Statement of Work TKIDS.docx

DOCX document 52 KB Posted

Attached to
Dilution Refrigerator for TKIDs work Federal contract opportunity
Solicitation number
1333ND24QNB680256
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This document is a Statement of Work for a solicitation to acquire a dilution refrigerator system for the National Institute of Standards and Technology (NIST) Neutron Physics Group.

The key requirements include: a cryogen-free dilution refrigerator system with a sample volume of at least 145mm diameter by 165mm height, capable of reaching a base temperature of 35mK or lower and providing at least 200 microwatts of cooling power at 100mK; the system must include temperature controllers, gas handling, and automated cool-down and warm-up procedures, as well as multiple RF/microwave coaxial lines and twisted-pair wiring. The contractor must deliver the system within 8 months of contract award, provide installation and training, and offer a minimum 1-year warranty. Payment will be made in four installments based on completion of key milestones. The solicitation number is 1333ND24QNB680256, with responses due by the date specified in the related federal contract opportunity document.

View the file

Other files for this federal contract opportunity

Other files attached to Dilution Refrigerator for TKIDs work, newest first.
File Type Posted
1333ND24QNB030255 RFQ.docx DOCX document
Amendment 0001-Questions and Answers.docx DOCX document
1333ND24QNB030255 RFQ.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK/REQUIREMENTS DOCUMENT

Title: Dilution Refrigerator for TKIDs work Requesting Lab: PML 682.03

I. BACKGROUND INFORMATION

Purpose/Objective: The Neutron Physics Group (NPG) at NIST is working with the NIST Quantum Sensors Division to develop cryogenic Thermal Kinetic Inductance Detectors (TKIDs) for external charged particle detection, with the goal of installing these detectors on a cold neutron beamline at the NIST Center for Neutron Research (NCNR) for neutron physics experiments. This work requires the NPG to acquire a dry dilution refrigerator for initial prototyping and testing of TKIDs with small radioactive sources. This same dilution refrigerator will later be moved to a neutron beamline for a demonstration experiment.

II. SCOPE

The Contractor shall deliver a quantity of one (1) dilution refrigerator system that meets all requirements listed below, inclusive of FOB Destination delivery, installation, warranty and training, and option line items.

III. MINIMUM REQUIREMENTS

The Contractor shall provide a system that meets all technical specifications identified below. All items must be new. Used or remanufactured equipment will not be considered for award. Experimental, prototype, or custom items will not be considered. The use of “gray market” components are not authorized for sale in the U.S. by the Contractor is not acceptable. All line items shall be shipped in the original manufacturer’s packaging and include all original documentation and software, when applicable.

Line Item 0001:

Description: He-3 dilution refrigerator system Quantity: 1 A. Technical Specifications

a. Physical

i. The main dilution refrigerator system including the cryostat, support frame, and gas handling system shall fit within a volume smaller than 5000 mm long by 3200 mm wide by 3100 mm high.

ii. Maximum total height of support frame shall not exceed 2600 mm

iii. The pulse tube compressor shall be able to be remotely located in an adjacent room at a minimum distance of 20 m. The Government shall provide necessary wall penetrations for this location.

iv. The cryostat shall have a sample volume that exceeds 145 mm diameter by 165 mm tall.

v. The cryostat sample volume shall be centered at 47” = 1194 mm above the floor.

vi. The dilution refrigerator system shall be of the cryogen-free type that does not utilize liquid helium. A liquid nitrogen trap for maintaining helium purity is acceptable (and preferred).

vii. The cryostat vacuum jacket and radiation shields shall each consist of two pieces, with the joint located near or at the 4 K plate.

viii. The cryostat vacuum jacket and radiation shields shall be able to be installed or removed by one person. This can be achieved either through lightweight jacket and shields or with a provided counterweight or hoist system.

b. Optical access

i. Shall have a minimum two ports for optical access.

ii. Window diameters shall be 30 mm.

iii. Blanks will be provided for all optical ports (no windows).

iv. The two ports shall be located with their center axis at 47” = 1194 mm above the ground (at the center of the cryostat sample volume).

