PWS.pdf
PDF 309 KB Posted
- Attached to
- Repairs services for the CRC program Federal contract opportunity
- Solicitation number
- FA8250-21-R-0006
About this file
This performance work statement outlines repair services requirements for an Exciter, Radio Frequency part numbered 5840-01-538-6564. The contractor shall disassemble, inspect, repair, replace components as needed, reassemble, test, and return the item to a serviceable condition. The contractor must meet all performance requirements equivalent to a new item. The contractor shall identify any proposed design changes and submit engineering change proposals for approval. Any failed items must be repaired or replaced at no cost if the failure is due to workmanship or parts quality within one year of repair. The contractor shall report production status, asset management data, and condemnations using the Contracted Aviation Visibility and Accountability Facility system. The contractor must also submit a repaired item inspection report, counterfeit prevention plan, test procedures and reports, and contractor manpower reporting.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| UIIEC_REPORT.pdf | ||
| Subcontracting Plan Checklist.doc | DOC document | |
| RDL_REPORT.pdf | ||
| TRNSPDATA_REPORT.pdf | ||
| CAV_AF.pdf | ||
| PKGRQMT_REPORT.pdf | ||
| SOW.pdf | ||
| SQSR.pdf | ||
| ITMDESC_REPORT.pdf | ||
| FA825021R0006.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8 Jul 2021 PWS 5840-01-538-6564 1/10
DEPARTMENT OF THE AIR FORCE
OGDEN AIR LOGISTICS CENTER, HILL AFB, UTAH 84056-5820
PERFORMANCE WORK SPECIFICATION (PWS)
PR NO: FD2020-21-00986 DATE: 8 July 2021
1.0 SCOPE OF WORK: (FFP) For the following end item(s), the contractor shall furnish all facilities, parts, materials, data, equipment and services, required to dissemble, (the process of breaking down item(s) into component parts that will be reworked, refurbished, altered, and/or replaced), inspect, repair and/or replace (including all obsolete components) as necessary
(providing manufacturing processes that are similar to the original manufacturing process to totally rebuild items), reassemble according the most recent revision (utilizing new part number(s) and new data plates as necessary), align and functionally test each item(s), returning the item(s) to a serviceable condition. Services to be performed will not be essential in a crisis situation.
Below listed item(s) will be shipped to contractor to repair:
Item Description NSN Part Number
Exciter, Radio Frequency 5840-01-538-6564 310377
This PWS establishes the minimum work requirements to return the end item(s) to a serviceable but like new condition.
ESD: YES
2.0 WORK PERFORMANCE REQUIREMENTS:
2.1 TECHNICAL OR PERFORMANCE REQUIREMENTS: Unit will meet all performance requirements of a new item. All repaired/retrofitted items will be configured and perform IAW the latest requirements of the Specification Control Drawing and Acceptance Test Plan listed in the Repair Data List (RDL) or IAW developed test plans approved by the Government.
2.2 SUBCOMPONENT CHANGE OR REDESIGN: The contractor will identify any proposed/necessary changes to subcomponents, values, part/manufacture substitutions or redesign of subsystems to the 415 SCMS ESA. Proposed internal changes to this item will require the contractor to submit an ECP to the 415 SCMS for review and approval by the designated engineering authority. Submission of ECP(s) does not imply approval. The ECP shall be accompanied with complete technical documentation, unlimited data rights and shall be submitted to the government for approval. Contract Data Requirements List D001 DI-SESS-
80639E.
2.3 FOREIGN DISCLOSURE RESTRICTIONS: This item contains critical technology and is export controlled. Distribution authorized to DoD and U.S. DoD Contractors only (Critical
Technology).
2.4 TEST REQUIREMENTS: The Contractor shall perform an acceptance test and checkout of each completed end-item to assure serviceability and full functionality prior to presentation to the Government. This testing will be performed IAW existing approved test plan or IAW developed test plans approved by the Government.
