T12 Sol_75H71025Q00290.pdf
PDF 12 MB Posted
- Attached to
- KHC FIRE ALARM TESTING AND INSPECTION SERVICES Federal contract opportunity
- Solicitation number
- 75H71025Q00290
About this file
This is a Solicitation/Contract for Commercial Items for fire alarm system testing and inspection services at the Kayenta Health Center in Kayenta, Arizona. The contract (Solicitation Number 75H71025Q00290) is for a base year and three option years, covering annual and quarterly fire protection system inspections including fire alarm system testing, fire sprinkler system inspection, pre-action/dry valve system inspection, fire pump testing, backflow valve inspection, and fire hydrant testing. The contract period runs from 09/01/2025 to 08/31/2029, with a base year from 09/01/2025 to 08/31/2026 and three consecutive one-year option periods.
The solicitation is designated for small businesses, specifically noting eligibility for service-disabled veteran-owned small businesses (SDVOSB), women-owned small businesses (WOSB), and HUBZone small businesses. The contract will be awarded to a contractor knowledgeable about NFPA codes and capable of providing comprehensive fire system inspections and maintenance at the Kayenta Health Center, which is located on the Navajo Reservation and requires specialized technical expertise. The contract includes provisions for Navajo Nation sales tax and requires the contractor to comply with various federal acquisition regulations, Indian preference requirements, and provide detailed reporting and documentation of all system inspections and tests.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| T12 Sol_75H71025Q00290_amnd P00001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
Highway 160, Mile Post 394.3 PO Box 368 Acquisition Department Kayenta Health Center
CODE 16. ADMINISTERED BYCODE
X
X
238210
SIZE STANDARD:
% FOR:SET ASIDE:UNRESTRICTED OR25
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
08/21/2025 1000 ET
08/18/2025
DAISHA RICHARDS
(No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
75H71025Q00290
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 54 OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
Kayenta AZ 86033
TELEPHONE NO.
17a. CONTRACTOR/
Kayenta AZ 86033 US Hwy 160 South Milepost 394.3 Kayenta Health Center
15. DELIVER TO
Kayenta AZ 86033 Highway 160, Mile Post 394.3 PO Box 368 Acquisition Department
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$19
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULEX
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
Kayenta Health Center
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
This contract is subject to the electronic payment process by the Department of Treasury.
All invoices complying to the requirements at 52.212-4(g) must be submitted through www.ipp.gov. For additional information, refer to the incorporated clause at 352.232-71 Electronic Submission of Payment Requests (FEB 2022).
Period of Performance: 09/01/2025 to 08/31/2026
Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
XX
DATED
JERLYN R. BEGAY
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
1 Base Year:
Annual Fire Alarm System Test
Quarterly Fire Sprinkler System Inspection and
Test
Quarterly Pre-Action/Dry Valve System Inspection
Annual Fire Pump Inspection and Test
Annual Backflow Valve Inspection and Test
Fire Hydrant Test and Inspection
Delivery: 08/31/2026
Delivery Location Code: IHSKAYENTA
KAYENTA NAVAJO
Kayenta Health Center
Acquisition Department, PO Box 368
Highway 160, Mile Post 394.3
Kayenta AZ 86033 US
2 Base Year:
Navajo Nation Sales Tax
Delivery: 08/31/2026
Delivery Location Code: IHSKAYENTA
KAYENTA NAVAJO
Kayenta Health Center
Acquisition Department, PO Box 368
Highway 160, Mile Post 394.3
Kayenta AZ 86033 US
Continued ...