v. The two ports shall be located horizontally through the fridge and diametrically opposed, i.e., one on either side of the fridge, for future installation on a neutron beam line. Additional ports at other locations, if part of a standard configuration, are acceptable.

c. Helium

i. The required quantity of Helium-4 gas shall be provided by the contractor.

ii. The government will provide the required quantity of Helium-3 gas.

d. Cryogenic Performance

i. The dilution refrigerator shall be able to achieve a base temperature of 35 mK or lower. Stronger consideration will be given to lower base temperature, down to a minimum of 10 mK.

ii. The dilution refrigerator shall have a cooling power which exceeds 200 micro-Watts at a temperature of 100 mK. Stronger consideration will be given to higher cooling power.

iii. The duration required to cool to base temperature shall not exceed 24 hours. Stronger consideration shall be given to shorter cool down times.

iv. The duration required to warm the system up to room temperature shall not exceed 24 hours. This requirement can be achieved through intrinsic properties or with the assistance of a controlled heater system. Stronger consideration shall be given to shorter warm up times.

e. Temperature Controller and Thermometry

i. A multi-channel resistive temperature controller shall be provided.

ii. The number of temperature controller channels shall be sufficient to measure the temperature at all physical stages of the cryostat plus a minimum of 3 additional channels for user applications.

iii. Suitable resistive thermometers shall be provided for each stage.

iv. The temperature controller shall have the ability to apply power in manual mode.

v. The temperature controller shall have the ability to apply power in closed loop PID mode.

vi. The temperature controller shall allow external computer control.

f. Gas Handling System

i. A gas handling system shall be provided.

ii. The gas handling system shall control the condensation and circulation of helium-3.

iii. The gas handling system shall be able to be operated manually or by computer control.

iv. The gas handling system shall include the capability to evacuate the vacuum jacket of the cryostat to a level sufficient for cooldown. The vacuum jacket shall also be able to be backfilled for warm-up.

g. Automation

i. The dilution refrigerator system shall have the ability to be controlled with either vendor supplied, or user-defined automated procedures.

ii. Automated procedures for cool-down and warm-up shall be provided.

h. Coaxial Wiring

i. A minimum of six RF/microwave coaxial lines shall be provided.

ii. The coaxial cables shall be of the semi-rigid type, with the following specifications:

1. Between room temperature and the 4 K stage:

a. All lines (6 minimum) shall be:

i. 2.19 mm (UT85) diameter

ii. Silver plated CuNi-CuNi

2. Between the 4 K stage and the mixing chamber:

a. Three lines (minimum) shall be:

i. 2.19 mm (UT85) diameter

ii. Silver plated CuNi-CuNi

b. Three lines (minimum) shall be:

i. 2.19 mm (UT85) diameter

ii. NbTi-NbTi

iii. The coaxial cables shall be installed in such a way as to allow for user installed amplifiers/electronics at the 4 K stage.

iv. The coaxial cables shall be heat-sunk at appropriate stages.

v. The coaxial cables shall have SMA connectors throughout

vi. Hermetic feedthrough SMA connectors shall be used at room temperature.

i. Twisted Pair Wiring

i. A quantity of 36 twisted pairs (72 total wires) shall be supplied for DC signals.

ii. The twisted pairs shall be installed as follows:

1. One set of 12 twisted pairs (24 wires) shall be installed from room temperature to the 4 K plate.

2. Two sets of 12 twisted pairs (48 total wires) shall be installed from room temperature to the mixing chamber.

iii. Wiring shall be phosphor bronze size 36 AWG.

iv. Wires shall be heat sunk at appropriate stages to minimize heat loading.

v. Hermetic feedthrough connectors shall be used at room temperature.

vi. Wiring shall be connectorized at the 4 K plate or the mixing chamber, respectively.

1. The contractor shall provide mating connectors.

j. Available Port(s)

i. In addition to ports used for above wiring and other uses, there shall be at a minimum one available port for future user applications. Stronger consideration will be given to additional available ports beyond one.

ii. The available port(s) shall be KF-40/equivalent or larger.

k. Vibration Isolation

i. The standard configuration for the system support frame and pulse tube motor isolation is acceptable.

ii. Stronger consideration will be given to systems that reduce the typical summed (x+y+z) RMS vibration levels to less than 60 micrometers. This can be achieved either with the standard configuration or with additional vibration isolation options.

