SRD 2023 Lake Eva Dock Repairs - Appendix 4 original construction drawings.pdf
PDF 6 MB Posted
- Attached to
- Lake Eva Dock Repair Services Federal contract opportunity
- Solicitation number
- 1240BF23Q0048
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SRD 2023 Attachment 1 Lake Eva Dock Repairs - PWS.pdf | ||
| 1240BF23Q0048 Lake Eva Dock Repairs.pdf | ||
| SRD 2023 Lake Eva Dock Repairs - Appendix 3 anchor plan.pdf | ||
| SRD 2023 Lake Eva Dock Repairs - Appendix 1 photos.pdf | ||
| SRD 2023 Lake Eva Dock Repairs - Appendix 2 shop drawings.pdf | ||
| WD 2015-5685 R19 12.27.2022 SE Alaska.pdf | ||
| 1240BF23Q0048 Scedule of Items Offer Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Recommended by:
Forest Engineering Staff Officer
Forest Landscape Architect
DATE
DATE
DATE
Forest Recreation Staff Officer DATE
VICINITY MAP
132°136°138°140°142° 134°
JUNEAU
132°
GULF OF ALASKA
56°
58°
Sitka
138°
60°
Yakutat
ALASKA
142°
62°
C
AN
AD
A
140°
Skagway
136° 134°
56°
54°
Ketchikan
Wrangell
Petersburg
60°
58°
130° 128°
INDEX TO SHEETS
NO. DESCRIPTION
Forest Supervisor
Approved by:
DATE
Sitka Ranger District
DATE
Craig
District Ranger, Sitka
DEMOLITION, BOARDWALK, CABIN, TOILET,
AND FLOAT PLANE DOCK
DATEDirector of Recreation
Director of Engineering
PERIL STRAIT
TRAIL
R. Redick 04/16/10
M. Adams 04/16/10
PLOT ON 11"X17" PAPER
PROJECT
LOCATION
LAKE EVA CABIN SITE
RECONSTRUCTION
SCALE: 1" = 3 4 Mile
PROJECT
LOCATION
BARANOF ISLAND
T. Grier 04/16/10
SOURCE: USGS
TONGASS NATIONAL FOREST - SITKA RANGER DISTRICT Sh ofUSDA FOREST SERVICE - R-10
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:TONGASS
TNFTYP:09/04
LAKE EVA CABIN SITE RECONSTRUCTION
5/10/2011 Demolition, Main Deck, Dock only E.Oman
REFERENCE ONLY
EXISTING SITE PLAN LEGEND AND NOTES
TONGASS NATIONAL FOREST - SITKA RANGER DISTRICT Sh ofUSDA FOREST SERVICE - R-10
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
TNFTYP:09/04
LAKE EVA CABIN SITE RECONSTRUCTION
5/10/2011 Demolition, Main Deck, Dock only E.Oman
R. Redick 4/16/10
R. Redick 4/16/10
LAKE EVA
EXISTING SITE PLAN
T. Grier 4/16/10
TONGASS NATIONAL FOREST - SITKA RANGER DISTRICT Sh ofUSDA FOREST SERVICE - R-10
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
TNFTYP:09/04
LAKE EVA CABIN SITE RECONSTRUCTION
5/10/2011 Demolition, Main Deck, Dock only E.Oman
CABIN TO FLOAT - PLAN AND PROFILE
S. Cegelka 4/16/10
R. Redick 4/16/10
BOARDWALK CABIN AND DECK FOUNDATION PLAN
FOUNDATION PLAN
SCALE: 1/8" = 1'-0"
S. Cegelka 4/16/10 TONGASS NATIONAL FOREST - SITKA RANGER DISTRICT Sh ofUSDA FOREST SERVICE - R-10
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
TNFTYP:09/04
LAKE EVA CABIN SITE RECONSTRUCTION
BOARDWALK AND DECK FRAMING PLAN
S. Cegelka 4/16/10
DECK FRAMING PLAN
SCALE: 1/8" = 1'-0"
TONGASS NATIONAL FOREST - SITKA RANGER DISTRICT Sh ofUSDA FOREST SERVICE - R-10
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
TNFTYP:09/04
LAKE EVA CABIN SITE RECONSTRUCTION
FOOTING DETAILS
S. Cegelka 4/16/10
F1 - FOOTING ELEVATION1 F2 - FOOTING ELEVATION2 F3 - FOOTING ELEVATION3 POST CAP CONNECTION4
F1 - FOOTING PLAN5 F1A / F3A - FOOTING PLAN6 F3 - FOOTING PLAN7
TONGASS NATIONAL FOREST - SITKA RANGER DISTRICT Sh ofUSDA FOREST SERVICE - R-10
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
TNFTYP:09/04
LAKE EVA CABIN SITE RECONSTRUCTION
B O
T R
IS
E
R
STAIR SECTION
RAMP LANDING FRAMING PLAN
SCALE: 1/2" = 1'-0"
BENCH FRAMING PLAN
SCALE: 1/2" = 1'-0"
S. Cegelka 4/16/10
R. Redick 4/16/10
FRAMING DETAILS
S. Cegelka 4/16/10
SCALE: 3/8" = 1'-0"
SCALE: 3/8" = 1'-0"
PARTIAL LANDING AND STAIR PLAN
TONGASS NATIONAL FOREST - SITKA RANGER DISTRICT Sh ofUSDA FOREST SERVICE - R-10
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
TNFTYP:09/04
LAKE EVA CABIN SITE RECONSTRUCTION
5/10/2011 Demolition, Main Deck, Dock only E.Oman
A
A
B
B
S. Cegelka 4/16/10
R. Redick 4/16/10
FRAMING DETAILS
S. Cegelka 4/16/10
SECTION - GANGWAY FOUNDATION1
TYP RAMP SECTION WITH RAILING3
TONGASS NATIONAL FOREST - SITKA RANGER DISTRICT Sh ofUSDA FOREST SERVICE - R-10
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
TNFTYP:09/04
LAKE EVA CABIN SITE RECONSTRUCTION
5/10/2011 Demolition, Main Deck, Dock only E.Oman
SCALE: 3/4" = 1'-0"
DOUBLE BRACING ELEVATION
A-A
B-B
SCALE: 3/4" = 1'-0"
SINGLE BRACING ELEVATION4 5
GANGWAY FDN -
ROCK ANCHOR LAYOUT
FRAMING DETAILS
S. Cegelka 4/16/10 TONGASS NATIONAL FOREST - SITKA RANGER DISTRICT Sh ofUSDA FOREST SERVICE - R-10
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
TNFTYP:09/04
LAKE EVA CABIN SITE RECONSTRUCTION
5/10/2011 Demolition, Main Deck, Dock only E.Oman
SCALE: 3/4" = 1'-0"
DECKING
DECK RAILING
SCALE: 1/2" = 1'-0" / 1-1/2" = 1'-0"
SECTION - STAIR RAILING1
SCALE: 1-1/2" = 1'-0"
TYP JOIST CONNECTION @ RAMP2
SCALE: 1-1/2" = 1'-0"
RAMP & DECK FRAMING3
SCALE: 1" = 1'-0"
FRAMING DETAILS
SCALE: 3/8" = 1'-0"
A-A
S. Cegelka 4/16/10
FIRE PIT LAYOUT PLAN
TONGASS NATIONAL FOREST - SITKA RANGER DISTRICT Sh ofUSDA FOREST SERVICE - R-10
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
TNFTYP:09/04
LAKE EVA CABIN SITE RECONSTRUCTION
5/10/2011 Demolition, Main Deck, Dock only E.Oman
SCALE: 3/4" = 1'-0"SCALE: 3/4" = 1'-0"
BENCH CORNER DETAILBENCH SECTION (TYP) 2
ELEVATION VIEW
PLAN VIEW
SECTION A-A SECTION B-B
SHORE MOUNT ASSEMBLY
BOLT IN PLACE SHORE MOUNTCAST IN PLACE SHORE MOUNT
BOLT IN PLACE
(EXISTING CONCRETE OR TIMBER)
BOLT IN PLACE SHORE MOUNT
SECTION B-B
CAST IN PLACE SHORE MOUNT
SECTION A-ABOLT IN PLACE
(EXISTING CONCRETE OR TIMBER)
SHORE MOUNT ASSEMBLY
DROP LINK
SECTION A-A
WATER END TRANSITION PLATE
ELEVATION VIEW
STANDARD TRANSITION PLATE SLOPED DECK OPTION
WATER END SKID OPTION
ELEVATION VIEW
TONGASS NATIONAL FOREST - SITKA RANGER DISTRICT Sh ofUSDA FOREST SERVICE - R-10
DESIGNED: DATE:
DATE:DRAWN:
REVIEWED: DATE:
DATE: REVISION: BY:
PLOT ON 11"X17" PAPER
TONGASS
TNFTYP:09/04
LAKE EVA CABIN SITE RECONSTRUCTION
5/10/2011 Demolition, Main Deck, Dock only E.Oman
R. Redick 4/16/10
R. Redick 4/16/10
GANGWAY AND FLOAT CONCEPT
File details come from the government source that posted it. Updated .