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
54 2 of
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 54
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
75H71025Q00290
3 Option Year 1:
Annual Fire Alarm System Test
Quarterly Fire Sprinkler System Inspection and
Test
Quarterly Pre-Action/Dry Valve System Inspection
Annual Fire Pump Inspection and Test
Annual Backflow Valve Inspection and Test
Fire Hydrant Test and Inspection
(Option Line Item)
09/01/2026
Delivery: 08/31/2027
Delivery Location Code: IHSKAYENTA
IHSKAYENTA
Kayenta Health Center
Acquisition Department, PO Box 368
Highway 160, Mile Post 394.3
Kayenta AZ 86033 US
Period of Performance: 09/01/2026 to 08/31/2027
4 Option Year 1:
Navajo Nation Tax
(Option Line Item)
09/01/2026
Delivery: 08/31/2027
Delivery Location Code: IHSKAYENTA
IHSKAYENTA
Kayenta Health Center
Acquisition Department, PO Box 368
Highway 160, Mile Post 394.3
Kayenta AZ 86033 US
Period of Performance: 09/01/2026 to 08/31/2027
5 Option Year 2:
Annual Fire Alarm System Test
Quarterly Fire Sprinkler System Inspection and
Test
Quarterly Pre-Action/Dry Valve System Inspection
Annual Fire Pump Inspection and Test
Annual Backflow Valve Inspection and Test
Fire Hydrant Test and Inspection
(Option Line Item)
09/01/2027
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
4 54
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
75H71025Q00290
Delivery: 08/31/2028
Delivery Location Code: IHSKAYENTA
IHSKAYENTA
Kayenta Health Center
Acquisition Department, PO Box 368
Highway 160, Mile Post 394.3
Kayenta AZ 86033 US
Period of Performance: 09/01/2027 to 08/31/2028
6 Option Year 2:
Navajo Nation Tax
(Option Line Item)
09/01/2027
Delivery: 08/31/2028
Delivery Location Code: IHSKAYENTA
IHSKAYENTA
Kayenta Health Center
Acquisition Department, PO Box 368
Highway 160, Mile Post 394.3
Kayenta AZ 86033 US
Period of Performance: 09/01/2027 to 08/31/2028
7 Option Year 3:
Annual Fire Alarm System Test
Quarterly Fire Sprinkler System Inspection and
Test
Quarterly Pre-Action/Dry Valve System Inspection
Annual Fire Pump Inspection and Test
Annual Backflow Valve Inspection and Test
Fire Hydrant Test and Inspection
(Option Line Item)
09/01/2028
Delivery: 08/31/2029
Delivery Location Code: IHSKAYENTA
IHSKAYENTA
Kayenta Health Center
Acquisition Department, PO Box 368
Highway 160, Mile Post 394.3
Kayenta AZ 86033 US
Period of Performance: 09/01/2028 to 08/31/2029
8 Option Year 3:
Navajo Nation Tax
(Option Line Item)
09/01/2028
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
5 54
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
75H71025Q00290
Delivery: 08/31/2029
Delivery Location Code: IHSKAYENTA
IHSKAYENTA
Kayenta Health Center
Acquisition Department, PO Box 368
Highway 160, Mile Post 394.3
Kayenta AZ 86033 US
Period of Performance: 09/01/2028 to 08/31/2029
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
STATEMENT OF WORK
FOR
ANNUAL FIRE ALARM SYSTEM TESTING & INSPECTION
AT
KAYENTA HEALTH CARE CENTER
KAYENTA, ARIZONA
September 30, 2024
KAYENTA HEALTH CARE CENTER
1. Introduction:
1.1. The Annual & Quarterly Fire Alarm Inspection & Testing project will be within the Navajo Reservation at Kayenta, Arizona on 190,000 square feet medical facilities. The Kayenta Health Center (KHC) is located off US Highway 160, 1/2-mile south of MP 394.3. EST3 Fire Alarm System is the existing fire alarm system. This project requires vendor’s expertise for the compliance of Hospital NFPA 72/25, The Joint Commission/CMS Life Safety, and Preventive Maintenance of Fire Alarm System at the Health Care Center. Kayenta Service Unit is at a remote location; the nearest town is a two-hour drive. Contractor must be knowledgeable with current system in place.
