak AK; Tampa FL

Tel. (877) 844-5264; E-mail: mail@bce-ak.com; Web site: www.bce-ak.com

WrangellCompoundHVACRenovation
TongassNationalForest

FINAL CONSTRUCTION DOCUMENTS

SPECIFICATIONS

USDA Forest Service Wrangell Compound HVAC Renovation Project Specifications

05/14/2021 000110 Table of Contents Page 1 of 3

SECTION 000110

TABLE OF CONTENTS

DIVISION 00 - BIDDING AND CONTRACT REQUIREMENTS

TO BE PROVIDED BY FOREST SERVICE

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 011000 SUMMARY OF WORK

SECTION 011400 WORK AREA RESTRICTIONS

SECTION 012300 OPTIONS

SECTION 012500 SUBSTITUTION PROCEDURES

SECTION 012900 SCHEDULE OF VALUES

SECTION 013100 PROJECT MANAGEMENT AND COORDINATION

SECTION 013200 CONSTRUCTION PROGRESS DOCUMENTATION

SECTION 013300 SUBMITTAL PRODECURES

SECTION 014000 QUALITY REQUIREMENTS

SECTION 015000 TEMPORARY FACILITIES AND CONTROLS

SECTION 015300 PROTECTION AND RESTORATION OF EXISTING FACILITIES

SECTION 016000 PRODUCT REQUIREMENTS

SECTION 017329 CUTTING AND PATCHING

SECTION 017423 FINAL CLEAN-UP

SECTION 017700 CLOSEOUT PROCEDURES

SECTION 017823 OPERATIONS AND MAINTENANCE PROCEDURES

SECTION 017839 PROJECT RECORD DOCUMENTS

SECTION 017900 DEMONSTRATION AND TRAINING

SECTION 019133 COMMISSIONING

DIVISION 02 – EXISTING CONDITIONS

SECTION 023000 EARTHWORK

SECTION 024119 SELECTIVE DEMOLITION

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

SECTION 062000 FINISH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

SECTION 072100 THERMAL INSULATION

SECTION 072500 WEATHER BARRIERS

SECTION 076200 SHEET METAL FLASHING AND TRIM

SECTION 078400 FIRESTOPPING

SECTION 079200 JOINT SEALANTS

05/14/2021 000110 Table of Contents Page 2 of 3

DIVISION 08 - OPENINGS

SECTION 083100 ACCESS DOORS AND PANELS

DIVISION 09 - FINISHES

SECTION 092500 GYPSUM BOARD WALL

SECTION 095100 SUSPENDED ACOUSTICAL CEILINGS

SECTION 099120 INTERIOR AND EXTERIOR PAINT

DIVISION 23 – HEATING VENTILATION AIR CONDITIONING/MECHANICAL

SECTION 230500 COMMON WORK RESULTS FOR HVAC

SECTION 230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

SECTION 230517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING

SECTION 230518 ESCUTCHEONS FOR HVAC PIPING

SECTION 230548 VIBRATION AND SEISMIC CONTROLS FOR HVAC

SECTION 230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION 230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

SECTION 230713 DUCT INSULATION

SECTION 233113 METAL DUCTS

SECTION 233300 AIR DUCT ACCESSORIES

SECTION 233713 AIR INLETS AND OUTLETS

SECTION 237223.13 PACKAGED INDOOR HEAT WHEEL ENERGY RECOVERY UNITS

SECTION 238129 AIR-COOLED, MULTI-EVAPORATOR VARIABLE

CAPACITY HVAC SYSTEMS

SECTION 238239 PROPELLER UNIT HEATERS

DIVISION 26 - ELECTRICAL

SECTION 260010 GENERAL TECHNICAL PROVISIONS

SECTION 260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND

CABLES

SECTION 260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION 260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION 260533 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION 260574 ELECTRICAL ARC FLASH ANALYSIS & SHORT CIRCUIT STUDY

SECTION 260912 POWER MONITORING SYSTEMS

SECTION 260914 SPLIT CORE CURRENT TRANSFORMERS

SECTION 260915 RTD TEMPERATURE SENSORS

SECTION 260916 SMART CT SUB METERS

SECTION 260917 MONITORED PARAMETERS

SECTION 260919 COMMISSIONING

SECTION 262416 PANELBOARDS

SECTION 262713 ELECTRICITY METERING

05/14/2021 000110 Table of Contents Page 3 of 3

SECTION 262726 WIRING DEVICES

SECTION 262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION 264313 SURGE PROTECTIVE DEVICES

END OF SECTION 000110

05/14/2021 011000 Summary of Work Page 1 of 4

SECTION 011000

SUMMARY OF WORK

1. PART 1 – GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.02 PROJECT INFORMATION

A. Project title: Wrangell Compound HVAC Renovations.

B. The project is located at Wrangell Ranger District compound at 525 Bennett Street, Wrangell, Alaska, approximately 80 miles northwest of Ketchikan. The compound includes a 9,400 SF two-story office building, a 4,200 SF warehouse and shop, and a 3,000 SF bunkhouse.

