Statement of Work - On Ground Mobile Office - 19 August 2022.pdf

PDF 152 KB Posted

Attached to
On-Ground Mobile Offices Federal contract opportunity
Solicitation number
W50S92-22-Q-9021
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to On-Ground Mobile Offices, newest first.
File Type Posted
Combo Synopsis Solicitation-Mobile Offices.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW) FOR SUPPLIES

201st REGIONAL TRAINING SITE

DATE:

TITLE: On Ground Mobile Offices

1. PURPOSE. Required for sheltered instruction of tasks to complete mission required training daily.

2. SCOPE OF WORK. The contractor shall provide all materials and support necessary to meet the required specifications for the on ground mobile office.

3. DELIVERY LOCATION AND DELIVERY DATE. This equipment shall be delivered to the 201st Regional Training Site, Building 15-030, located at 15-030 Range Road, Fort Indiantown Gap, Annville, Pennsylvania 17003 not later than 1 March, 2023.

4. QUANTITY REQUIRED: 5 each

5. SPECIFICATIONS REQUIRED.

5.1. Must meet the following specifications for adequate efficiency for the schoolhouse:

5.1.1 On ground mobile office must be 20 feet in length, 8 feet in width, and 8 feet 6 inches in height.

5.1.2 One entry man door, two windows on the front 20 foot side, one located on either side of the entry door, centered between the wall and the door. Two windows on the rear 20 foot side. All windows must be a minimum height of 36 inches and a minimum width of 48 inches.

5.1.3 Climate control units built into the container with heat and air conditioning. Air conditioning unit must be powered by electric. Heating unit must be powered by either electric or propane. If the heating unit is powered by propane, the mobile office must have a propane connection ran to the rear exterior of the mobile office.

5.1.4 On ground mobile office must be insulated.

5.1.5 On ground mobile office must have 120/240 volt electrical service ran in the interior of the container, with a minimum of 5 wall outlets and 1 light switch.

5.1.6 On ground mobile office must have 2 lights mounted on the ceiling of the interior of the container.

5.1.7 The interior of the on ground mobile office must be finished with either wood or fiberglass paneling on the walls and ceiling.

5.1.8 Floor of the on ground mobile office must be finished with either tile or laminate flooring.

5.1.9 On ground mobile office must be equipped with a fixed to the wall, or fixed to the ground desk with countertop that expands the entire length of the 8 foot side on the right of the office upon entrance of the office.

5.1.10 On ground mobile office must have holes at the base of the container to enable access for a forklift to lift the container and move the container as necessary.

5.1.11 On ground mobile offices will be off loaded on site with our companies equipment and manpower.

5.1.12 Contractor shall notify Government POC, two weeks prior to scheduled delivery.

END