File Type Posted
Synchro Resolver Standard CSS 2021_10-15-2021_.doc DOC document
SynchroResolver_SSN_SOW.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

DATA ITEM DESCRIPTION

Title: CALIBRATION CERTIFICATE

Number: DI-QCIC-80798B Approval Date: 20050328 AMSC Number: F7554 Limitation:

DTIC Applicable: GIDEP Applicable:

Preparing Activity: AFMETCAL DET 1/MLE Applicable Forms: None Use, Relationships:

This Data Item Description (DID) contains the format and content requirements for calibration reports or certificates accompanying calibrations performed on DoD test, measurement, and diagnostic equipment.

This DID is applicable to contracts requiring calibration of test equipment prior to delivery. This DID is consistent with ISO 17025 requirements for calibration reports or certificate.

This DID supersedes DI-QCIC-80798A.

Requirements:

1. Format. Contractor format is acceptable.

2. Content. The calibration certificate or report shall include:

a. title (e.g., calibration report or calibration certificate);

b. the name and address of the laboratory, and the location where the calibrations were carried out, if different from the address of the laboratory;

c. unique identification of the test report or calibration certificate (such as the serial number), and on each page an identification in order to ensure that the page is recognized as a part of the test report or calibration certificate, and a clear identification of the end of the test report or calibration certificate;

d. the name and address of the client or customer;

e. identification of the method used;

f. a description of, the condition of, and unambiguous identification of the item(s) tested or calibrated;

g. the date of receipt of the test or calibration item(s) where this is critical to the validity and application of the results, and the date(s) of performance of the test or calibration;

Downloaded from http://www.everyspec.com

DI-QCIC-80798B

h. reference to the sampling plan and procedures used by the laboratory or other bodies where these are relevant to the validity or application of the results;

i. the test or calibration results with, where appropriate, the units of measurement;

j. the name(s), function(s) and signature(s) or equivalent identification of person(s) authorizing the test report or calibration certificate;

k. where relevant, a statement to the effect that the results relate only to the items tested or calibrated;

l. the conditions (e.g. environmental) under which the calibrations were made that have an influence on the measurement results;

m. the uncertainty of measurement or a statement of compliance with an identified metrological specification or clauses thereof;

n. evidence that the measurements are traceable.

End of DI-QCIC-80798B

Downloaded from http://www.everyspec.com

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Source: http://assist.dla.mil -- Downloaded: 2019-06-10T17:16Z Check the source to verify that this is the current version before use.

Source: http://assist.dla.mil -- Downloaded: 2019-06-10T17:16Z

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Source: http://assist.dla.mil -- Downloaded: 2019-06-10T17:17Z

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Data Item Description

Title: Software/Firmware Change Request Approval Date: 20100420 Number: DI-MISC-81807 Limitation: N/A AMSC Number: N9130 GIDEP Applicable: N/A DTIC Applicable: N/A Office of Primary Responsibility: SH/PMS-408 Applicable Forms: N/A

Use/relationship: The Software/ Firmware Change Request will be used to alert or inform the government about changes to software and firmware and also to provide detailed information to the government about the changes and the estimated cost of the software/firmware changes.

This DID contains the format, content and preparation instructions for the data product generated by the specific and discrete work task requirement as delineated in the contract.

Requirements:

1. Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions shall be as specified in the contract.

2. Format. The Software/Firmware Change Request shall be presented in the Contractor’s format.

3. Content. The Software/Firmware Change Request shall contain all the information identified in Figures 1-7.

4. End of DI-MISC-81807.

Page 1 of 8 Pages

DI-MISC-81807

SOFTWARE CHANGE REQUEST (SCR), PAGE 1

2. DATE

3. JUSTIFICATION CODE

1. ORIGINATOR NAME AND ADDRESS (include e-mail address and telephone number)

Name:

Organization:

Street 1:

Street 2:

City, State, Zip Code:

Telephone Number: ( ) ext:: E-mail address:

4. TYPE OF SCR

Class I Class II

5. PRIORITY

Emergency Urgent Routine

6. SCR DESIGNATION 7. BASELINE AFFECTED

a. CI/CSCI AFFECTED

b. CAGE CODE

c. SYSTEM DESIGNATION

FUNCTIONAL ALLOCATED PRODUCT

d. SCR No.

e. REVISION

f. TYPE Preliminary Final

8. OTHER SYS/CONFIG ITEMS AFFECTED

YES NO

9. IN PRODUCTIO N

YES NO

10. DOCUMENTS AFFECTED

CAGE CODE SPEC/DOC NO. REVISION SCN/NOR/ECN/ECO NO.