1.03 PROJECT BACKGROUND

A. Mechanical systems for all three building were installed in 1986. The office building had a new addition in 1999 and the mechanical system was retrofitted to include the addition. Piping for the new section was added and new pumps were installed.

B. The mechanical systems include heating only. There are no central ventilation or cooling systems in any of the buildings. Warehouse workshop does not have a central sawdust collection system.

C. Heating systems use oil fuel with two external tanks. One oil tank serves the office and the warehouse and the other serves the bunkhouse boiler. There are no oil leaks.

D. Single pipe hot water heating system in the Office Building is inefficient; it overheats the upper floor and provides uneven heating for the lower floor.

E. Buildings do not have redundant heating sources.

F. Office Building overheats in the summer.

G. Heating systems in all three buildings are at the end of their operational life and require new high efficiency systems.

1.04 PROJECT SCOPE BASE BID

A. Renovate heating system at the office building:

1. Remove the hydronic heating system including but not limited to boilers, chimney, pumps, piping, heating units, controls and appurtenances.

2. Purge and remove the fuel oil piping and appurtenances.

3. Provide five multi-zone heat pump systems consisting of outdoor units, refrigerant piping, indoor units, power and controls.

4. Provide electric radiant heaters and controls in smaller rooms.

05/14/2021 011000 Summary of Work Page 2 of 4

1.05 PROJECT SCOPE OPTION BID ITEMS

A. Option Item 1 – Renovate heating system at the bunkhouse:

1. Remove the hydronic heating system including but not limited to boilers, pumps, piping, heating units, controls and appurtenances.

2. Purge and remove the fuel oil system, including aboveground tank, piping, containments, and appurtenances.

3. Purge below ground piping.

4. Provide one multi-zone heat pump system consisting of outdoor units, refrigerant piping, indoor units, power and controls.

5. Provide electric radiant heaters and controls in smaller rooms.

B. Option Item 2 – Renovate heating system at the warehouse:

1. Remove the hydronic heating system including but not limited to boilers, pumps, piping, heating units, controls and appurtenances.

2. Purge and remove the fuel oil system, including aboveground tank, piping, containments, and appurtenances.

3. Purge below ground piping to the office and warehouse and abandon.

4. Provide two multi-zone heat pump systems consisting of outdoor units, refrigerant piping, indoor units, power and controls.

5. Provide electric unit heaters and controls in smaller rooms.

C. Option Item 3 – Install ventilation system at the office building:

1. Relocate the sprinkler header and service sink in the mechanical room.

2. Remove the exterior wall to install the heat recovery unit and reconstruct it.

3. Install a ventilation system consisting of heat recovery unit HRU-2, louvers, dampers, ductwork, diffusers, grilles and controls.

4. Design and provide structural reinforcement of the existing floor framing as required to support HRU-2.

D. Option Item 4 – Replace electrical panels due to code violations.

E. Option Item 5 – Replace obsolete electrical panels.

F. Option Item 6 – Install advance meter system at the office building.

1.06 USE OF PREMISES

A. General: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. A staging area will be designated for the Contractor’s use. Its location will be coordinated with the Government.

C. Driveways, Walkways and Entrances: Keep driveways, loading areas, and entrances serving premises clear and available to Wrangell Compound’s employees and guests, and to emergency vehicles at all times. Do not use these areas for parking or for storage of materials.

05/14/2021 011000 Summary of Work Page 3 of 4

1. Schedule deliveries to minimize use of driveways and entrances by construction operations.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

D. Condition of Existing Building: Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

E. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.

1.07 COORDINATION WITH OCCUPANTS

A. Wrangell Compound will be in full operation during entire construction period.

Cooperate with the Government during construction operations to minimize conflicts and facilitate site operations. Perform the Work so as not to interfere with day-to-day operations. Maintain existing exits unless otherwise indicated.

1. Provide a proposed work schedule at the pre-work meeting complete with dates. Update the schedule as needed and provide a minimum of 2-week notification of any changes.

2. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the Contracting Officer.

1.08 WORK RESTRICTIONS

A. Work Restrictions, General: Comply with restrictions on construction operations.

B. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to occupancy with the Contracting Officer.

1. Notify Contracting Officer not less than two weeks in advance of proposed disruptive operations. Update the Contracting Officer as soon as possible if changes need to be made within that two-week window.

2. Obtain Contracting Officer’s written permission before proceeding with disruptive operations.

C. On-Site Work Hours, Utility Interruptions and Noise Restrictions:

1. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by the Government or others.

D. Restricted Substances: Use of tobacco products and other controlled substances within the existing building is not permitted.

05/14/2021 011000 Summary of Work Page 4 of 4

1.09 SALVAGE MATERIAL AND EQUIPMENT

A. Items designated by the Contracting Officer to be salvaged remain on the property of the Government. Segregate, itemize, deliver and off-load the salvaged property per Government requirements.

B. Provide a salvage plan, listing material and equipment to be salvaged, and their storage location.

C. Maintain property control records for material or equipment designated as salvage.

Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials disposition by the Contracting Officer.

1.10 SPECIFICATIONS

A. The project specifications are in the document are titled “Wrangell Compound HVAC Renovation”.

1.11 PROJECT CONSTRUCTION TIMING

A. Beneficial occupancy shall occur upon successful commissioning of new system.

Work shall be coordinated with US Forest Service Contracting Officer and COR.

B. If the Option Items are awarded, they will need to be completed in the same timeframe as Base Bid.

2. PART 2 – PRODUCTS

2.01 GENERAL

A. All products incorporated into the construction project shall be new unless specifically indicated otherwise in the project drawings or other specification sections.

3. PART 3 – EXECUTION

3.01 GENERAL

A. Perform all work indicated in the project drawings and specifications.

3.02 OPERATIONS AND SECURITY

A. The contractor shall keep a clean site. All stored materials shall be secured so they do not blow around. All construction debris shall be immediately placed in an enclosed container.

3.03 CONTRACTOR STAGING AND STORAGE AREA

A. Contractor staging and storage area size and location shall be coordinated with USFS Contracting Officer. Materials shall be secured and protected from the weather and adverse environmental conditions.

END OF SECTION 011000

05/14/2021 011400 Work Area Restrictions Page 1 of 2

SECTION 011400

WORK AREA RESTRICTIONS

1. PART 1 – GENERAL

1.01 SUBMITTALS

A. Submit the following in accordance with Section 013300 “Submittal Procedures”:

1. Preconstruction Submittals:

a. Contractor Regulations

b. Transportation of Personnel, Materials, and Equipment; List of Contact

Personnel

c. Personnel List

d. Vehicle List

1.02 SPECIAL SCHEDULING RQEUIREMENTS

A. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.

B. The facility will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.

C. Permission to interrupt any roads or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

1.03 ACTIVITY REGULATIONS

A. Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations.

Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Clearly mark all Contractor’s equipment for identification.

1.04 SUBCONTRACTOR AND PERSONNEL CONTACTS

A. Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.05 IDENTIFICATION BADGES AND ACCESS

A. Application for, and use of, badges will be as directed. Obtain access to the installation by coordination with US Forest Service Contracting Officer.

1.06 NO SMOKING POLICY

A. Smoking is prohibited within and outside of all buildings, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

05/14/2021 011400 Work Area Restrictions Page 2 of 2

1.07 WORKING HOURS

A. Regular working hours must consist of a period established by the Contractor Officer, between 7:30 a.m. and 5:30 p.m., Monday through Friday, excluding Government holidays.

1.08 WORK OUTSIDE REGULAR HOURS

A. Work outside regular working hours requires Contracting Officer approval. Make application 5 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title.

Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.

1.09 EXCLUSIONARY PERIOD

A. No work must be performed during the period 6pm to 6am, inclusive, without prior written approval of the Contracting Officer. This period has not been considered in computing the time allowed for the performance of this contract.

1.10 OCCUPIED BUILDING

A. The Contractor shall be working in an existing building, which is occupied.

B. Relocate movable furniture away from the Contractor's working area, protect the furniture, and replace the furniture in accordance with the furniture and equipment plan.

2. PART 2 – PRODUCTS

NOT USED.

3. PART 3 – EXECUTION

NOT USED.

END OF SECTION 011400

05/14/2021 012300 Options Page 1 of 1

SECTION 012300

OPTIONS

1. PART 1 – GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.02 SUMMARY

A. Option: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to the base bid amount if the Government decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.