8 Jul 2021 PWS 5840-01-538-6564 2/10
2.5 QUALITY DEFICIENCY REPORTING: Any asset that fails to function within one year after date of repair, and the Government suspects failure is due to quality of workmanship, level of overhaul, or quality of replacement parts used by the contracted repair source, the asset shall be returned to the repair source for correction. This repair shall be accomplished at no additional cost to the government if deemed by 415 SCMS to be the fault of the contractor and will be delivered back to the government under the terms of the original contract. The contractor may dispute Air Force determination of responsibility through the ACO to the PCO with DCMA providing evidence that the failure was not the fault of the contractor. This measure will be accomplished by customer reported deficiencies in the form of product quality deficiency or material deficiency reports according to T.O. 00-35D-54 titled USAF Deficiency Reporting
Investigation and Resolution.
3.0 PACKAGING, HANDLING, SECURITY AND TRANSPORTATION:
3.1 RECEIVING INSPECTION: Contractor shall notify the ACO/PCO along with the Quality
Assurance Representative (QAR) of all damages and shortages, or discrepancies (i.e. items not packaged in accordance with applicable Special Packaging Instructions (SPI)) discovered upon receipt of any item(s). All issues must be reported back to the originating organization for disposition. If items are damaged in transit or assets are found to be misidentified during the inspection process, the ACO/PCO will request disposition instruction from the 415 SCMS. The
415 SCMS will verify if additional assets are available to resubmit to the contractor. If no assets are available, ACO/PCO will address the required changes. The ACO or QAR shall initiate a
Supply Discrepancy Report (SDR). Access to WebSDR can be found at https://www.daas.dla.mil/sar/warning.asp.
3.2 SECURITY REQUIREMENTS: N/A
3.3 REUSABLE CONTAINERS: Contractor shall handle and store reusable containers and materials used for packing and packaging in a manner, which shall assure that they are retained in a serviceable condition for reuse. If the contractor questions the serviceability/condition of the reusable containers, notify the ACO for repair/replacement instructions.
3.4 HANDLING: All items shall be handled and packaged in accordance with applicable Special
Packaging Instructions (SPI).
3.4.1 Care shall be exercised to prevent damage to Government Furnished
Property/Equipment while in the contractor’s possession.
3.4.2 All Government Furnished Property shall be stored in a secure area to provide protection against damage, pilferage, or loss. Storage areas shall provide protection against all adverse environmental conditions.
3.5 SHIPPING DOCUMENT REQUIREMENT: The Contractor is required to comply with all
CAVAF requirements identified in the CDRLs (para 8.1) and attachments to the contract. Additionally, upon completion of the repair, the contractor is required to print the DD1348-1 (in triplicate) from CAVAF. NOTE: The DD Form 1348 must be printed when prompted in CAV AF. The DD Form 1348 cannot be printed after that point. One copy is to be placed inside the box with the returnable repair asset, one outside the box and one copy will be electronically uploaded to WAWF as part of the Receiving Report
8 Jul 2021 PWS 5840-01-538-6564 3/10
(DD250). Under no circumstances shall a DD Form 250 or DD Form 1149 ever be sent with a shipment and/or used as a shipping document.
If CAV AF reporting is not fully completed or used by the contractor for any reason, a manual DD Form 1348 shall be prepared and shall be annotated with the following statement: “Contract Repair; Receiving activities process as D6M receipt, __
Condition Stock.” (Enter appropriate condition code). When a manual DD Form
1348 is used, a copy must be sent to the Procuring Contracting Officer (PCO) with a statement indicating that the DD Form 1348 is to be sent to the CAV AF POC for the contract.
4.0 CONDEMNATION: It shall be considered uneconomical to accomplish repair on an end item when the total cost for parts, material, and labor exceeds 75 percent of the stock list price of a new item. Parts obsolescence may also be a condition for BER. Authorization to accomplish repair, condemnation, or disposition shall be obtained through the ACO/PCO from the 415 SCMS for end items determined to be uneconomical to return to a serviceable condition. If BER is approved the contract delivery schedule will be adjusted accordingly to relieve contractor delivery schedule on item.