2. PROJECT BACKGROUND
2.1. This is a turn-key project for contractor to complete annual and quarterly inspections of the fire alarm system, inspection of fire sprinkler system, inspection/testing of fire pump, pre-action/dry valve system inspection and backflow inspection/testing. Contractor must be knowledgeable of NFPA Codes, Repair EST fire alarm system and proper reporting required by hospital.
2.2. The objective of the EST3 Fire Alarm Annual Inspection & Test project is to have a fully operational fire alarm system and fully compliance with Hospital NFPA 72/25 at Kayenta Health Center. Contractor to provide technical support for maintenance and on-call service at KHC.
3. PROJECT DESCRIPTION:
3.1. The contractor shall prepare a proposal, and upon award, shall provide an accurate timeline to complete the project and following will perform the work to completion.
3.2. Annual Fire Alarm Inspection includes the following work:
a. There should be no standing trouble alarm when contractors leave the KHC premise
b. Annual Fire Alarm Inspection. Contractor to inspect and test once annually in accordance with NFPA 72 2010 edition, NFPA 25 2011 edition and The Joint Commission/CMS regulations.
c. Control Equipment. Contractor to verify correct receipt of input and output signals, and circuit supervision.
d. Batteries. Contractor to inspect and test batteries per manufacture specifications.
e. Annunciators. Contractor to verify correct operation and identification of remote annunciators.
f. Elevator. Contractor to test elevator recall function and other building outputs.
g. Audible & Visual. Contractor to test the functionality of all audible and visual devices. In addition, inventory devices.
h. Lamps and LED. Contractor to inspect and test lamps and LEDs.
i. Smoke Detectors, Duct Detectors, and Heat Detectors. Contractor to perform function tests of smoke detectors, Duct Detectors, and heat detectors. In addition, inventory devices.
j. Duct Detectors. Contractor to perform function test of duct detectors.
k. Pull Station. Contractor to perform function tests of manual pull stations. In addition, inventory devices.
l. Supervisory Signal. Contractor to perform function test of all supervisory signal.
m. Valve Tamper Devices. Contractor to perform function test of valve tamper devices.
n. Water Flow Alarm Devices. Contractor to perform function test of water flow alarm devices
o. Off-site Notification. Contractor to perform function test of off-site notification.
p. System Check. Contractor to verify the alarm, trouble, and supervisory signal receipt and restoral at the monitoring station.
q. Hospital NFPA 72. Contractor to inspect and perform functional testing of fire alarm system required in NFPA 72.
r. A final report based on the NFPA requirements will be completed detailing the results of the test and will be delivered and reviewed with the owner in a timely manner.
s. Every fire alarm device test must be listed to pass or fail. This would include fire detector and smoke detectors.
t. Contractor must inform KHC of any outages needed to perform work.
u. Outage request may take up to 2 days for approval if more than 4 hours is needed.
3.3 Quarterly Fire Sprinkler Inspection. Contractor to inspect and test on a Quarterly basis.
Per NFPA 25:
a. Service will include all control valves being exercised and sealed.
b. Water pressure will be recorded including residual pressure during a main drain flow test.
c. All inspector’s test valves will be exercised and water flow alarms will be confirmed.
d. The fire sprinkler riser will be inspected for signage, valve positions, and a stocked spare sprinkler headbox.
e. All visible distribution piping will be inspected for corrosion and visible sprinkler heads inspected for discharge blockage and foreign material.
3.4 Quarterly Pre-Action/Dry Valve System Inspection
Per NFPA 25:
a. Service will include control valves being exercised and sealed.
b. Water pressure will be recorded including residual pressure during a main drain flow test.
c. All drum drips will be exercised and air pressure will be confirmed at each location.
d. The fire sprinkler riser will be inspected for signage, valve positions, damage, and proper trim piping.
e. Low air and water flow switches will be activated and checked for proper settings and verified at the panel.
f. Internal components (orifices, seat, clapper, and gasket) will be inspected after the trip test.
g. If an accelerator or exhauster is on the system these devices will be tripped, inspected, and reset.