1. Options described are part of the Work only if enumerated in the Agreement.

2. The cost or credit for each Option is the net addition to the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum.

1.03 PROCEDURES

A. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the option into Project.

1. Include as part of each option, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete Work whether or not indicated as part of option.

B. Notification: Immediately following award of the Contract, the Contracting Officer shall notify the Contractor, in writing, of the status of each option. Indicate if options have been accepted, rejected, or deferred for later consideration. Include a complete description of negotiated revisions to options.

C. Execute accepted options under the same conditions as other Work of the Contract.

1.04 SCHEDULE OF OPTIONS

A. Descriptions of the options are found in the Schedule of Items and Contract Documents.

2. PART 2 – PRODUCTS

NOT USED.

3. PART 3 – EXECUTION

END OF SECTION 012300

05/14/2021 012500 Substitution Procedures Page 1 of 3

SECTION 012500

SUBSTITUTION PROCEDURES

1. PART 1 – GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.02 SUMMARY

A. Section includes administrative and procedural requirements for substitutions.

1.03 DEFINITIONS

A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor.

1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms.

2. Substitutions for Convenience: Changes proposed by Contractor or Contracting Officer that are not required in order to meet other Project requirements but may offer advantage to Contractor or Government.

1.04 ACTION SUBMITTALS

A. Substitution Requests: Submit one electronic .pdf copy of each request for consideration. The electronic copy shall be provided by the manufacturer, and not a scanned version by the contractor. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.

B. Documentation: Show compliance with requirements for substitutions and the following, as applicable:

1. Statement indicating why specified product or fabrication or installation method cannot be provided, if applicable.

2. Coordination of information, including a list of changes or revisions needed for other parts of the Work that will be necessary to accommodate proposed substitution.

3. Detailed comparison of salient qualities of proposed substitutions with those of the Work specified. Include annotated copy of applicable Specification Section. Salient qualities may include attributes, such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.

4. Product Data, including drawings and descriptions of products and fabrication and installation procedures.

5. Samples, where applicable or requested.

05/14/2021 012500 Substitution Procedures Page 2 of 3

6. Certificates and qualification data, where applicable or requested.

7. List of similar installations for completed projects, with project names and addresses as well as names and addresses of architects and owners.

8. Material test reports from a qualified testing agency, indicating and interpreting test results for compliance with requirements indicated.

9. Research reports evidencing compliance with building code in effect for Project.

10. Detailed comparison of Contractor's construction schedule using proposed substitutions with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery.

11. Cost information, including a proposal of change, if any, in the Contract Sum.

12. Contractor's certification that proposed substitution complies with requirements in the Contract Documents, except as indicated in substitution request, is compatible with related materials and is appropriate for applications indicated.

13. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.

C. Contracting Officer’s Action: If necessary, Contracting Officer will request additional information or documentation for evaluation within seven days of receipt of a request for substitution. The Contracting Officer will notify Contractor of acceptance or rejection of proposed substitution within 14 days of receipt of request, or 7 days of receipt of additional information or documentation, whichever is later.

1. Use product specified if Contracting Officer does not issue a decision on use of a proposed substitution within time allocated.

1.05 QUALITY ASSURANCE

A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers, if applicable.

1.06 PROCEDURES

A. Coordination: Revise or adjust affected work as necessary to integrate work of the approved substitutions.

1.07 SUBSTITUTIONS

A. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals.

B. Conditions: The Contracting Officer will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions

05/14/2021 012500 Substitution Procedures Page 3 of 3 are not satisfied, the Contracting Officer will return requests without action, except to record noncompliance with these requirements:

1. Requested substitution is consistent with the Contract Documents and will produce indicated results.

2. Substitution request is fully documented and properly submitted.

3. Requested substitution will not adversely affect Contractor's construction schedule.

4. Requested substitution is compatible with other portions of the Work.

5. Requested substitution has been coordinated with other portions of the Work.

6. Requested substitution provides specified warranty.

C. Substitutions for Convenience: Contracting Officer will consider requests for substitution if received within 60 days after the Notice to Proceed. Requests received after that time may be considered or rejected at discretion of Contracting Officer.

D. Conditions: Contracting Officer will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Contracting Officer will return requests without action, except to record noncompliance with these requirements:

1. Requested substitution offers the Government a substantial advantage in cost, time, energy conservation, or other considerations, after deducting additional responsibilities the Government must assume.