IV. DELIVERABLES

Description
Quantity or Format
Due Date
Installation Manual, Utility Requirements, and general diagram showing total footprint, basic dimensions, and wall penetrations, as well as general diagram of optical ports with dimensions.
Electronic (PDF, .doc, .docx, etc.)
Along with Bid
Detailed drawings showing room layout including total footprint and dimensions, length of compressor lines, and wall penetrations for approval.
Electronic (PDF, .doc, .docx, etc.)
4 weeks after order confirmation
Detailed drawings of the dilution refrigerator including sample volume dimensions and location as well as location and dimensions of optical access ports for approval.
Electronic (PDF, .doc, .docx, etc.)
4 weeks after order confirmation
Helium-3 dilution refrigerator system.
Quantity 1
Delivery NLT 8 months ARO.

Standards of Acceptance: The NIST TPOC or COR shall complete acceptance in accordance with section X below within 5 business days of receipt of deliverable.

V. PLACE OF PERFORMANCE

The place of performance shall be The National Institute of Standards and Technology, 100 Bureau Drive, Building 245, Gaithersburg, MD 20899

VI. PERIOD OF PERFORMANCE/LEAD TIME

a. Along with the bid, the Contractor shall supply:

i. evidence of supplying similar He-3 dilution refrigerator systems

ii. the installation manual including utility requirements

iii. a general diagram showing the total footprint of the system including basic dimensions

iv. a general diagram of the optical ports including dimensions

v. an estimate for the delivery lead time

b. Within 4 weeks of award of contract, the contractor shall deliver detailed drawings of the room layout, including compressor lines and wall penetrations, and dilution refrigerator cryostat, including sample volume size and position, and optical access port dimensions and position for approval by the TPOC.

c. The contractor shall provide the Government with an updated delivery estimate 4 weeks ARO.

d. The contractor shall deliver the system within 8 months of award of contract.

e. The time period for delivery will be agreed upon by the Government and Contractor.

f. The government will provide a time window for installation that will not begin earlier than 1 week after the delivery date and spanning at least 4 weeks.

g. The time period for installation will be agreed upon by the Government and contractors.

h. No later than 2 weeks before delivery, the Contractor shall:

i. supply a final delivery date

ii. confirm installation date

i. The contractor shall provide a minimum 1-year warranty after acceptance. The contractor may offer multiple warranty options to choose from.

VII. DELIVERY TERMS

Delivery shall be F.O.B Destination and shall occur in accordance with the delivery due dates provided in the above table.

FOB Destination means: The contractor shall pack and mark the shipment in conformance with carrier requirements, deliver the shipment in good order and condition to the point of delivery specified in the purchase order, be responsible for any loss of and/or damage to the goods occurring before receipt and acceptance of the shipment by the consignee at the delivery point specified in the purchase order; and pay all charges to the specified point of delivery. The contractor shall deliver all Line Items to:

National Institute of Standards and Technology Shipping and Receiving 100 Bureau Drive, Building 301 Gaithersburg, MD 20899 C/O Shannon Hoogerheide, Building 245

VIII. INSTALLATION

The system shall be installed by the Contractor no later than 5 weeks after delivery, at a mutually agreed upon time. Installation, at a minimum, shall include uncrating/unpackaging of all equipment, rigging, set-up and hook-up of the system, basic demonstration of features, and removal of trash. Onsite installation and demonstration shall be done at NIST, Gaithersburg, MD- Building 245. All installation requirements are identified below: Comment by Collie, Donald E. (Fed): Do we have a COR assigned? Comment by Retterer, Tracy M. (Fed): Yes

1. Site Preparation

a. The contractor shall provide specifications for required utilities prior to installation. NIST will prepare the space and necessary utilities with appropriate connectors.

IX. TRAINING

The contractor shall conduct a training session for up to 5 users at NIST. The training shall provide a thorough demonstration of all system functions, specifications, maintenance, data administration, and basic troubleshooting, including a full cool-down of the system. The training may be completed at NIST Monday – Friday during the operating hours of 8:30 am – 5:00 pm, and may occur as part of the installation, or immediately after installation and must be completed no later than 1 week after installation.

