TE-1 Site and Equipment Images.pdf
PDF 11 MB Posted
- Attached to
- Building 501 Chiller Replacement Federal contract opportunity
- Solicitation number
- FA303021Q0025
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment FA303021Q00250001 SF 30.pdf | ||
| Questions and Answers 1.pdf | ||
| Form 66 Submittal Schedule B501 Air Cooled Chiller Replacement.xlsx | XLSX spreadsheet | |
| DOD Contractor Guide.pdf | ||
| FA303021Q0025.pdf | ||
| SOW_2021_B501 REPLACE AIR COOLED CHILLER.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Existing Multistack Air Cooled 120 ton Chiller:
West side of Building 501
B501 Chiller Replacement
B501 Exisiting Multistack Air Cooled Chiller Data Plates
Existing Multistack Air Cooled 120 ton Chiller: West side of Building 501
Existing Chilled Water Supply / Return Lines: West side of Building 501
Supply / Return Lines
B501 Multistack Chiller Service Disconnect with Data Plate
Remove & Replace 120 ton air cooled chiller
Note: EMCS wiring and equipment will be removed and re-installed, Contractor will verify with 17 CES EMCS & HVAC personnel that the new chiller is connected
Modify / Alter Existing Electrical Conduit as needed to accomplish connection
Tie new chilled water supply / return lines into existing at this point
West side of Building 501
Remove & Replace 120 ton air cooled chiller
Tie new chilled water supply / return lines into existing at this point
Remove and Replace Y Strainer
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
File details come from the government source that posted it. Updated .