This federal contract solicitation seeks proposals for the Wrangell Ranger District Complex HVAC Phase I project. The USDA Forest Service Tongass National Forest requires removal and replacement of boilers and heating systems in several buildings. Optional items include replacing electrical panels. Drawings currently depict the entire multi-phase project but will be updated within a week to only show the scope of this Phase 1 solicitation. Proposals and bid bonds are due by 4:00pm local Alaska time on June 25, 2021 and must be electronically submitted. The solicitation has a total small business set-aside. No pre-proposal meeting is currently scheduled but one may be set up with at least one week's notice via amendment.

View the file

Other files for this federal contract opportunity

Other files attached to Wrangell Ranger District Complex HVAC Phase I, newest first.
File Type Posted
Drawings_WRG HVAC_Final.pdf PDF
Technical Specifications.pdf PDF
Wage Determination.pdf PDF
1240BJ21R0003 Solicitation.pdf PDF
2_16_BAA DF Nonavailability_012821.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1240BJ21R0003

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

40BJ

PORTLAND OR 97204-2829

STE 310

1220 SW 3RD AVE

USDA-FS CSA NORTHWEST 7

06/10/20210001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/27/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purposes of this Amendment are to accomplish the following:

1) Remove the original Sections B, C, H, and J, and replace it with the attached Sections

B, C, H, and J (12 pages);

2) Remove the original Technical Specifications, and replace them with the attached Phase 1

Technical Specifications (365 pages), and;

3) Remove the original Drawings, and replace them with the attached Phase 1 Drawings (71 pages).

Proposals must use this new Section B. for pricing evaluation purposes; submit with all other required submission materials to jonathan.gellings@usda.gov by the previously-established due date and time (1600 local Alaska time on 6/25/2021).

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 450

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

1240BJ21R0003/0001

Period of Performance: 10/01/2021 to 03/31/2022

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Wrangell Compound HVAC Replacement Phase I Wrangell Ranger District, Tongass National Forest

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

Contract Line Items (CLINs):

Item # Schedule of Supplies/Services Quantity Pay Unit

Unit Price

Amount

0001 Base Item: Bunkhouse Heating System Renovation 0001AA Mobilization for Base Item and all

Option Items, if awarded.

1 LS $ $

0001AB Demolition 1 LS $ $ 0001AD All remaining bunkhouse heating system work shown on the drawings

1 LS $ $

Total Item(s) 0001: $ 1001 Option Item 1: Replace Code-Violating Electrical Panels

1001AA Demolition 1 LS $ $ 1001AB All remaining work to replace code-violating electrical panels Office M, M1, C & Bunkhouse M

1 LS $ $

Total Item(s) 1001: $ 1002 Option Item 2: Replace Obsolete Electrical Panels

1002AA Demolition 1 LS $ $ 1002AB All remaining work to replace obsolete electrical panels in Office, Bunkhouse, and Warehouse

1 LS $ $

Total Item(s) 1002: $ 1003 Option Item 3: Warehouse Heating System Renovation

1003AA Demolition 1 LS $ $ 1003AB All remaining warehouse heating system work shown on the drawings

1 LS $ $

Total Item(s) 1003: $

LS – Lump Sum Additional Terms:

1) Quoters must submit prices for all Items in the Schedule of Items above.

2) Disclosure of the Magnitude of Construction Projects:

Between $250,000 and $1,000,000.

3) Mobilization does not include on-site construction activities including the movement of personnel, materials, or equipment within the project site.

4) Payment for bond premiums in accordance with (IAW) Federal Acquisition Regulation ((FAR)

48 CFR Chapter 1) Clause 52.232-5 Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under Mobilization.

5) Payment will be made IAW Section G.2. only for those Items listed on the Schedule of Items above.

SECTION C - DESCRIPTION/SPECIFICATION/STATEMENT OF WORK

C.1 Description of Work / Scope of the Contract

The intent of this contract is to provide for facility repair consisting of, but not limited to: selective demolition of heating systems, electrical systems, and fuel oil delivery systems; electric heat pump installation; electric radiant heater installation; and electrical panelboard installation at the USDA Forest Service bunkhouse, office, warehouse and garage buildings in Wrangell, Alaska.