2. Requested substitution does not require extensive revisions to the Contract Documents.

3. Requested substitution is consistent with the Contract Documents and will produce indicated results.

4. Substitution request is fully documented and properly submitted.

5. Requested substitution will not adversely affect Contractor's construction schedule.

6. Requested substitution is compatible with other portions of the Work.

7. Requested substitution has been coordinated with other portions of the Work.

8. Requested substitution provides specified warranty.

2. PART 2 – PRODUCTS

NOT USED.

3. PART 3 – EXECUTION

END OF SECTION 012500

05/14/2021 012900 Schedule of Values Page 1 of 3

SECTION 012900

SCHEDULE OF VALUES

1. PART 1 – GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including other Division 01 Specification Sections, apply to this Section.

1.02 SUMMARY

A. This Section specifies administrative and procedural requirements necessary to prepare and process Applications for Payment.

1.03 DEFINITIONS AND ABBREVIATIONS

A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract Sum to various portions of the Work and used as the basis for reviewing Contractor’s Applications for Payment.

1.04 SCHEDULE OF VALUES

A. Coordination: Coordinate preparation of the Schedule of Values with preparation of Contractor’s Construction Schedule.

1. Correlate line items in the Schedule of Values with other required administrative forms and schedules, including the following:

a. Application for Payment forms with Continuation Sheets.

b. Submittals Schedule.

c. Contractor’s Construction Schedule.

B. Identification: Include the following Project identification on the Schedule of Values:

1. Project name and location.

2. Government Contract Number.

3. Contractor’s name and address.

4. Date of submittal.

5. The Schedule of Values shall include the following items at a minimum:

a. Base Bid Items: Office Heating System Renovation Project

Administration

i. Mobilization for all Base Bid (items, and Option Items 4 - 6, if awarded.

ii. Demolition

iii. Mechanical

iv. Electrical

v. Architectural

b. Option Item 1: Bunkhouse Heating System Renovation

i. Mobilization for Option Item 1

ii. Demolition

iii. All remaining bunkhouse heating system work shown on the drawings.

05/14/2021 012900 Schedule of Values Page 2 of 3

c. Option Item 2: Warehouse Heating System Renovation

i. Mobilization for Option Item 2

ii. Demolition

iii. All remaining warehouse heating system work shown on the drawings.

d. Option Item 3: Office Ventilation System

i. Mobilization for Option Item 3

ii. Demolition

iii. All remaining office ventilation system work shown on the drawings.

iv. Plumbing & Fire Protection Systems

e. Option Item 4: Replace Code-Violating Electrical Panels

i. Demolition

ii. All remaining work to replace code-violating electrical panels

Office M, M1, C & Bunkhouse M

f. Option Item 5: Replace Obsolete Electrical Panels

i. Demolition

ii. All remaining work to replace obsolete electrical panels in

Office, Bunkhouse, and Warehouse

g. Option Item 6: Install Advance Meter

i. Install Government Furnished Advanced Meter, and all associated work.

h. The contractor must bid on all optional bid items as they will be awarded together.

C. Submit draft of standard form selected. Contractor may use an AIA, EJCDC or Forest Service provided form.

D. Arrange the Schedule of Values in tabular form with separate columns to indicate the following for each item listed:

1. Change Orders (numbers) that affect value.

2. Dollar value.

3. Percentage of the Contract Sum to nearest one-hundredth percent, adjusted to total 100 percent.

4. Round amounts to nearest whole dollar; total shall equal the Contract Sum.

1.05 APPLICATIONS FOR PAYMENT

A. Each Application for Payment shall be consistent with previous applications and payments as certified by Contracting Officer and paid for by the Government.

B. Submit the following items with the monthly application for payment:

1. Updated Construction Progress Schedule per Specification 013200.

05/14/2021 012900 Schedule of Values Page 3 of 3

PART 2 – PRODUCTS

NOT USED.

2. PART 3 – EXECUTION

END OF SECTION 012900

05/14/2021 013100 Project Management and Coordination Page 1 of 3

SECTION 013100

PROJECT COORDINATION AND MANAGEMENT

1. PART 1 – GENERAL

1.01 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Coordination Drawings.

2. Administrative and supervisory personnel.

3. Project meetings.

4. Requests for Interpretation (RFIs).

1.02 RELATED REQUIREMENTS:

A. Section 013200 "Construction Progress Documentation" for preparing and submitting Contractor's construction schedule.

B. Section 017700 "Closeout Procedures" for coordinating closeout of the Contract.

1.03 DEFINITIONS

A. RFI: Request from Contractor seeking interpretation or clarification of the Contract Documents.

1.04 COORDINATION

A. Coordinate staging and storage areas with the Contracting Officer.

B. The entire Wrangell Compound will remain open during construction. Coordinate all activities so as not to interfere with operations.

C. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

D. Make adequate provisions to accommodate items scheduled for later installation.

E. When needed, prepare memoranda outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

1.05 ADMINISTRATIVE PROCEDURES:

A. Coordinate scheduling and timing of required administrative procedures with other activities to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule including staging and timelines for all items.

2. Preparation of the Schedule of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Project closeout activities.

05/14/2021 013100 Project Management and Coordination Page 2 of 3

7. Startup and adjustment of systems.

8. Project closeout activities.

9. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials.

1.06 PROJECT MEETINGS

A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise indicated.

1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Government of scheduled meeting dates and times.

2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.

3. Minutes: Record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including the Contracting Officer, within three days of the meeting.

1.07 REQUESTS FOR INTERPRETATION (RFIS)

A. Procedure: Immediately on discovery of the need for interpretation of the Contract Documents, and if not possible to request interpretation while on site or at Project meeting, prepare and submit an RFI.

1. RFIs shall originate with Contractor. RFIs submitted by entities other than Contractor will be returned with no response.

2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.

B. Content of the RFI: Include a detailed, legible description of item needing interpretation and the following:

1. Project name.

2. Date.

3. Name of Contractor.

4. RFI number, numbered sequentially.

5. Specification Section number and title and related paragraphs, as appropriate.

6. Drawing number and detail references, as appropriate.

7. Field dimensions and conditions, as appropriate.

8. Contractor's suggested solution(s). If Contractor's solution(s) impact the Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

9. Contractor's signature.

10. Attachments: Include drawings, descriptions, measurements, photos, Product Data, Shop Drawings, and other information necessary to fully describe items needing interpretation.

05/14/2021 013100 Project Management and Coordination Page 3 of 3

a. Supplementary drawings prepared by Contractor shall include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments.

C. RFI Log: Prepare, maintain, and submit a tabular log of all RFIs organized by the RFI number. Submit the log with the Monthly Progress Payments.

1.08 CHANGE ORDER LOG

A. Prepare, maintain, and submit a tabular log of all Change Orders and Change Order Proposals. Submit the log with the Monthly Progress Payments.

2. PART 2 – PRODUCTS

NOT USED.

3. PART 3 – EXECUTION

END OF SECTION 013100

05/14/2021 013200 Construction Progress Documentation Page 1 of 3

SECTION 013200

CONSTRUCTION PROGRESS DOCUMENTATION

1. PART 1 – GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including other Division 01 Specification Sections, apply to this Section.

1.02 SUMMARY

A. Section includes administrative and procedural requirements for handling and processing Contract modifications.

1. Contractor's Construction Schedule.

2. Startup construction schedule.

3. Site condition reports.

4. Unusual event reports.

1.03 DEFINITIONS

A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction Project.

B. Event: The starting or ending point of an activity.

C. Float: The measure of leeway in starting and completing an activity.

1. Float time is not for the exclusive use or benefit of either the Government or Contractor, but is a jointly owned, expiring Project resource available to both parties as needed to meet schedule milestones and Contract completion date.

1.04 INFORMATIONAL SUBMITTALS

A. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule for entire construction period.

B. Construction Schedule Updating Reports: Submit as needed and provide a minimum of 2-week notification of any changes.

C. Unusual Event Reports: Submit at time of unusual event.

1.05 QUALITY ASSURANCE

A. Prescheduling Conference: Conduct conference at Project site to comply with requirements in Section 013100 "Project Management and Coordination." Review methods and procedures related to the preliminary construction schedule and Contractor's Construction Schedule, including, but not limited to, the following:

1. Discuss constraints, including phasing, work stages, area separations, interim milestones, and Government occupancy.

2. Review submittal requirements and procedures.

3. Review time required for review of submittals and resubmittals.

4. Review requirements for tests and inspections by independent testing and inspecting agencies.

5. Review time required for Project closeout.

05/14/2021 013200 Construction Progress Documentation Page 2 of 3

6. Review and finalize list of construction activities to be included in schedule.

7. Review procedures for updating schedule.

1.06 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL

A. Time Frame: Extend schedule from date established for the Notice to Proceed to date of final completion.

B. Activities: Comply with the following:

1. Procurement Activities: Include procurement process activities for long lead items and major items as separate activities in schedule. Procurement cycle activities include, but are not limited to, submittals, approvals, purchasing, fabrication, and delivery.