11. TITLE OF CHANGE

12. CONTRACT NO. & LINE ITEM

13. CONFIGURATION ITEM NOMENCLATURE

14. PROCURING CONTRACTING OFFICER

15. LOWEST ASSEMBLY AFFECTED

a. NOMENCLATURE

b. PART NO.

16. DESCRIPTION OF CHANGE

17. NEED FOR CHANGE

18. PRODUCTION EFFECTIVITY BY SERIAL NUMBER

19. EFFECT ON PRODUCTION DELIVERY

SCHEDULE

20. RETROFIT

a. RECOMMENDED ITEM EFFECTIVITY

b. ESTIMATED KIT DELIVERY SCHEDULE

c. PLATFORMS AFFECTED

21. ESTIMATED COST or (SAVINGS) UNDER CONTRACT

No Additional Cost/Savings – In Scope of the Contract

22. SUBMITTING ACTIVITY AUTHORIZING SIGNATURE

22a. TITLE

23. APPROVAL/DISAPPROVAL

a. LCCB CHAIRMAN

DATE :

RECOMMEND APPROVAL

RECOMMNED DISAPPROVAL

b. CCB CHAIRMAN

DATE :

APPROVED

DISAPPROVED

Figure 1 Page 2 of 8 Pages

SOFTWARE CHANGE REQUEST (SCR), Figure 2

SCR NUMBER & REV:

EFFECT ON FUNCTIONAL/ALLOCATED CONFIGURATION IDENTIFICATION

24. OTHER SYSTEMS AFFECTED

25. OTHER CONTRACTORS/ACTIVITIES AFFECTED

26. CONFIGURATION ITEMS AFFECTED

27. EFFECTS ON PERFORMANCE ALLOCATIONS AND INTERFACES IN SYSTEM SPECIFICATION

28. EFFECTS ON EMPLOYMENT, INTEGRATED LOGISTICS SUPPORT, TRAINING, OPERATIONAL, EFFECTIVENESS, OR SOFTWARE

29. EFFECTS ON CONFIGURATION ITEM SPECIFICATIONS

30. DEVELOPMENTAL REQUIREMENTS AND STATUS

31. TRADE-OFFS AND ALTERNATIVE SOLUTIONS

32. DATE BY WHICH CONTRACTUAL AUTHORITY IS NEEDED

Figure 2 Page 3 of 8 Pages

SOFTWARE CHANGE REQUEST (SCR), Figure 3

SCR NUMBER & REV:

EFFECTS ON PRODUCT CONFIGURATION IDENTIFICATION, LOGISTICS, AND OPERATIONS

(X) FACTOR ENCL. PAR. (X) FACTOR ENCL. PAR.

33. EFFECT ON PRODUCT CONFIGURATION

IDENTIFICATION OR CONTRACT

35. EFFECT ON OPERATIONAL

EMPLOYMENT

a. PERFORMANCE a. SAFETY

b. WEIGHT-BALANCE STABILITY (Aircraft) N/A N/A b. SURVIVABILITY

c. WEIGHT-MOMENT (Other equipment) N/A N/A c. RELIABILITY

d. CDRL, TECHNICAL DATA d. MAINTAINABILITY

e. NOMENCLATURE e. SERVICE LIFE

f. OPERATING PROCEDURES

g. ELECTROMAGNETIC INTERFERENCE 34. EFFECT ON INTEGRATED LOGISTICS

SUPPORT (ILS) ELEMENTS

h. ACTIVATION SCHEDULE

a. ILS PLANS i. CRITICAL SINGLE POINT FAILURE ITEMS

b. MAINTENANCE CONCEPT, PLANS, PROCEDURES j. INTEROPERABILITY c LOGISTICS SUPPORT ANALYSIS

d. INTERIM SUPPORT PROGRAMS 36. OTHER CONSIDERATIONS

e. SPARES AND REPAIR PARTS N/A N/A a. INTERFACE

f. TECH MANUALS/PROGRAMMING TAPES b. OTHER AFFECTED EQUIPMENT/GFE/GFP N/A N/A

g. FACILITIES N/A N/A c. PHYSICAL CONSTRAINTS N/A N/A P h. SUPPORT EQUIPMENT N/A N/A d. COMPUTER PROGRAMS AND RESOURCES

i. OPERATOR TRAINING e. REWORK OF OTHER EQUIPMENT N/A N/A

j. OPERATING TRAINING EQUIPMENT f. SYSTEM TEST PROCEDURES

k. MAINTENANCE TRAINING g. WARRANTY/GUARANTEE

l. MAINTENANCE TRAINING EQUIPMENT h. PARTS CONTROL N/A N/A

m. CONTRACT MAINTENANCE i. ENVIRONMENTAL

n. PACKAGING , HANDLING, STORAGE, AND

TRANSPORTABILITY

N/A N/A j. FMS RELEASE

37. ALTERNATE SOLUTIONS

38. DEVELOPMENTAL STATUS

39. RECOMMENDATIONS FOR RETROFIT

40. WORK-HOURS PER UNIT TO INSTALL RETROFIT KITS

a. ORGANIZATION

b. INTERMEDIATE

c. DEPOT

d. OTHER

41. WORK-HOURS TO CONDUCT SYSTEM TESTS AFTER RETROFIT

42. THIS CHANGE MUST BE ACCOMPLISHED

BEFORE WITH AFTER THE FOLLOWING CHANGES:

43. IS CONTRACTOR FIELD

SERVICE ENGINEERING

REQUIRED?

YES NO

44. OUT-OF-SERVICE TIME

45. EFFECT OF THIS SCR AND PREVIOUSLY APPROVED SCRs

46. DATE CONTRACTUAL AUTHORITY NEEDED

FOR PRODUCTION:

FOR RETROFIT:

Figure 3 Page 4 of 8 Pages

Figure 4 Page 5 of 8 Pages

SOFTWARE CHANGE REQUEST (SCR), Figure 5 SCR NUMBER and REV:

48. ESTIMATED COSTS SAVINGS/SUMMARY, RELATED SCRs (Use parentheses for savings)

FACTOR

CAGE CODE

(a)

SCR NUMBER

(b)

COSTS/SAVINGS

UNDER CONTRACT

(c)

OTHER COSTS/

SAVINGS

(d)

a. PRODUCTION COST/SAVING (Subtotal of Costs/Savings Elements from block 51a applicable to aircraft, ship, tank, vehicle, missile, or its subsystem)

SUBTOTAL PRODUCTION COSTS/SAVINGS

b. RETROFIT COSTS (Applicable to aircraft, ship, tank, vehicle, missile, or its subsystem)

SUBTOTAL RETROFIT COSTS

c. INTEGRATED LOGISTICS SUPPORT COSTS/SAVING REVISED

REQUIREMENTS

(1) ITEM RETROFIT (If not covered under “b”) (Applicable to aircraft, ship tank, vehicle, missile, or its subsystem)

(2) ILS SUBTOTAL (Applicable to aircraft, ship, tank, vehicle, missile or its subsystem)

(3) OPERATOR TRAINER (Net total cost/saving from each SCR covering operator trainer)

(4) MAINTENANCE TRAINER (Net total cost/saving from each SCR covering maintenance trainer)

(5) OTHER TRAINING EQUIPMENT

(6) SUPPORT EQUIPMENT (Net total cost/saving from each SCR on support equipment)

(7) ILS PLANS

(8) MAINTENANCE CONCEPT, PLANS, SYSTEM DOCUMENTS

(9) INTERIM SUPPORT PLAN

RECURRING COSTS

NEW REQUIREMENTS

PROCURIN

G

ACTIVITY

CODE

NON-

RECURRING

COSTS UNIT QTY TOTAL

(10) PROVISIONING DOCUMENTATION

(11) OPER TRNR/TRNG DEVICES/EQUIP

(12) MANUALS/PROGRAMMING TAPES, SPARES,

REPAIR PARTS (For 11)

(13) MAINTENANCE TRNR/TRNG DEVICES/

EQUIPMENT

(14) MANUALS/PROGRAMMING TAPES, SPARES,

REPAIR PARTS (For 13)

(15) SUPPORT EQUIPMENT

(16) MANUALS/PROGRAMMING TAPES (For 15)

(17) PROVISIONING DOCUMENTATION (For 15)

(18) REPAIR PARTS (For 15) N/A N/A N/A N/A N/A N/A N/A

(19) SUBTOTAL ILS COSTS/SAVINGS (Sum of c. 1 through c. 18)

CAGE CODE SCR NUMBER

d. OTHER COSTS/SAVINGS (Total from block 48d of related SCRs)

TOTAL OTHER COSTS/SAVINGS

SUBTOTALS OF COLUMNS

SUBTOTAL UNDER CONTRACT

Figure 5 Pages 6 of 8 Pages

SOFTWARE CHANGE REQUEST (SCR), Figure 6

SCR NUMBER and REV:

49. TITLE OF CHANGE

50. DATE AUTHORIZATION TO PROCEED

RECEIVED BY CONTRACTOR (YYMMDD)

S START DELIVERY C COMPLETED DELIVERY PROGRESS POINT

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

Figure 6 Page 7 of 8 Pages a.

C O

(1) Software Engineering

N F I

(2) Software Documentation

G U R

(3) Software Engineering Test

A T

(4) Update TDP b.

S

(1) Software Engineering Environment Upgrade

P

(2) Software Test Environment Upgrade

E Q

M c.

(1) Operator

A

(2) Maintenance

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 2

26 27 28 29 30 31 32 33 34 35 36

SOFTWARE CHANGE REQUEST (SCR), Continuation Sheet, Figure 7

TITLE OF CHANGE

SCR NUMBER and REV:

PARAGRAPH# BLOCK/LINE NO. BLOCK TITLE AND SUPPLEMENTARY INFORMATION

Figure 7 Page 8 of 8 Pages

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DATA ITEM DESCRIPTION

Title: COMMERCIAL OFF-THE-SHELF (COTS) MANUALS AND ASSOCIATED

SUPPLEMENTAL DATA

Number: DI-TMSS-80527C Approval Date: 20110812 AMSC Number: 9207 Limitation: No DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: TM

Applicable Forms: None

Use/relationship: Commercial Off-the-Shelf Manuals may be used as is or with supplementation to support COTS equipment used by DOD. This DID is used to:

a. Acquire sample COTS manuals for evaluation.

b. Acquire COTS manuals which have been evaluated and found to be acceptable.

c. Acquire associated supplemental data, if required.

This DID contains format, content, and intended use information for the data deliverable(s) resulting from the work described in MIL-PRF-32216.

This DID supersedes DI-TMSS-80527B, dated 17 Oct 2006.

Requirements:

1. Content. The manual shall contain all technical information on the assembly, installation, operation, parts, and maintenance of commercial equipment.

2. Evaluation. The manual shall be evaluated using the criteria found in MIL-PRF-32216.

3. Supplementation. The manual may be supplemented with additional data to comply with contract. Supplemental data shall be prepared in accordance with MIL-PRF-32216.

4. Format. The basic manual shall be in the contractor's format. Supplemental data shall be in the format specified by the contracting activity.

5. Digital files. Interactive Electronic Technical Manuals (IETMs) or PDFs are preferred for electronic COTS manuals.

6. PDF Files. PDF files shall be searchable, capable of having links added, and have fonts embedded.

7. IETMs. IETMs shall meet the general style and format and user interface requirements in MIL-PRF-87268 or MIL-STD-40051-1 (Army only) or MIL-STD-3031 (Army only).

8. Paper manuals. If paper manuals are acquired, the data shall be clearly legible and on paper of sufficient quality for long term use.

CDRL 1423 A001_CalibrationCertificate_Synchro_Resolver
DI-QCIC-80798C_CalRpt
CDRL 1423 A002_Instrument_Calibration_Synchro_Resolver
DI-QCIC-81110_ICP
CDRL 1423 A003_SW_Version_Description_Synchro_Resolver
DI-IPSC-81442A_Software_version
CDRL 1423 A004_SWfirmwarechange_Synchro_Resolver
DI-MISC-81807_SWfirmwarechange
23. APPROVAL/DISAPPROVAL
Figure 1 Page 2 of 8 Pages
SOFTWARE CHANGE REQUEST (SCR), Figure 2
SCR NUMBER & REV:
SOFTWARE CHANGE REQUEST (SCR), Figure 3
SCR NUMBER & REV:
SCR NUMBER and REV:
SOFTWARE CHANGE REQUEST (SCR), Figure 6
SCR NUMBER and REV:
SCR NUMBER and REV:
CDRL 1423 A005_PartsList_Synchro_Resolver
DI-ILSS-80134A_PartsList
CDRL 1423 T001_TechMan_Synchro_Resolver
DI-TMSS-80527C_TechMan
A_CONTRACT_LINE_ITEM_NO: TBD
B_EXHIBIT: A
TDP:
TM:
OTHER: QCIC
DSYSTEMITEM: Synchro Resolvers
E_CONTRACTPR_NO: N64267-22-R-XXXX
FCONTRACTOR: TBD
1_DATA_ITEM_NO: A001
2_TITLE_OF_DATA_ITEM: CALIBRATION CERTIFICATION
3_SUBTITLE: Calibration Report with Data
4_AUTHORITY_Data_Acquisit: DI-QCIC-80798C (See Block 16)
5_CONTRACT_REFERENCE: SOW Paragraph: 5.1.2 (See Block 16)
6_REQUIRING_OFFICE: NAWCAD BL31400
7_DID_250_REQ: LT
8_APP_CODE: A
DIST_STATEMENT: A
10_FREQUENCY: ASGEN(See Block 16)
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: (See Block 16)
13_DATE_OF_SUBSEQUENT_SUB: N/A
addressee1: Patrick Brannick
draft1: 1
reg1: 1
repro1:
addressee2: NAWCAD BL31400
draft2:
reg2:
repro2:
addressee3: Cory Barnhouse
draft3: 1
reg3: 1
repro3: 0
addressee4: NAWCAD BL14200
draft4:
reg4:
repro4:
addressee5: Heather Loprano
draft5: 1
reg5: 1
repro5: 1
addressee6: NAWCAD BL31400
draft6:
reg6:
repro6:
addressee7: Copies with each unit delivered
draft7: 0
reg7: 1
repro7: 0
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 3
reg38t: 4
total_repro: 1
16_REMARKS: Block 4/5: DI-QCIC-80798C and SOW paragraph 5.1.2 shall be used as guidance and are provided for reference. Information items in DI-QCIC-80798C that are not relevant to the procured unit do not need to be included in format. Actual calibration data should be contained in the calibration report related to the certificate.

Block 8: Calibration Report (CDRL A001 subtitle) requires government approval. The contractor shall provide a preliminary draft of the Calibration Report of data to the Government for review, comment, and approval of the format no later than (NLT) 60 calendar days prior to initial operating capability (IOC) for each system. IOC shall be defined as the delivery date of the initial order of system(s). Government will provide the contractor with approval/disapproval of format including comments within 15 days of receipt of preliminary draft. Contractor shall provide a government approved final version with incorporated comments NLT 30 days prior to IOC for first system.

Block 10: Frequency of Calibration Report shall be generated for each system installed.

Block 12: Date of first submission shall be no later than (NLT) 60 calendar days prior to initial operating capability (IOC) of the first system procured.

Block 13: Date of subsequent submissions: N/A

Block 14: Submission in contractor format is acceptable. Electronic format is preferred if in a widely available commercial document format such as MS-Excel or MS Word. Electronic submission of data is also accepted on CD-ROM. Quantity and copies shall be provided in accordance with (IAW) CDRL distribution (Block 14). Addressee's POC information provided on CDRL supplemental page 2.

Block 16: This CDRL refers only to the format of the Calibration Report printed by the calibration standards, it is not intended that the contractor run actual US Navy workload for calibration.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY: Heather Loprano, BL31400
H_DATE: 02/25/2022
1_APPROVED_BY:
J_DATE:
Page: 1