Base item work includes replacing the bunkhouse’s oil-fired boiler and hydronic heating system with electric heat pumps and electric radiant heaters, which includes:

• Demolition and removal of existing oil-fired boiler, chimney, expansion tank, pumps, piping, heating units, valves, controls, fuel oil tank, fuel oil piping, supports, containments, and electrical service panelboard and branch circuiting

• Patching and repair of walls, ceiling, floors, and roof where existing heating system is removed

• Provision of multi-zone heat pump system consisting of outdoor unit, foundation for outdoor unit, indoor units, refrigerant piping, condensate piping, controls, and chases for refrigerant piping

• Provision of electric radiant heaters and controls

• Provision of new electrical service including meter center, meters, circuit breakers, panelboard, panelboard feeders, surge protective device for panelboard, branch circuiting to new heat pump and radiant heaters, disconnects, and service light and outlet

Retain and reuse the existing electrical service conductors from the utility transformer to the building service entrance.

Option item work includes electrical panelboard and load center replacements in the bunkhouse, office, warehouse, and garage.

Option item work also includes replacing the warehouse’s oil-fired boiler and hydronic heating system with electric heat pumps and electric radiant heaters which includes:

• Remove the hydronic heating system including but not limited to boilers, pumps, piping, heating units, controls and appurtenances.

• Purge and remove the fuel oil system, including aboveground tank, piping, containments, and appurtenances.

• Purge below ground piping to the office and warehouse and abandon.

• Provide two multi-zone heat pump systems consisting of outdoor units, refrigerant piping, indoor units, power and controls.

• Provide electric unit heaters and controls in smaller rooms.

• The above descriptions are provided as an outline of major work items and shall not be construed as an inclusive or complete listing of all items of work under this contract.

The Contractor shall furnish all management, labor, equipment, supervision, tools, materials, transportation, operating supplies, supervision, workman’s compensation, unemployment insurance and incidentals necessary to perform the work in accordance with the specification and provisions of the contract.

C.2 Project Location and Access

Project is located at the Wrangell Ranger District Administrative Site at 525 Bennett Street in Wrangell, AK, approximately 80 miles northwest of Ketchikan. Wrangell is a remote community in Southeast Alaska, and is not connected to the mainland road system. It is accessible via commercial airline, Alaska Marine Highway System ferry service, and barge line. As of March 2021: commercial jet service occurs twice per day, one northbound and one southbound flight; ferry service occurs twice per week, one northbound and one southbound vessel.

C.3 Background The Wrangell Ranger District Administrative Site (aka the Wrangell Compound) includes a 9,400 SF two story office, 4,200 SF single story warehouse, 3,025 SF single story bunkhouse, and 3,360 SF single story garage. All buildings are wood-framed. The buildings were constructed in the mid 1980’s, and the heating and electrical systems were installed in 1986. All three heating systems (garage does not have a heating system) and much of the electrical service equipment is at the end of its operational life. The bunkhouse heating system is in the poorest condition of the three systems and must be addressed soonest. In addition, the bunkhouse lacks redundant heating sources (if the boiler goes down, there is no heat source) and lacks a cooling system. Throughout all four buildings, there are several electrical panels which are obsolete and/or violate code.

Building sizes: 9,400 SF two story office, 4,200 SF single story warehouse, 3,025 SF single story bunkhouse, and 3,360 SF single story garage. All buildings are wood-framed.

C.4 Reference Codes, Standards, and Specifications

1. The Contractor shall construct the Work specified herein in accordance with the requirements of the Contract Documents and the referenced portions of those referenced codes, standards, and specifications listed herein.

2. All construction shall comply with the following:

A. 2012 editions of the International Building Code (IBC), International Fire Code (IFC), and International Mechanical Code (IMC).

B. 2012 edition of the Uniform Plumbing Code C. National Electrical Code (NEC) of the National Fire Protection Association, 2014 edition.

D. NFPA 101 Life Safety Code E. Architectural Barriers Act Accessibility Standards F. Manufacturer’s recommendations G. All applicable Federal, State, and Local laws, ordinances, and regulations.

H. Other codes, reference standards, specifications and regulations referred to within these specifications (even though not specifically listed here) are also fully applicable to the solicitation and any resultant contract.

