Technical Evaluation Critical Factor List.docx
DOCX document 27 KB Posted
- Attached to
- Autoclave System Upgrade Federal contract opportunity
- Solicitation number
- FA812622Q0035
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA812622Q0035.pdf | ||
| Appendix A - Autoclave Upgrade Purchase.pdf | ||
| Statement of Work.docx | DOCX document | |
| Item description.docx | DOCX document | |
| Appendix C - Autoclave Upgrade Purchase.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL PROPOSAL EVALUATION-CRITICAL FACTOR LIST
SPECIFIC REQUIREMENT
•Vacuum System upgrades to include labor, engineering and materials for the following:
O Replacement of the Vacuum/Vent manifolds with a Walton Process Technology (WPT) vacuum header manifold with all wiring, gauges and tubing required to make the system operational.
O Replacement of Threaded Vacuum fittings with stainless steel tubing.
O Replacement of four (4) vacuum source pass throughs.
O Replacement of four (4) vacuum probe pass throughs.
O Replacement of two (2) ½” proportional valves on the vacuum system.
O Replacement of one (1) ½” trim valve, digital, fail close.
O Replacement of one (1) each 1-1/2” main cooling valve, digital fail close.
O Replacement of one (1) each 1-1/2” vent valve.
O Replacement of copper tubing from vacuum pump to vacuum header manifold with stainless steel or copper tubing.
O Preprogramming of the PLC code.
O Replace pneumatic tubing and fittings from door control valve to door open/close actuator.
O Replace copper tubing from the vacuum pump to the vacuum header
•One (1) Oxygen Analyzer System
•One (1) Nitrogen Block and Bleed System
•One (1) WPT PCS 2.0 Process Controller
•To include Installation, Testing, Tuning and Training
• The result of the vacuum upgrade shall be a vacuum of 28 inches of mercury, unless there are vacuum leaks upstream of the connection at the vacuum pump
• The result of the operating system upgrade shall allow for access to and import of historical data into the new operating system and reports
• Training will be for up to seven people and be 4-6 hours in length and be conducted between the hours of 0800 and 1400. The training will include recipe development, operational instructions and theory behind the oxygen analyzer system and the double block and bleed system
2 September 2016