This is a Statement of Work (SOW) for a Tank Assembly project requiring the contractor to provide enclosed ballistic tanks for an existing 40mm Single-Stage Light Gas Gun. The tanks must include target chambers with access ports, clear polycarbonate covers, feed-through ports, steel block-off plates, adapter flanges, and vacuum sealing capability. The contractor must also provide support rails, vacuum pump systems, control valves, and transducers for tank evacuation.
Key requirements include providing necessary PPE for contractor employees, obtaining TPOC design approval before fabrication, removing existing rail systems and installing new ones, delivering and installing the tanks, and demonstrating the system to NSWCDD. The work is unclassified and requires two personnel to travel to Dahlgren, VA for five days. The government will handle equipment offloading and provide point location. This SOW appears to be part of solicitation N0017825Q6668 for the Naval Surface Warfare Center Dahlgren Division, with Physics Applications, Inc. identified as the intended sole-source contractor due to their prior experience with the single-stage gas gun system.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0017825Q6668 SF18.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3.7 The Contractor shall coordinate with the technical point of contact (TPOC) identified below to deliver, install, and demo the equipment.
4.0 GOVERNMENT-FURNISHED PROPERTY/MATERIAL/INFORMATION
(GFP/GFM/GFI)
The Government will be responsible for offloading the equipment and providing point location
5.0 SECURITY
The work to be performed under this contract is unclassified.
6.0 TRAVEL
The contractor will be required to travel in performance of this contract. The number of trips and types of personnel traveling shall be limited to the minimum required to accomplish work requirements and shall be coordinated with the technical point of contact. All travel shall be conducted in accordance with the Federal Travel Regulations (FTR). The following travel is anticipated: Two personnel to Dahlgren, VA for five (5) travel days.
7.0 TECHNICAL POINT OF CONTACT
To be provided at time of award.