3. In case of conflict between codes, reference standards, Drawings and the other Contract Documents, the most stringent requirements shall govern. All conflicts shall be brought to the attention of the CO for clarification and directions prior to ordering or providing any materials or furnishing labor. The Contractor shall bid for the most stringent requirements.

C.5 Information about the Site

Quoters are urged and expected to inspect the site where the work will be performed.

There will not be a Pre-Bid Tour for the project. Prospective quoters are encouraged to tour the site prior to quoting.

With their quote, the Contractor acknowledges that they have taken the necessary steps to ascertain the nature and location of work and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the Government.

For information about the project site, contact the following individual:

Name: Jeremy Powell Address: R10 - Tongass NF – Wrangell Ranger District 525 Bennett Street, Wrangell, AK Telephone: 907.874-7516 E-mail: jeremy.powell@usda.gov

C.6 Clauses

AGAR 452.211-72 Statement of Work/Specifications (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract / task order.

The specifications shown in the specification listing contained in the attachments are applicable to this contract. All specifications not included in the specification listing but referenced by listed specifications, are applicable. The specifications shown on the specification list are physically attached

C.7 BioBased Products

The Contractor must comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.

The Contractor shall utilize products and material made from biobased materials (e.g., insulating foam, composite panels, and concrete and asphalt release fluids) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer.

The following is an example list of products that may be used in this contract for minor construction for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.

Graffiti and grease removers Insulation foam Concrete and asphalt release fluids Fluid-filled transformers Wood and concrete sealers Composite panels Adhesive and mastic removers Carpets Roof coating Hydraulic fluid Diesel fuel additives Greases Dust suppressant 2-cycle engine oil Absorbents

Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material

In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other commercially available biobased products.

The awarded Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements.

The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes.

The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.

The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

C.7 Required Submittals

The following is a general summary of the required submittals. Other submittals may be required as specified elsewhere in this contract.

Submittal Title Referenced By Specification No.

Submittal Date

Schedule of Work / Progress Schedule Schedules for Construction Contracts (FAR 52.236-15)

With Quote.

Job Specific Safety Plan including how Contractor will apply to the requirements regarding COVID.

Accident Prevention, (FAR 42.236-13)

COVID information with Quote . Rest of Safety Plan Prior to Work Starting

Copy of Required Insurance Coverage Insurance work on Government Installation (FAR 52.228-5)

Prior to Work Starting

Designation of Representative

R6-FS-6300-6

Superintendence by Contract (FAR 52.236-6)

At the Post Award Conference

Notification of Subcontracting & SF1413 - Statement and Acknowledgement for each Subcontractor including Owner/Operators and other Sole Proprietorship Subcontractors [not required for material suppliers]

Subcontracts (Labor Standards)

(FAR 52.236-11)

Prior to Subcontractor Starting Work

Payroll Records WH347 Certified Payrolls submitted weekly

Basic Contract Payrolls and Basic Records (FAR 52.222-8)

Weekly

Drug Free Workplace Policy (If applicable)

Drug-Free Workplace

(FAR 52.223-6)

Prior to Work Starting

Release of Claims Form Section G Prior to Final Payment Biobased or BioPreferred Products FAR 52.223-2 With Quote and in accordance with Clause Other Submittals Section C As required in Specifications and Plans

SECTION H -- SPECIAL CONTRACT REQUIREMENTS

FAR 52.236-4 Physical Data (APR 1984)

Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

A. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by observations and measurements.

B. Transportation facilities: Wrangell is a remote community in Southeast Alaska, not connected to the mainland road system. It is accessible via commercial airline, Alaska Marine Highway System ferry service and barge line. It is a full-service community.

Conformity with Drawings and Specifications

Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. “Reasonably close conformity” is compliance with reasonable and customary manufacturing and construction tolerance.

A. Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

B. The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

C. Government inspections and tests are for the sole benefit of the Government and do not--

1. Relieve the Contractor of responsibility for providing adequate quality control measures;

2. Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

3. Constitute or imply acceptance; or

4. Affect the continuing rights of the Government after acceptance of the completed work under paragraph (I) below.

D. The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

E. The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

F. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

G. If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.

H. If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

I. Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

Warning Signs and Restrictions

Contractor shall be totally responsible for safety signing, barricades and other signing to maintain a safe site to the public and Government employees.

Job Specific Safety Plan

Prior to allowing any work to commence on the project, the Contractor shall submit a Safety Plan to the Contracting Officer that is in accordance with OSHA Regulations. The Plan shall recognize the inherently hazardous conditions that will exist on this contract. Some of these hazardous conditions are, but not limited to: handling hazardous material, loading and unloading of materials, site security, noises and dust. Such safety plan shall include all tasks and related activities anticipated to successfully complete the work. The safety plan shall include the Personal Protective Equipment (PPE) that the Contractor provides for his/her employees at no cost to them. It shall include how often the PPE is inspected to ensure that it is not defective or damaged. It shall include steps the Contractor takes to ensure that his/her workers are using the PPE on the worksite and what steps the Contractor uses if an employee is found to be working without the required PPE. The Contractor shall include any safety training he/she provides to his/her employees.

The safety plan must also describe the Contractor’s efforts and response to adaptively comply with current and future State of Alaska COVID-19 Health Mandates along with any other Federal, State or Local requirements. The Contractor must include in their safety plan how they intend to comply with existing requirements and maintain flexibility to comply with changes as they occur. If travel is anticipated, a copy of the Contractor’s travel plan or protocol (indicate whether the plan is a draft or whether the plan has already been submitted) for maintaining critical infrastructure as required by State Health Mandates. State of Alaska COVID-19 Information can be found here: https:/covid19.alaska.gov.

Safety Items

(a) Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the work site.

(b) The following checked activities have been identified by the Government as potential safety hazards.

[] Confined Entry Space.

[] Temporary excavation/deep trenching/slope stability.

[] Tree Felling.

[] Fall hazard from work heights exceeding six feet.

[] Blasting.

[] Traffic control on high-volume and/or high-speed and/or limited visibility roads.

[] Heavy equipment operation.

[] Tree climbing and/or tower climbing.

[] Fire hazards.

[X] Hazard materials handling.

[X] Electrical hazard.

[] Hydraulic and/or pneumatic and/or other high pressure hazards.

[] Mechanical hazards such as pulleys, springs, etc.

[X] Power tool operation including eye protection.

[] Overhead hazards.

[X] COVID - 19

Storage of Materials and Equipment

Materials shall be stored to assure the preservation of their quality and fitness for work. Approved areas on the Forest Service administrative site may be used for storage purposes, except demolished materials may not be stored on Forest Service land. All storage sites approved by the Government shall be restored to a satisfactory condition at the Contractor's expense.

Product Substitution, Shop Drawings and Material Certification

A. Product Substitution. Any modification of other items, designs, materials, products or equipment (including Government-Furnished Property), made necessary because of a substitution, will be the responsibility of the Contractor without adjustment in contract price or time. The Contracting Officer’s approval of any substitute will not affect the Contractor’s responsibility for such modification. All substitutions shall be requested by the Contractor after award of the contract has been made. No approvals will be made prior to award.

Utility Services

Electrical power, water, and wastewater services are available at the site.

Prosecution of Work

A. The following special controls will affect the Contractor’s prosecution of work:

a. The bunkhouse may be occupied during the Period of Performance. Contractor shall take special care to limit disruption to occupants, ensure continue occupant safety, and ensure utilities are not interrupted for more than 4 hours at a time.

b. For scheduled power outages, inform the CO 72 ours in advance.

B. The Contractor may encounter other contractors performing work on projects in the area.

C. Utilities made available by the Government for use by the Contractor are: Electric power, restrooms, water.

Hazardous Materials

Contractor shall notify the Government of any hazardous materials and or waste (as defined in 29 CFR 1910.1200) to be used on the job and will have Material Safety Data Sheets (MSDSs) for those materials available on the job. All such materials shall be labeled in accordance with Federal and State regulations.

Disposal of Material

Debris encountered in the construction (metals, etc.) and other waste materials generated in the construction (cartons, scrap, etc.) shall be removed and disposed of in a State or City approved site off of National Forest Service Land, unless other disposal means are authorized in the plans or specifications.

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

SECTION J - LIST OF ATTACHMENTS

List of Attached Documents, Exhibits and Other Attachments

The following attachments are made a part of this solicitation and any resultant contract.

Title Pages

1. Phase 1 Technical Specifications 365

2. Phase 1 Project Drawings 71

4. DOL Wage Decision: AK20210001/3 14

6. Determination and Findings of Non-Availability of Domestic Construction Material, dated 1/28/21

Wrangell Compound HVAC Renovation Final Construction Documents Submittal

May 19, 2021

Corporate Office: 500 W 27th Avenue, Suite A, Anchorage, AK 99503 Branch Offices: Wilsonville OR; Kodiak AK; Tampa FL

Tel. (877) 844-5264; E-mail: mail@bce-ak.com; Web site: www.bce-ak.com

WrangellCompoundHVACRenovation
TongassNationalForest

FINAL CONSTRUCTION DOCUMENTS

SPECIFICATIONS

erinclay Typewritten Text

REVISIONS 5-28-2021

THIS SPECIFICATION PACKAGE HAS BEEN REVISED TO

EXCLUDE WORK WHICH IS NOT INCLUDED IN PHASE 1

OF THE PROJECT. ALL SPECIFICATION SHEETS ARE

RETAINED FOR INFORMATION.

erinclay Polygon erinclay Typewritten Text

NOTE: THE PHASE 1 BASE BID ITEM AND OPTION ITEM NUMBERING

DIFFERS FROM THE BASE BID ITEM AND OPTION ITEM NUMBERING IN

THESE SPECIFICATIONS. FOR PHASE 1 BASE BID AND OPTION ITEM

NUMBERING PLEASE SEE CONTRACT SECTION B- SCHEDULE OF ITEMS.

erinclay Polygon

USDA Forest Service Wrangell Compound HVAC Renovation Project Specifications

05/14/2021 000110 Table of Contents Page 1 of 3

SECTION 000110

TABLE OF CONTENTS

DIVISION 00 - BIDDING AND CONTRACT REQUIREMENTS

TO BE PROVIDED BY FOREST SERVICE

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 011000 SUMMARY OF WORK

SECTION 011400 WORK AREA RESTRICTIONS

SECTION 012300 OPTIONS

SECTION 012500 SUBSTITUTION PROCEDURES

SECTION 012900 SCHEDULE OF VALUES

SECTION 013100 PROJECT MANAGEMENT AND COORDINATION

SECTION 013200 CONSTRUCTION PROGRESS DOCUMENTATION

SECTION 013300 SUBMITTAL PRODECURES

SECTION 014000 QUALITY REQUIREMENTS

SECTION 015000 TEMPORARY FACILITIES AND CONTROLS

SECTION 015300 PROTECTION AND RESTORATION OF EXISTING FACILITIES

SECTION 016000 PRODUCT REQUIREMENTS

SECTION 017329 CUTTING AND PATCHING

SECTION 017423 FINAL CLEAN-UP

SECTION 017700 CLOSEOUT PROCEDURES

SECTION 017823 OPERATIONS AND MAINTENANCE PROCEDURES

SECTION 017839 PROJECT RECORD DOCUMENTS

SECTION 017900 DEMONSTRATION AND TRAINING

SECTION 019133 COMMISSIONING

DIVISION 02 – EXISTING CONDITIONS

SECTION 023000 EARTHWORK

SECTION 024119 SELECTIVE DEMOLITION

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

SECTION 062000 FINISH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

SECTION 072100 THERMAL INSULATION

SECTION 072500 WEATHER BARRIERS

SECTION 076200 SHEET METAL FLASHING AND TRIM

SECTION 078400 FIRESTOPPING

SECTION 079200 JOINT SEALANTS

05/14/2021 000110 Table of Contents Page 2 of 3

DIVISION 08 - OPENINGS

SECTION 083100 ACCESS DOORS AND PANELS

DIVISION 09 - FINISHES

SECTION 092500 GYPSUM BOARD WALL

SECTION 095100 SUSPENDED ACOUSTICAL CEILINGS

SECTION 099120 INTERIOR AND EXTERIOR PAINT

DIVISION 23 – HEATING VENTILATION AIR CONDITIONING/MECHANICAL

SECTION 230500 COMMON WORK RESULTS FOR HVAC

SECTION 230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

SECTION 230517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING

SECTION 230518 ESCUTCHEONS FOR HVAC PIPING

SECTION 230548 VIBRATION AND SEISMIC CONTROLS FOR HVAC

SECTION 230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

SECTION 230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

SECTION 230713 DUCT INSULATION

SECTION 233113 METAL DUCTS

SECTION 233300 AIR DUCT ACCESSORIES

SECTION 233713 AIR INLETS AND OUTLETS

SECTION 237223.13 PACKAGED INDOOR HEAT WHEEL ENERGY RECOVERY UNITS

SECTION 238129 AIR-COOLED, MULTI-EVAPORATOR VARIABLE

CAPACITY HVAC SYSTEMS

SECTION 238239 PROPELLER UNIT HEATERS

DIVISION 26 - ELECTRICAL

SECTION 260010 GENERAL TECHNICAL PROVISIONS

SECTION 260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND

CABLES

SECTION 260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION 260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION 260533 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS

SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION 260574 ELECTRICAL ARC FLASH ANALYSIS & SHORT CIRCUIT STUDY

SECTION 260912 POWER MONITORING SYSTEMS

SECTION 260914 SPLIT CORE CURRENT TRANSFORMERS

SECTION 260915 RTD TEMPERATURE SENSORS

SECTION 260916 SMART CT SUB METERS

SECTION 260917 MONITORED PARAMETERS

SECTION 260919 COMMISSIONING

SECTION 262416 PANELBOARDS

SECTION 262713 ELECTRICITY METERING

05/14/2021 000110 Table of Contents Page 3 of 3

SECTION 262726 WIRING DEVICES

SECTION 262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION 264313 SURGE PROTECTIVE DEVICES

END OF SECTION 000110

05/14/2021 011000 Summary of Work Page 1 of 4

SECTION 011000

SUMMARY OF WORK

1. PART 1 – GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.02 PROJECT INFORMATION

A. Project title: Wrangell Compound HVAC Renovations.

B. The project is located at Wrangell Ranger District compound at 525 Bennett Street, Wrangell, Alaska, approximately 80 miles northwest of Ketchikan. The compound includes a 9,400 SF two-story office building, a 4,200 SF warehouse and shop, and a 3,000 SF bunkhouse.

1.03 PROJECT BACKGROUND

A. Mechanical systems for all three building were installed in 1986. The office building had a new addition in 1999 and the mechanical system was retrofitted to include the addition. Piping for the new section was added and new pumps were installed.

B. The mechanical systems include heating only. There are no central ventilation or cooling systems in any of the buildings. Warehouse workshop does not have a central sawdust collection system.

C. Heating systems use oil fuel with two external tanks. One oil tank serves the office and the warehouse and the other serves the bunkhouse boiler. There are no oil leaks.

D. Single pipe hot water heating system in the Office Building is inefficient; it overheats the upper floor and provides uneven heating for the lower floor.

E. Buildings do not have redundant heating sources.

F. Office Building overheats in the summer.

G. Heating systems in all three buildings are at the end of their operational life and require new high efficiency systems.

1.04 PROJECT SCOPE BASE BID

A. Renovate heating system at the office building:

1. Remove the hydronic heating system including but not limited to boilers, chimney, pumps, piping, heating units, controls and appurtenances.

2. Purge and remove the fuel oil piping and appurtenances.

3. Provide five multi-zone heat pump systems consisting of outdoor units, refrigerant piping, indoor units, power and controls.

4. Provide electric radiant heaters and controls in smaller rooms.

erinclay Line erinclay

NIC

05/14/2021 011000 Summary of Work Page 2 of 4

1.05 PROJECT SCOPE OPTION BID ITEMS

A. Option Item 1 – Renovate heating system at the bunkhouse:

1. Remove the hydronic heating system including but not limited to boilers, pumps, piping, heating units, controls and appurtenances.

2. Purge and remove the fuel oil system, including aboveground tank, piping, containments, and appurtenances.

3. Purge below ground piping.

4. Provide one multi-zone heat pump system consisting of outdoor units, refrigerant piping, indoor units, power and controls.

5. Provide electric radiant heaters and controls in smaller rooms.

B. Option Item 2 – Renovate heating system at the warehouse:

1. Remove the hydronic heating system including but not limited to boilers, pumps, piping, heating units, controls and appurtenances.

2. Purge and remove the fuel oil system, including aboveground tank, piping, containments, and appurtenances.

3. Purge below ground piping to the office and warehouse and abandon.

4. Provide two multi-zone heat pump systems consisting of outdoor units, refrigerant piping, indoor units, power and controls.