C. Submittal Review Time: Include review and resubmittal times indicated in Section 013300 "Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's Construction Schedule with submittal schedule.

D. Substantial Completion: Indicate completion in advance of date established for Substantial Completion and allow time for Contracting Officer’s administrative procedures necessary for certification of Substantial Completion.

E. Punch List and Final Completion: Include not more than 30 days for completion of punch list items and final completion.

F. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule and show how the sequence of the Work is affected.

1. Phasing: Arrange list of activities on schedule by phase.

2. Products Ordered in Advance: Include a separate activity for each product.

Delivery dates indicated stipulate the earliest possible delivery date.

G. Work Stages: Indicate important stages of construction for each major portion of the Work, including, but not limited to, the following:

1. Submittals.

2. Purchases.

3. Deliveries.

4. Installation.

5. Tests and inspections.

6. Adjusting.

7. Startup and placement into final use and operation.

8. Commissioning.

H. Construction Areas: Identify each major area of construction for each major portion of the Work.

I. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, Substantial Completion, and final completion.

05/14/2021 013200 Construction Progress Documentation Page 3 of 3

J. Upcoming Work Summary: Prepare summary report indicating activities scheduled to occur or commence prior to submittal of next schedule update. Summarize the following issues:

1. Unresolved issues.

2. Unanswered Requests for Information.

3. Rejected or unreturned submittals.

4. Notations on returned submittals.

5. Pending modifications affecting the Work and the Contract Time.

K. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect actual construction progress and activities. Issue schedule one week before each regularly scheduled progress meeting.

1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.

2. Include a report with updated schedule that indicates the changes, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations.

1.07 STARTUP CONSTRUCTION SCHEDULE

A. Gantt-Chart Schedule: Submit startup, horizontal, Gantt-chart-type construction schedule within 14 days of the Notice to Proceed.

B. Preparation: Indicate each significant construction activity separately. Outline significant construction activities for the duration of construction. Include skeleton diagram for the remainder of the Work.

1.08 REPORTS

A. Site Condition Reports: Immediately on discovery of a difference between site conditions and the Contract Documents, prepare and submit a detailed report.

Submit with a Request for Information. Include a detailed description of the differing conditions, together with recommendations for changing the Contract Documents.

B. Unusual Event Reports: When an event of an unusual and significant nature occurs at Project site, whether or not related directly to the Work, prepare and submit a special report. List chain of events, persons participating, responses by Contractor's personnel, evaluation of results or effects, and similar pertinent information.

C. Section 017700 "Closeout Procedures" for coordinating closeout of the Contract.

2. PART 2 – PRODUCTS

NOT USED.

3. PART 3 – EXECUTION

END OF SECTION 013200

05/14/2021 013300 Submittal Procedures Page 1 of 6

SECTION 013300

SUBMITTAL PROCEDURES

1. PART 1 – GENERAL

1.01 SUMMARY

A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples and other submittals.

B. Government approval is required for design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, items listed in construction documents requiring submittal and other items as designated by the Contracting Officer.

C. Government approval is required for any deviations from the Solicitation or Accepted Proposal and other items as designated by the Contracting Officer.

1.02 DEFINITIONS

A. Action Submittals: Written and graphic information that requires Contracting Officer responsive action.

B. Catalog Data: Preprinted material from the manufacturer obtained from catalogs, brochures, circulars, or advertisements. Generally, catalog data should provide a picture of the product and show general conformance to product requirements or performance characteristics.

C. Informational Submittals: Written information that does not require Contracting Officer responsive action. Submittals may be rejected for not complying with requirements.

D. Product Data: Preprinted material from the manufacturer, including catalog data, that shows specific conformance to all product specifications. This may include illustrations, engineering data, performance charts, diagrams, test results, etc.

Generally, product data is more detailed submission than catalog data.

E. Sample: A physical example of a product, assembly, or workmanship.

F. Shop Drawing: Fabrication drawings prepared specifically for this work by the Contractor. Submittals which graphically show relationship of various components of the work, schematic diagrams of systems, detail of fabrications, layout of particular elements, connections, and other relational aspects of the work.