X. INSPECTION & ACCEPTANCE

In addition to the inspection and acceptance terms articulated in 52.212-4, the Government reserves the right to perform such performance tests and evaluations as defined below to verify specified system performance. Such tests and evaluations, if performed, shall be conducted within the environment that the system is to be operated. The Contractor has the right to be present during the tests and evaluations, if performed, at the Contractor’s expense.

Performance Tests:

1. Verify that fridge reaches quoted base temperature.

2. Verify that fridge has quoted cooling power.

3. Verify that fridge meets quoted cool-down and warm-up times.

4. Verify operation of gas handling system.

5. Verify operation of thermometry.

6. Verify vibration isolation specifications.

7. Verify continuity of DC and RF wiring.

NIST may choose at its discretion to forego this part of acceptance testing.

A visual inspection of the equipment will be performed by the NIST TPOC to identify surface defects or any form of indication that any equipment was damaged during transport to NIST. The Government shall have sole discretion to require repair or replacement of damaged and/or nonconforming supplies at no cost to the Government. The Government at any time prior to acceptance shall reject the equipment due to defects and/or nonconformance. The vendor is responsible for latent defects discovered any time after final inspection. However, the extent of its liability shall be prorated over the useful life of the equipment.

Ownership of the equipment shall transfer to NIST upon acceptance by the Government.

The Government will test, inspect, and accept or reject the equipment within 10 working days of the system installation and training unless otherwise indicated above. The Government reserves the right to conduct quality assurance testing to confirm that a given instrument(s) meets the manufacturer’s and/or the Government’s performance specifications. It is anticipated that the equipment will meet all manufacturer’s specifications and/or the Government’s performance specifications identified in the most recent operations and maintenance manual for each piece of equipment and/or in this document.

XI. WARRANTY

The contractor shall warranty the entire system for a period of a minimum of 1 year after receipt of the equipment and shall be in accordance with terms in FAR 52.212-4. Warranty shall commence upon acceptance of the system by the Government.

XII. PAYMENT SCHEDULE

The Contractor must invoice in arrears according to the payment schedule. The Contractor shall be paid, in accordance with Net 30-day payment terms, upon receipt and acceptance of a proper invoice, in accordance with the following schedule:

1. 40% upon order

1. 10% upon receipt and acceptance of detailed drawings of room layout, system, and dilution unit including optical ports and sample space

1. 40% upon delivery

1. 10% after installation and acceptance by the TPOC of fully installed system, AND

3. After the successful completion of the testing requirements set forth in this document under section X set forth in this document, AND

3. After successful demonstration by the instrumentation that it performs IAW the technical requirements set forth in this document AND

3. After receiving an invoice submitted properly, IAW the purchase order terms and conditions.

NOTE: Partial shipments and partial invoices will not be accepted, unless otherwise requested and accepted by the Contracting Officer prior to award offer. Proposed payment schedules shall be submitted with vendor’s response to the RFQ for consideration.

XIII. MISCELLANEOUS INFORMATION

Safety: The Contractor employee must be responsible for knowing and complying with all installation safety prevention regulations. Such regulations include, but are not limited to, general safety, fire prevention, and waste disposal.

Security: NIST is a restricted campus. An identification badge is required for access for entry into buildings and is shown to the armed Security Police when entering the campus.

Regular Business Hours. Regular business hours are Monday through Friday, 8:00 am to 5:00 pm Eastern Time, excluding Federal holidays and NIST closures.

Identification Badges: Contractor employees must comply with NIST identification and access requirements. Each Contractor employee must wear a visible identification badge provided by the NIST Security Office.

Vehicle Registration: All Contractor employees must register their vehicles with the NIST Security Office to gain access to the campus. A valid driver’s license, Government-furnished civilian ID, proof of insurance and current registration must be presented to the NIST Security Office, at which time a NIST vehicle pass will be issued. The pass must be displayed on the vehicle in accordance with NIST Security Office instructions.

File details come from the government source that posted it. Updated .