Subcontracting Plan Checklist.doc

DOC document 79 KB Posted

Attached to
Repairs services for the CRC program Federal contract opportunity
Solicitation number
FA8250-21-R-0006
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document is an individual subcontracting plan checklist for a federal contract opportunity to provide repair services for the CRC program through the Department of the Air Force Materiel Command Air Force Sustainment Center. The subcontracting plan requires goals for total subcontracting dollars and percentages to small businesses, small disadvantaged businesses, women-owned small businesses, service-disabled veteran-owned small businesses, veteran-owned small businesses, and HUBZone small businesses. It outlines requirements for describing principal supplies and services to be subcontracted, methods for developing goals and locating potential suppliers, inclusion of indirect costs, and assurances around reporting, compliance records, good faith efforts, and prohibiting subcontractor payment discussions. Approval from levels above the contracting officer is needed if small disadvantaged business goals are below 5%. Information and coordination from the administrative contracting officer must also be obtained.

View the file

Other files for this federal contract opportunity

Other files attached to Repairs services for the CRC program, newest first.
File Type Posted
SQSR.pdf PDF
ITMDESC_REPORT.pdf PDF
FA825021R0006.pdf PDF
CAV_AF.pdf PDF
PKGRQMT_REPORT.pdf PDF
SOW.pdf PDF
UIIEC_REPORT.pdf PDF
PWS.pdf PDF
RDL_REPORT.pdf PDF
TRNSPDATA_REPORT.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Individual Subcontracting Plan Checklist and Review

Solicitation/Contract Number/Total Contract Value:

Date:

Contractor:

Buyer/PCO:

Office Symbol & Phone:

· If the contractor is participating in the Comprehensive Subcontracting Plan Test Program, individual plans are NOT required.

· The cumulative value of the basic contract and options is used to determine whether a subcontracting plan is required.

· Options require separate goals. See FAR 52.219-9(c) and 19.704(c).

· If there is a Master Subcontracting Plan in effect for this contractor, items 4 through 11 below do not apply. Note: Master plans are effective for three years after approval by the contracting officer, but contractors must maintain and update the plans as necessary. Changes must be approved by the contracting officer. See FAR 19.704(b).

· Is this a commercial plan? Yes No See Far 19.704(d).

The PCO/buyer will review the subcontracting plan and coordinate as required with the contractor and the cognizant contract administration office. After review, the PCO/buyer will complete/sign the checklist and provide the original checklist and a copy of the subcontracting plan to the local Air Force Small Business Office (SB). The SB will review the plan and obtain advice and recommendation from the SBA Procurement Center Representative (PCR). After review and coordination, the SB will notify the PCO/buyer of the results of the review before the start of negotiations.

Y=acceptable; U=not acceptable; N=not included; NI=needs improvement; N/A=does not apply

Does Plan Include:
PCO
SB
SBA
Reference

1.

Total Subcontracting Dollars:

(Insert proposed goals)

$
% Sub

Contract $ % Total Contract $

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

Total $ to SB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

Total $ to SDB

(includes 8a)

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

Total $ to WOSB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

$ to Service Disabled VOSB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

Total $ to Veteran OSB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

Total $ to HUBZone SB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

For current DOD goals, see http://business.defense.gov/About/Goals-and-Performance/

2.

Goals listed as a Percentage of Total subcontract value.

Goals listed as a Percentage of Total contract value.

-----
-----
-----
FAR 52.219-9(d)(1), 19.704(a)(1), 19.705

AFFARS 5319.704(a)(1)

3.

A description of the principal supplies/services to be subcontracted with sufficient detail to evaluate whether or not SB can do the work.

(Include large business, nonprofit, and not-for-profit work.)

FAR 52.219-9(d)(3), 19.704(a)(3), 19.705

4.

A description of the method used to develop goals.

FAR 52.219-9(d)(4), 19.704(a)(4), 19.705

5.

A description of the method used to locate potential suppliers.

FAR 52.219-9(d)(5), 19.704(a)(5), 19.705

6.

Do the goals include indirect costs?

FAR 52.219-9(d)(6), 19.704(a)(6), 19.705

If indirect costs are included in the goals, does the plan include a description of the cost allocation method?

FAR 52.219-9(d)(6), 19.704(a)(6), 19.705

7.

Name and duties of contractor’s subcontracting plan administrator.

FAR 52.219-9(d)(7), 19.704(a)(7), 19.705

8.

Description of the efforts the offeror will make to assure that SBs have an equitable opportunity to compete for subcontracts.

FAR 52.219-9(d)(8), 19.704(a)(8), 19.705

9.

Flow Down assurances.

FAR 52.219-9(d)(9), 19.704(a)(9), 19.705

Appropriate subcontract clauses will be used.

FAR 52.219-9(d)(9), 19.704(a)(9), 19.705

Subcontractors will be required to submit a similar plan.

FAR 52.219-9(d)(9), 19.704(a)(9), 19.705

Does Plan Include:
PCO
SB
SBA
Reference

10.

Assurance prime contractor will submit required reports and cooperate in studies and surveys.

FAR 52.219-9(d)(10), 19.704(a)(10), 19.705

11. Recitation of types of records maintained to show compliance with plan.

FAR 52.219-9(d)(11), 19.704(a)(11), 19.705

12. Assurance that offeror will make good faith effort to acquire articles, equipment, supplies, services, materials, performance, from the small business concerns that the offeror used in preparing the bid or proposal, in the same scope as used in preparing and submitting the bid or proposal.

FAR 52.219-9(d)(12), 19.704(a)(12), 19.705

13. Assurances that contractor will provide contracting officer a written explanation if the contractor fails to acquire articles, equipment, supplies, services, materials, performance, as described above. Written explanation to be submitted to contracting officer within 30 days of contract completion.

FAR 52.219-9(d)(13), 19.704(a)(13)

14. Assurances that contractor will not prohibit a subcontractor from discussing with the contracting officer, matters pertaining to payment to or utilization of a subcontractor.

FAR 52.219-9(d)(14), 19.704(a)(14)

15. Assurances that offeror will pay its small business subcontractors on time and IAW terms and conditions of the subcontract, and notify contracting officer of offeror pays a reduced on an untimely payment to a small business subcontractor.

FAR 52.219-9(d)(15), 19.704(a)(15), 52.242-5, 19.705

16. If the SDB goal for the basic contract is less than 5%, is approval one level above contracting officer attached?

DFARS 219.705-4

17. For modifications, is approval attached if the SDB goal is less than 5%? (If SDB goal was below 5% for the basic contract and the reasons have not changed, a new approval is not required)

DFARS 219.705-4

18. Has information and coordination from the ACO been obtained?

FAR 19.706, DFARS 219.706(a)(i)

Buyer/PCO Comments:

Buyer/PCO Signature and Date:

SB Comments:

Air Force Small Business Office Signature and Date:

SBA PCR Comments:

If box is checked, SBA does not have a copy of the current Master Subcontracting Plan on File. Please provide one.

SBA Procurement Center Representative Signature and Date:

SBA will internally report this subcontracting plan, as submitted, as acceptable not acceptable modified on _____________ to be acceptable before award.

SBA may contact the PCO/buyer regarding status of the subcontracting plan at time of award.

Please remember the post-award responsibilities of the Contracting Officer, which are listed in FAR 19.705-6.

The Procurement Center Representative can provide the addresses of the appropriate Area Directors.

(Ver. 09/29/2017)