5.0 GENERAL:
5.1 RELIABILITY AND MAINTAINABILITY (R&M): Additional R&M is not required;
however, existing R&M performance shall not be degraded during this work effort.
5.2 ENVIRONMENTAL IMPACT (EI) REQUIREMENTS: N/A
5.3 ROUTINE, MISSION IMPAIRED CAPABILITY AWAITING PARTS (MICAP), SURGE,
and ESSENTIAL DoD CONTRACTOR SERVICES: The Contractor shall be responsible for returning serviceable assets in the time set forth in this contract. In the event that the
Government requires an asset for coverage of a MICAP requirement, the Contractor agrees to enter into negotiations with the Government to expedite delivery of the needed asset(s).
5.4 ELECTROSTATIC DISCHARGE CONTROL: The contractor shall implement or maintain an
Electrostatic Discharge (ESD) control program in accordance with MIL-PRF-87893, MIL-STD-
1686, paragraphs 5.1, 5.4, 5.5, 5.6, 5.7, 5.8.2, 5.10, 5.11, 5.12, and 5.13 and with T.O. 00-25-
234, Section VII for all electronics ESD sensitive end items/components.
5.5 DISPOSITION: Repaired parts shall be shipped to the destination specified in the contract.
Disposition of any misidentified items shall be as stated in paragraph 3.1. Delivery shall be according to the delivery schedule in the contract. Early and partial shipments are acceptable.
5.6 TRIAGE CONCEPT IS AUTHORIZED: Cross utilization of components are authorized following coordination with DCMA COR.
5.7 SAFETY AND HEALTH: While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the Contracting Officer (CO), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two
8 Jul 2021 PWS 5840-01-538-6564 4/10 workdays, for any damage to government property less than $500,000.00 during the execution of the contract.
Mishap notifications shall contain, as a minimum, the following information:
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (Events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
If requested by the designated CO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.
6.0 SPECIFIC WORK REQUIREMENTS:
6.1 DISASSEMBLY: The Contractor shall disassemble each item only to the extent necessary to accomplish inspection, testing, fault isolation, and maintenance.
6.2 CLEANING: The end item shall be cleaned thoroughly prior to and after disassembly and maintain cleanliness during this maintenance effort. IAW MIL-HDBK-454 and
T.O. 1-1-1.
6.3 CORROSION CONTROL AND TREATMENT: Accomplish corrosion control and treatment as required, using methods and materials IAW MIL-STD-1568, section 4 and
T.O. 1-1-2 as applicable, and specification drawings.
6.4 MAINTENANCE: The contractor shall perform the required maintenance, inspection, reassembly of the reworked end item and components and calibration, if applicable, IAW T.O. 00-25-234.
6.4.1 The contractor shall perform an acceptance test and checkout of each completed end item to assure serviceability prior to presentation to the government.
6.4.2 The contractor shall provide a Test Procedure for the Radio Frequency Amplifier no later than 15 days before final testing IAW applicable Contract Data
Requirements List (CDRL) (E001) (DI- NDTI-80603A). In addition, the contractor shall provide a Test Report for each completed end-item IAW applicable Contract Data Requirements List (CDRL) (F001) (DI-NDTI-80809).
6.4.3 Upon satisfactory completion of final test, the contractor shall cover and seal all ports, vents and electrical connection/plugs with suitable caps to prevent entry of foreign matter or damage during handling and shipment. Cap or seal all open flexible or rigid lines, hoses, and fittings at all times when not in use.
8 Jul 2021 PWS 5840-01-538-6564 5/10
6.5 MARKING:
6.5.1 Preservation of Markings: The Contractor shall ensure nameplates and product markings are correct and accurate upon repair completion. The Contractor shall replace damaged markings, identification, and decals IAW drawings or equivalent best commercial practice. The assemblies, subassemblies, and parts that constitute this repair shall be marked for identification in accordance with existing style and format.