1.03 SUBMITTAL LOG

A. Prepare and maintain a separate electronic Submittal Log to monitor submittals required by the contract documents. Show:

1. Work item number corresponding to the specification section and construction schedule.

2. Contractor, subcontractor, sub-subcontractor or supplier responsible for each work item.

3. Narrative description of the work item.

4. Date submittal due.

5. Number of days allowed for approval.

05/14/2021 013300 Submittal Procedures Page 2 of 6

6. Date approval due.

B. Update and submit the Submittal Log with the Monthly Progress Payment.

1.04 SUBMITTAL PROCEDURES

A. The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.

B. General:

1. All submittals shall be provided in electronic .pdf format or other format in each section as required. This includes, but is not limited to: submittals for review, information, and closeout; requests for information (RFI’s); progress documentation, and meeting minutes.

a. Product submittals shall the original .pdf cut sheet from the manufacturer. No scanned copies allowed.

i. Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.

ii. Electronic copies of the Contract Drawings in CAD will be provided by Contracting Officer for Contractor's use in preparing submittals.

C. File transmission method

1. All submittals shall be transmitted to the Government on a file transfer system specified by the Government. Details will be provided after award.

D. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. Contracting Officer reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

E. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Contracting Officer’s receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.

1. Reviews: Allow 15 Business Days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required.

Contracting Officer will advise Contractor when a submittal being processed must be delayed for coordination.

F. Identification: Using a .pdf markup tool, place a title block on each submittal for identification.

05/14/2021 013300 Submittal Procedures Page 3 of 6

1. Provide a space approximately 6 by 8 inches beside title block to record Contractor's review and approval markings and action taken by Contracting Officer.

a. Include the following information on title block for processing and recording action taken:

i. Project name.

ii. Date.

iii. Name of manufacturer.

iv. Submittal number or other unique identifier, including revision identifier.

v. Number and title of appropriate Specification Section as well as paragraph number.

vi. Drawing number and detail references, as appropriate.

vii. Location(s) where product is to be installed, as appropriate.

viii. Other necessary identification.

G. Deviations: Highlight, encircle or otherwise specifically identify deviations from the Contract Documents on submittals. Include justification for the deviation.

Deviations will not be reviewed until Contracting Officer approves justification.

H. Transmittal: Package each submittal individually and appropriately for transmittal and handling. Contracting Officer will discard submittals received from sources other than Contractor.

2. PART 2 – PRODUCTS

2.01 ACTION SUBMITTALS

A. General: Prepare and submit Action Submittals required by individual Specification Sections.

1. Submit electronic submittals in PDF format to a site designated by the Contracting Officer.

2. Date and name each submittal file in the name.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Standard color charts.

05/14/2021 013300 Submittal Procedures Page 4 of 6

e. Manufacturer's catalog cuts.

f. Wiring diagrams showing factory-installed wiring.

g. Printed performance curves.

h. Operational range diagrams.

i. Mill reports.

j. Standard product operation and maintenance manuals.

k. Compliance with specified referenced standards.

l. Testing by recognized testing agency.

m. Application of testing agency labels and seals.

n. Notation of coordination requirements.

4. Submit Product Data before or concurrent with Samples.

C. Submittal Markup Notation & Approval

1. A project submittal spreadsheet approval tool will be used as the primary submittal approval method for all materials in all divisions. This will be returned to the contractor with updated after each submittal with all items shown with specification number and salient characteristics listed and approval notes. Individual marked up cut sheets will not be returned to the contractor.

2. If the review indicates that the material, equipment or work method is in general conformance with the Plans/Specifications, the submittals copies will be marked "No Exceptions Taken". The Contractor may begin to incorporate the material/equipment/work method covered in the submittals.

3. If the review indicates that the submittals are insufficient or that limited corrections are required, the submittals copies will be marked "Make Corrections Noted". The Contractor may begin to incorporate the material/equipment/work method covered in the submittals in accordance with the corrections/comments noted.

4. If the review reveals the submittal requires revision and re-submittal, the submittals copies will be marked "Revise and Resubmit". The Contractor shall not then undertake work covered by this submittal until the submittals has been revised, resubmitted and approved by the Contracting Officer.

5. If the review reveals that the material, equipment or work method is not in general conformance with the Plans/Specifications, the submittals copies will be marked "Rejected". The Contractor shall not then undertake work covered by this submittal until the submittals has been revised, resubmitted and approved by the Contracting Officer.

D. Shop Drawings: Submit Shop Drawings required by other specification sections.

Prepare Project-specific information, drawn accurately to scale.

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:

a. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 8-½” x 11” but no larger than 24” x 36”.

05/14/2021 013300 Submittal Procedures Page 5 of 6

b. Number of Copies: Submit one electronic copy of all Shop drawings in PDF format. When Shop Drawings are approved submit one electronic copy in PDF and CAD format.

E. Samples: Submit Samples required by other specification sections. Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed.

1. Transmit Samples that contain multiple, related components such as accessories…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .