This statement of work defines requirements for two 155mm post-rifle pneumatic bore gages and related installation and training services to be provided to the Department of the Army Materiel Command Contracting Command Detroit Arsenal. The bore gages will be capable of measuring bore and groove diameters to a depth of 30 feet with 0.5mm accuracy, and will include Windows 10 touchscreen displays, mobile carts, storage cases, and required accessories. The contractor must comply with all applicable safety and technical requirements and submit documentation for government approval. A minimum of two days of onsite manufacturer support is required for installation and training at Watervliet Arsenal.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911PT22Q0021 - Air Gages.pdf | ||
| STATEMENT OF WORK - 155MM PRIOR TO RIFLE AIR GAGES ODP-P.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
PURCHASE AND INSTALATION OF
155MM POST RIFLE PNEUMATIC BORE GAGES
Watervliet Arsenal Building 35-2
PR 75220404
PRODUCTION PLANNING (ODP-P)
PART 1 GENERAL
1.01 Overview.
A. This Statement of Work (SOW) defines the requirements for 155mm post rifle bore gages.
1.02 Hours of Operation.
A. Normal duty hours are 7:00 AM through 4:00 PM, Monday through Thursday, and 7:00 AM through 3:00 PM on select Fridays (the arsenal is closed every-other Friday). Federal holidays are non-work days. If a federal holiday falls on a Saturday or Sunday, the preceding Friday or following Monday is a work holiday.
1.03 General Requirements.
A. The contractor shall perform all work in strict conformance with Watervliet Arsenal Instructions for Contractors (WAIC). The contractor shall read and understand this document prior to submitting a proposal. The WAIC is publically available at:
http://www.wva.army.mil/Documents/Contracting/WAIC.pdf B. Bore gage capapble of measuring in-process bore diameters, groove diameters and concentricity of the rifling profile to the bore using contact gaging.
C. Uses opposing LVDT probes to measure major diameter of 157.5 ± 0.5mm/ 6.201 ± .020” D. Usesopposing LVDT probes to measure minor diameter of 155.0 ± 0.5mm/6.102 ± .020” E. Measure bore and groove diameters to a max depth of 30 feet. Gage handle to include graduations for bore depth measurement in 1/16” increments.
F. Dimentron style body will utilize an opposing pneumatic slide mechinism and air blow off built into the body of the measuring head to avoid marring gun bores.
G. All pneumatics to be activated manually by valve or foot switch H. Display will be Windows 10 PC with 17” touch screen monitor.
I. Any required software licenses to be included in proposal.
J. Mobile cart to mount PC and store master set rings.
K. Basic user manual to be included.
L. Include all accessories required to operate the gage, including valves, foot switches etc.
M. Include 5 masters to cover pre and post chrome plated diameters.
N. Up to 3 pelican type storage cases per gage as required.
O. Minimum 2 days of manufacturer/vendor support required for installation and training at Watervliet Arsenal.
P. Include complete list and source of supply for all wear components and or spare parts including measuring contact points, spacers, air hose, electrical cables and measuring head components.
Q. Function and repeatability test to be performed at WVA.
1.04 Safety Requirements.
A. General.
1. The contractor shall be responsible for complying with all DOD, Army, Federal and State health and safety requirements that are applicable to this project, and shall use all means and precautions available to ensure the safety of the occupants and protection to the existing buildings and structures.
1.05 Applicable Documents.
A. Watervliet Arsenal Instructions for Contractors (WAIC).
1.06 Submittals.
A. The contractor shall e-mail all submittals to the Contracting Specialist for review and approval. All submittals require government approval unless otherwise explicitly stated.
PART 2 PRODUCTS
2.01 General.
A. Unless otherwise stated, all materials for this project shall be new. All products shall not contain any asbestos, mercury, chromium/lead paint, Class I Freon and Polychlorinated Biphenyls (PCB).
B. All work shall be in strict accordance with product manufacturer’s instructions and specifications, including but not limited to manufacturer guidance for storage, staging, application, installation and disposal of the product.
2.02 Products and Materials.
A. Bore gage for diameter measurement of 155mm barrels after rifling pre and post plated bores.
B. Installation and training required for use of bore gage.