5. Provide electric unit heaters and controls in smaller rooms.

C. Option Item 3 – Install ventilation system at the office building:

1. Relocate the sprinkler header and service sink in the mechanical room.

2. Remove the exterior wall to install the heat recovery unit and reconstruct it.

3. Install a ventilation system consisting of heat recovery unit HRU-2, louvers, dampers, ductwork, diffusers, grilles and controls.

4. Design and provide structural reinforcement of the existing floor framing as required to support HRU-2.

D. Option Item 4 – Replace electrical panels due to code violations.

E. Option Item 5 – Replace obsolete electrical panels.

F. Option Item 6 – Install advance meter system at the office building.

1.06 USE OF PREMISES

A. General: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits and as indicated by requirements of this Section. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. A staging area will be designated for the Contractor’s use. Its location will be coordinated with the Government.

C. Driveways, Walkways and Entrances: Keep driveways, loading areas, and entrances serving premises clear and available to Wrangell Compound’s employees and guests, and to emergency vehicles at all times. Do not use these areas for parking or for storage of materials.

erinclay Line erinclay Typewritten Text

NIC

erinclay Line erinclay

05/14/2021 011000 Summary of Work Page 3 of 4

1. Schedule deliveries to minimize use of driveways and entrances by construction operations.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

D. Condition of Existing Building: Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

E. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.

1.07 COORDINATION WITH OCCUPANTS

A. Wrangell Compound will be in full operation during entire construction period.

Cooperate with the Government during construction operations to minimize conflicts and facilitate site operations. Perform the Work so as not to interfere with day-to-day operations. Maintain existing exits unless otherwise indicated.

1. Provide a proposed work schedule at the pre-work meeting complete with dates. Update the schedule as needed and provide a minimum of 2-week notification of any changes.

2. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the Contracting Officer.

1.08 WORK RESTRICTIONS

A. Work Restrictions, General: Comply with restrictions on construction operations.

B. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to occupancy with the Contracting Officer.

1. Notify Contracting Officer not less than two weeks in advance of proposed disruptive operations. Update the Contracting Officer as soon as possible if changes need to be made within that two-week window.

2. Obtain Contracting Officer’s written permission before proceeding with disruptive operations.

C. On-Site Work Hours, Utility Interruptions and Noise Restrictions:

1. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by the Government or others.

D. Restricted Substances: Use of tobacco products and other controlled substances within the existing building is not permitted.

05/14/2021 011000 Summary of Work Page 4 of 4

1.09 SALVAGE MATERIAL AND EQUIPMENT

A. Items designated by the Contracting Officer to be salvaged remain on the property of the Government. Segregate, itemize, deliver and off-load the salvaged property per Government requirements.

B. Provide a salvage plan, listing material and equipment to be salvaged, and their storage location.

C. Maintain property control records for material or equipment designated as salvage.

Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials disposition by the Contracting Officer.

1.10 SPECIFICATIONS

A. The project specifications are in the document are titled “Wrangell Compound HVAC Renovation”.

1.11 PROJECT CONSTRUCTION TIMING

A. Beneficial occupancy shall occur upon successful commissioning of new system.

Work shall be coordinated with US Forest Service Contracting Officer and COR.

B. If the Option Items are awarded, they will need to be completed in the same timeframe as Base Bid.

2. PART 2 – PRODUCTS

2.01 GENERAL

A. All products incorporated into the construction project shall be new unless specifically indicated otherwise in the project drawings or other specification sections.

3. PART 3 – EXECUTION

3.01 GENERAL

A. Perform all work indicated in the project drawings and specifications.

3.02 OPERATIONS AND SECURITY

A. The contractor shall keep a clean site. All stored materials shall be secured so they do not blow around. All construction debris shall be immediately placed in an enclosed container.

3.03 CONTRACTOR STAGING AND STORAGE AREA

A. Contractor staging and storage area size and location shall be coordinated with USFS Contracting Officer. Materials shall be secured and protected from the weather and adverse environmental conditions.

END OF SECTION 011000

05/14/2021 011400 Work Area Restrictions Page 1 of 2

SECTION 011400

WORK AREA RESTRICTIONS

1. PART 1 – GENERAL

1.01 SUBMITTALS

A. Submit the following in accordance with Section 013300 “Submittal Procedures”:

1. Preconstruction Submittals:

a. Contractor Regulations

b. Transportation of Personnel, Materials, and Equipment; List of Contact

Personnel

c. Personnel List

d. Vehicle List

1.02 SPECIAL SCHEDULING RQEUIREMENTS

A. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.