6.5.2 If not already marked, Item Unique Item Identifier (IUID) marking shall be accomplished according to MIL-STD-130 and MIL-STD-129 latest versions and per DFARS Clause 252.211.7003. All marking shall be placed in accordance with the technical data for the part.
6.5.2.1 Specification requirements for IUID marking will be contained in the applicable Air Force/OEM Technical Order, Specific Work Requirements appendix, approved engineering drawing, or a Government provided
Engineering order as applicable. The government will provide IUID marking specifications.
6.5.2.2 In the event the government cannot provide or it is not feasible for the contractor to provide IUID marking specifications a determination and findings will be accomplished IAW DFARS 211.274-2 Policy for unique item identification.
6.5.2.3 IUID markings currently in place on items undergoing repair shall be protected from damage or removal during repair. Ensure 2-D matrix IUID markings are readable per TO 00-25-260. Should IUID marking be rendered unreadable during repair, the contractor shall notify the PCO/ACO for determination.
6.5.2.4 Prior to government acceptance, the contractor shall submit the required and applicable contingent data to the IUID Registry per the data submission procedures at http://www.acq.osd.mil/dpap/pdi/uid/data_submission_information.html.
DCMA has IUID inspection responsibility.
6.5.2.5 Enter logistical data into database
6.6 REFINISHING: Refinish only to the extent necessary to assure adequate protection of all surfaces IAW Technical Data.
6.7 COUNTERFEIT PREVENTION PLAN (CPP): Contractors that supply electronic parts or systems that contain electronic parts shall establish policies and procedures to avoid, detect, mitigate and dispose of counterfeit electronic parts to prevent such parts from entering the USAF/DoD supply chain. These policies and procedures shall be
8 Jul 2021 PWS 5840-01-538-6564 6/10 documented in a CPP for submission and approval in accordance with CDRL C001 (DI-
MISC-81832) and accomplished for all specified contract items. DI-MISC-81832 is applicable to Parts, Material and Processes Selection (PMPS) associated with delivery of systems and assemblies to the USAF and DoD. The requirements established by DI-
MISC-81832 also apply to electronics components procured in sustainment of such systems and assemblies. The requirements of the recently DoD-adopted SAE 5553, Aerospace Standard, Counterfeit Electronics Parts; Avoidance, Detection, Mitigation, and Disposition shall also apply.
6.7.1 At a minimum, the CPP shall address:
6.7.1.1 Applicability. The Contractor shall identify all Business locations and programs to which the CPP applies. The CPP shall address materials, hardware, electronic parts, and procured assemblies.
6.7.1.2 Definitions. The Contractor shall utilize definitions per AS 5553 to ensure consistency. Any contractor-derived definitions must be included in an appropriate CPP appendix or annex. (Ref. AS5553, Section 3)
6.7.1.3 Parts Availability and Use of Parts Brokers. The Contractor shall not procure materials, systems, assemblies, subassemblies or parts from parts
Brokers when available from Original Manufacturers (OM) or their
Authorized Distributors. In cases where materials, systems, assemblies, subassemblies or parts are no longer available from the OM or their
Authorized Distributors, procurement from Brokers may be authorized as defined by the Contractor’s policy and their CPP. (Ref. AS5553, Section
3.1)
6.7.1.4 Procurement Policies. The Contractor shall provide and implement policy directing development and implementation of business practices and procedures, and processes to prevent procurement of Counterfeit materials and parts. The Contractor shall identify the appropriate office(s), business units, functional organizations, and programs, who shall have responsibility for development, maintenance and implementation of the CPP. The CPP shall identify the specific roles and responsibility for each. (Ref. AS5553, Section 3.1.3, 3.1.4)
6.7.1.5 Risk Assessment. The contract shall address the risk of using unknown sources and or unauthorized suppliers in the CPP. Application or technical risk assessments shall establish the effect that counterfeit parts may have on performance. Vendor or source of supply risk assessments shall establish the potential for obtaining counterfeit parts. Using any risk analysis tool acceptable to the Government, the Contractor shall conduct a risk assessment based upon item characteristics and how likely it is that a counterfeit part will be received. The contractor shall identify and describe in the CPP how parts are selected for assessment and what risk is acceptable
8 Jul 2021 PWS 5840-01-538-6564 7/10 based upon the parts design, construction, material and functional requirements. As a minimum, analysis shall be completed for flagging high risk items, such as items that are obsolete, discontinued, rare, etc. The contractor shall require completion of a trade study, documented within the
CPP, that shall facilitate determining whether 100% testing of parts procured from after-market sources is more cost effective than qualification or requalification of a manufacturer. (Ref. AS5553, Section 3)
6.7.1.6 Detection and Avoidance Responsibilities. The Contractor shall establish processes for the review and approval of contractor and applicable subcontractor systems for the detection and avoidance of counterfeit electronic parts and suspect counterfeit electronic parts, which processes shall be comparable to the processes established for contractor business systems under section 893 of the Ike Skelton National Defense
Authorization Act for Fiscal Year 2011 (Public Law 111–383; 124 Stat.
4311; 10 U.S.C. 2302 note). The Contractor shall flow down such requirements and processes to their subcontractors per ODASD Memo titled
“Overarching DoD Counterfeit Prevention Guidance”, dated 16 March
2012. (Ref. AS5553, Section 3)
6.7.1.7 Testing and Verification. The Contractor shall establish and accomplish testing and verification processes for items not received from an original equipment manufacturer, original component manufacturer, or authorized distributor that are identified as having high risk for counterfeit potential.
These processes apply to prime contracts, and to subcontracts or suppliers below the prime contracts. The Contractor shall provide a list of acceptable test facilities if the subcontractor or supplier does not have the capability to perform required testing. Submittal of Certificates of Compliance indicating the parts are not counterfeit shall be acceptable for verification of testing. (Ref. AS5553, Section 3.1.5)
6.7.1.8 Configuration Identification and Traceability. The Contractor shall identify and control the configurations of all systems, assemblies, subassemblies and parts, and enable mechanisms to provide traceability of parts. The
Contractor shall report to the Government when control of the configurations of all systems, assemblies, subassemblies and parts, and mechanisms to provide traceability of parts are not possible. The
Contractor shall identify the specific systems, assemblies, subassemblies and parts beyond the Contractors’ control. The Contractor shall be responsible for detecting and avoiding the use or inclusion of counterfeit materials and parts, to include procured assemblies and subassemblies, in such products and shall be responsible for the rework or corrective action that may be required to resolve the use or inclusion of counterfeit materials and parts. The cost of counterfeit electronic parts and suspect counterfeit electronic parts and the cost of rework or corrective action that may be required to remedy the use or inclusion of such parts are not allowable costs
8 Jul 2021 PWS 5840-01-538-6564 8/10 under Department contracts , unless: a) the contractor has established a counterfeit avoidance/detection system approved by the DoD, b) the counterfeit parts were procured from a DoD-accredited trusted supplier or provided as government property, and c) the contractor has provide timely notification to the government. (Ref. AS5553, Section 3.1.7)
6.7.1.9 Counterfeit Notification and Reporting. The Contractor shall report in writing to the Procuring Activity within 30 days of determining any end item, component, part, or material contained in supplies purchased by the
Department of Defense, or purchased by a contractor or subcontractor for delivery to, or on behalf of, the Department, contains counterfeit electronic parts or suspect counterfeit electronic parts for the purpose of investigation and notification of the Air Force Office of Special Investigations (AFOSI).
The Procuring Contracting Officer (PCO) shall coordinate reporting to the appropriate Program Management/Item Management, System Engineering
Management, the AFMC Discrepant Materiel Reporting Program (DMRP)
Office in 406 SCMS/GULAB, and the AFOSI. Additionally, the Contractor shall within the same 30 day period ensure all suspected or confirmed counterfeit items are entered into the Government-Industry Data Exchange
Program (GIDEP) system, which will serve as the DoD central reporting repository. (Ref. AS5553, Section 3.1.8)
6.7.1.10 Counterfeit Prevention Training. The Contractor shall provide appropriate training and shall require all personnel working procurement within their company, to include at a minimum their supply chain management specialists, receiving inspectors, and engineers, to complete said training.
The Contractor shall determine the appropriate training required. Training may be developed in-house or may be other Industry accepted training. The
CPP shall describe and list the training provided by the contractor to their personnel. (Ref. AS5553, Section 3.1.1)
7.0 DISCREPANCIES: In case of conflict between this document and any referenced document, contact ACO & PCO for resolution of discrepancy.
8.0 DATA DELIVERABLES:
8.1 CAV AF: Contractor shall provide the status of maintenance production, asset management, and condemnations IAW Contract Data Requirements List (CDRL)
Exhibit A001 (DI-MGMT-81838/T), A002 (DI-PSSS-81995/T), A003 (DI-
MGMT-80441 C/T) and all requirements of this PWS. Contractor shall be ready to report in CAVAF before receipt of assets. Contractor shall complete on time all required CAVAF production/repair data reporting as required in paragraph 3.5 of this PWS.
8 Jul 2021 PWS 5840-01-538-6564 9/10
8.2 REPAIRED ITEM INSPECTION REPORT: All item failures and component consumption data shall be documented and reported to OO-ALC 415 SCMS IAW with the Repairable Item Inspection Report, CDRL B001 (DI-PSSS-80386A).
8.3 COUNTERFEIT PREVENTION PLAN: The contractor shall provide a
Counterfeit Prevention Plan (CPP) per CDRL C001 (DI-MISC-81832), including the identified items of SAE AS5553 per section 6.7.
8.4 ENGINEERING CHANGE PROPOSAL: The contractor shall provide an
Engineering Change Proposal (ECP) for any proposed subcomponent substitutions per CDRL Exhibit D001 (DI- SESS-80639E) (see paragraph 2.2).
8.5 TEST PROCEDURE: The contractor shall provide a Test Procedure for the Radio
Frequency Exciter per CDRL Exhibit E001 (DI-NDTI-80603A) (see paragraph
6.4.2).
8.6 TEST REPORT: The contractor shall provide a Test Report for each repair attempt per CDRL Exhibit F001 (DI-NDTI-80809B) (see paragraph 6.4.2).
8.7 CONTRACTOR MANPOWER REPORTING: The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Radio Frequency
Exciter via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil. Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31
October of each calendar year. Contractors may direct questions to the CMRA help desk.
8.7.1 Reporting Period: Contractors are required to input data by 31 October of each year.
8.7.2 Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
8.7.3 User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.
http://www.ecmra.mil/ http://www.ecmra.mil/
8 Jul 2021 PWS 5840-01-538-6564 10/10
9.0 SERVICE DELIVERY SUMMARY (SDS):
Performance Objective PWS Para Performance Threshold Surveillance
Reporting in Commercial
Asset Visibility Air Force
(CAVAF)
DD250/Material/Inspection
Reporting and Receiving reports.
3.5, 8.1 Condition Code changes
Must be noted no later than
24 Hrs. after change has taken place. 100% (or as detailed in) DCMA risk
Management Plan Accuracy rate for material handling and reporting in DD250 or
CAVAF.
PCO/CAV AF POC
Item failures and component consumption data shall be documented and reported
8.2
Reporting shall take place no later than 7 days after repair.
415 SCMS
Counterfeit Prevention Plan 6.7, 8.3 Reporting shall take place no later than 30 days after contract award.
415 SCMS
PREPARED BY: William E Powell 448 SCMW/415 SCMS
File details come from the government source that posted it. Updated .