3.5 Annual Fire Pump Test and Inspection
Per NFPA 20:
a. The inspection of the electric/diesel fire pump will be conducted under minimum, rated and peak flows of the fire pump by controlling the quantity of water discharged.
b. The test will be conducted using the available suction water supply.
c. Pump suction and discharge pressure measurements will be used to determine the total pump output.
d. The fire pump and associated control equipment will be energized and suction water will flow for the time required to take the required measurements and meet the requirements of the test.
e. Water drainage and effects from water runoff can be an environmental and safety hazard and is the responsibility of the owner to manage and maintain.
3.6 Annual Backflow Valve Test and Inspection
Per local code requirements:
a. The inspection and functional testing of the backflow check valve including a visual inspection and a mechanical test to ensure the valve is in good operating condition and is operating within the correct parameters.
b. If the backflow valve initial test indicates it is operating out of specifications, the assembly will be inspected for repair viability.
3.7 Fire Hydrant Test and Inspection
a. Fire hydrant will be visually inspected for proper components and general operating conditions.
b. The valve will be fully exercised and a flow test will be performed.
3.8 System and Service Log. The contractor will provide a log to document concerns, system problems and other related items requiring our attention. Each scheduled service visit shall begin with a review of this log.
3.9 Documentation. All equipment testing, manufacture equipment documents, authorized Client representative to verify all work completed and Hospital NFPA 72, NFPA 25, NFPA 20 compliance report.
3.10 All tested and verified fire alarm equipment must be documented on the final inspection report.
4. CRITERIA:
4.1. Codes and Standards: The contractor shall perform work in accordance with best common practices and standards;
a. Safety and Hazard Awareness (PPE, jobs-specific hazards, Electrical isolation).
b. NFPA criteria
c. The Joint Commission standards and regulations
d. CMS standards and regulations
5. GENERAL REQUIREMENTS:
5.1. Contractor shall develop a set engineered plan and accurate timeline to present to the KHC project representative prior to the project start date.
5.2. Contractor is responsible for furnishing all tools, materials, and equipment to complete the project.
5.3. A report and walkthrough of the work area will be necessary after the completion of the project.
5.4. Work area should be well kept and free of trash and debris after workdays.
5.5. Ceiling tiles, flooring, and other “affected by construction” activities need to be repaired/replaced with the project completion.
5.6. The contractor shall perform work between the hours of 8:00 am and 5:00 pm Monday through
Friday excluding Federal Holidays. Alternate hours work must be requested and approved with
KHC.
5.7. The contractor shall furnish a schedule of the dates agreed upon with the project officer and the facility manager at least two weeks in advance.
5.8. Any foreseen or unplanned costs, work hours, or changes that will affect or incur extra costs to KHC, need to be brought to the attention of the KHC project representative before proceeding with this matter.
5.9. Contractor is encouraged to schedule a walkthrough of the project with the KHC maintenance department.
5.10. The Contractor must be mindful of keeping normal business activity uninterrupted.
5.11. The contractor is expected to be professional and efficient with his work.
5.12. The contractor to follow all safety policies and regulations. Provide written safety Method of
Procedure (MOP).
6. SPECIAL REQUIREMENTS
6.1. Any pre-assembly of equipment must be done at the contractor’s facilities, while other work can be done at the hospital.
6.2. Contractor is required to obtain an identification badge (ID) before starting work at KHC. *This process can take up to 4 hours depending on the number of workers.
6.3. Contractor shall wear ID badge on KHC premises and check in with security every day.
7. Period of Performance
7.1. Period of performance from contract award date to December 31, 2025.
8. Contact information:
9. Warranty
10.1 Workmanship warranty one year.