B. The facility will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.

C. Permission to interrupt any roads or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

1.03 ACTIVITY REGULATIONS

A. Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations.

Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Clearly mark all Contractor’s equipment for identification.

1.04 SUBCONTRACTOR AND PERSONNEL CONTACTS

A. Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.05 IDENTIFICATION BADGES AND ACCESS

A. Application for, and use of, badges will be as directed. Obtain access to the installation by coordination with US Forest Service Contracting Officer.

1.06 NO SMOKING POLICY

A. Smoking is prohibited within and outside of all buildings, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

05/14/2021 011400 Work Area Restrictions Page 2 of 2

1.07 WORKING HOURS

A. Regular working hours must consist of a period established by the Contractor Officer, between 7:30 a.m. and 5:30 p.m., Monday through Friday, excluding Government holidays.

1.08 WORK OUTSIDE REGULAR HOURS

A. Work outside regular working hours requires Contracting Officer approval. Make application 5 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title.

Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer.

1.09 EXCLUSIONARY PERIOD

A. No work must be performed during the period 6pm to 6am, inclusive, without prior written approval of the Contracting Officer. This period has not been considered in computing the time allowed for the performance of this contract.

1.10 OCCUPIED BUILDING

A. The Contractor shall be working in an existing building, which is occupied.

B. Relocate movable furniture away from the Contractor's working area, protect the furniture, and replace the furniture in accordance with the furniture and equipment plan.

2. PART 2 – PRODUCTS

NOT USED.

3. PART 3 – EXECUTION

NOT USED.

END OF SECTION 011400

05/14/2021 012300 Options Page 1 of 1

SECTION 012300

OPTIONS

1. PART 1 – GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.02 SUMMARY

A. Option: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to the base bid amount if the Government decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.

1. Options described are part of the Work only if enumerated in the Agreement.

2. The cost or credit for each Option is the net addition to the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum.

1.03 PROCEDURES

A. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the option into Project.

1. Include as part of each option, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete Work whether or not indicated as part of option.

B. Notification: Immediately following award of the Contract, the Contracting Officer shall notify the Contractor, in writing, of the status of each option. Indicate if options have been accepted, rejected, or deferred for later consideration. Include a complete description of negotiated revisions to options.

C. Execute accepted options under the same conditions as other Work of the Contract.

1.04 SCHEDULE OF OPTIONS

A. Descriptions of the options are found in the Schedule of Items and Contract Documents.

2. PART 2 – PRODUCTS

NOT USED.

3. PART 3 – EXECUTION

END OF SECTION 012300

05/14/2021 012500 Substitution Procedures Page 1 of 3

SECTION 012500

SUBSTITUTION PROCEDURES

1. PART 1 – GENERAL

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.02 SUMMARY

A. Section includes administrative and procedural requirements for substitutions.

1.03 DEFINITIONS

A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor.

1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms.

2. Substitutions for Convenience: Changes proposed by Contractor or Contracting Officer that are not required in order to meet other Project requirements but may offer advantage to Contractor or Government.

1.04 ACTION SUBMITTALS

A. Substitution Requests: Submit one electronic .pdf copy of each request for consideration. The electronic copy shall be provided by the manufacturer, and not a scanned version by the contractor. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.

B. Documentation: Show compliance with requirements for substitutions and the following, as applicable:

1. Statement indicating why specified product or fabrication or installation method cannot be provided, if applicable.

2. Coordination of information, including a list of changes or revisions needed for other parts of the Work that will be necessary to accommodate proposed substitution.

3. Detailed comparison of salient qualities of proposed substitutions with those of the Work specified. Include annotated copy of applicable Specification Section. Salient qualities may include attributes, such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.

4. Product Data, including drawings and descriptions of products and fabrication and installation procedures.

5. Samples, where applicable or requested.

05/14/2021 012500 Substitution Procedures Page 2 of 3

6. Certificates and qualification data, where applicable or requested.

7. List of similar installations for completed projects, with project names and addresses as well as names and addresses of architects and owners.

8. Material test reports from…