Statement of Work.pdf
PDF 175 KB Posted
- Attached to
- Office Carpet, Trim and Paint Federal contract opportunity
- Solicitation number
- 12505B21Q0197
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 1442 with Clauses and Provisions.pdf | ||
| ARS-371.pdf | ||
| ARS-372.pdf | ||
| Past_Performance.pdf | ||
| Wage Determinations.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW)
Project: Remodel Four (4) Offices within USDA NLAE Laboratory Space
GENERAL INFORMATION
1.0 Scope of Work:
The USDA National Laboratory for Agriculture and the Environment (NLAE), 1015 North University Boulevard, Ames, IA, 50011 has a requirement to remodel four offices with new paint, carpet and vinyl trim.
2.0 Background:
Offices 224, 232, 238 and 340 require remodel. Offices are approximately 165 sq.ft. (11’x14’9”) each. Each of the four offices are nearly identical. All are corner offices. Two walls have large windows (1 each of the 11’ and 14’9). There is a bulkhead above the windows and a knee wall below the windows. All demolished material shall be properly disposed of by the contractor and cost included in the contract.
CONTRACTOR REQUIREMENTS
3.0 Technical Requirements/Tasks:
1. Work on this project shall be completed by technicians with at least 3 years of experience.
2. Carpet – Existing carpet shall be removed, and old carpet adhesive scraped from existing concrete floor. Floor shall then be prepared for new carpet tiles.
a. New carpet shall be Milliken Southern Analog Panoramic PA117
Vignette. New black vinyl trim shall be installed.
b. All carpet tile seams shall be square and seamless (no gaps in carpet tiles). Tile shall be placed in and alternating 90 degree/quarter turn pattern. Carpet tiles shall lay flat on the floor.
Vinyl trim shall be glued to the wall without puckering or waviness. Carpet tiles shall not have gaps or puckers or waviness to them. Seams of the carpet tiles shall be spaced evenly and esthetically pleasing to the eye. No tiles “out of place”.
3. Paint - Walls shall be prepped (nail holes filled if needed).
a. Walls shall be painted with two coats of Sherwin-Williams
#703906.
b. Receptacle and switch covers shall be removed prior to painting and reinstalled when dried.
c. Dry erase and bulletin boards may remain wall mounted and painted around.
d. Paint shall not overlap on to unpainted surface. If so, it shall be cleaned up. No paint to be on the frames of windows, dry erase boards or bulletin boards. No paint to be on the carpet or vinyl trim.
4. Contractor will communicate with Technical Point of Contact to determine work completion when carpet has been installed and painting has been completed.
5. Contractor’s bid shall include three local references for carpet and painting work completed in the past 5 years.
4.0 Government Furnished: Government shall provide access to building during normal (7:00 a.m. to 4:30 p.m.) hours.
5.0 Deliverables / Schedule: Work is expected to be fully complete within 90 days from date of award.
6.0 Travel: N/A
7.0 Contractor’s Key Personnel: N/A
8.0 Security Requirements: No felons.
9.0 Data Rights: N/A
10.0 Section 508 – Electronic and Information Technology Standards: N/A
11.0 Place of Performance: USDA-NLAE, 1015 N. University Blvd, Ames, IA 50011.
| CONTRACTOR REQUIREMENTS |
| 3.0 Technical Requirements/Tasks: |
| 6.0 Travel: N/A |
| 7.0 Contractor’s Key Personnel: N/A |
| 8.0 Security Requirements: No felons. |
| 9.0 Data Rights: N/A |
| 10.0 Section 508 – Electronic and Information Technology Standards: N/A |
File details come from the government source that posted it. Updated .