SQSR.pdf

PDF 483 KB Posted

Attached to
REPAIR SERVICES Federal contract opportunity
Solicitation number
FA825024Q0002
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document contains justification for qualification requirements for repair services of an Ethernet switch used in a Global Positioning System. The Air Force Sustainment Center is soliciting proposals for repair services of the C3750X-24T-S Ethernet switch under solicitation number FA825024Q0002. Qualification is required due to the critical and complex nature of the switch and strict tolerances required. Potential offerors must demonstrate facilities, inspection capabilities, repair processes, and ability to test to required specifications at their own cost within an estimated 30 days. Waivers may be granted for offerors with past experience supplying similar products to the government or original equipment manufacturer. Only fully qualified sources by the proposal deadline will be considered for award.

View the file

Other files for this federal contract opportunity

Other files attached to REPAIR SERVICES, newest first.
File Type Posted
FA825024Q00020001.pdf PDF
DRAWING1.pdf PDF
CDRLS.pdf PDF
ITMDESC_REPORT.pdf PDF
RDL_REPORT.pdf PDF
EO.pdf PDF
CAVAF.pdf PDF
PWS.pdf PDF
PKGRQMT_REPORT.pdf PDF
FA825024Q0002.pdf PDF
IUID_LABEL.pdf PDF
SOW.pdf PDF
TRNSPDATA_REPORT.pdf PDF
UIIEC_REPORT.pdf PDF
SPIRES.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUSTIFICATION FOR QUALIFICATION REQUIREMENTS

FAR 9.202(a) Policy and DoD 4120.24-M Defense Standardization Program, Policy and Procedures

27 Nov 2023 Section A & Section B & Section D

RMSC: C (AFMCI 21-113, Contract Maintenance Program for Depot Maintenance Activity Group)

SECTION A: ITEM IDENTIFICATION

1. National Stock Number (NSN): 5895-01-591-7081

2. Part Number (P/N): WS-C3750X-24T-S

3. Noun: Ethernet Switch

4. Application: AN/FSQ-141(V) Global Positioning System/Operational Control System

SECTION B:

1. JUSTIFICATION FOR ESTABLISHING A QUALIFICATION REQUIREMENT

a. Criticality: Repair/overhaul of this Ethernet Switch requires engineering source approval by the engineering support activity 415 SCMS/GUEA in order to maintain the quality of the part.

Failure to procure this Ethernet Switch from a fully qualified repair source can result in structural or functional deficiencies that will degrade the mission capability of the AN/FSQ- 141(V) Global Positioning System/Operational Control System.

b. Complexity, Repair Processes, and/or Material Considerations: Inadequate control of characteristics associated with machining, repair, and processing of this Ethernet Switch can result in product structural or durability degradation. Close tolerance matching of components is required. Special care and attention is required for surface finish, assembly, and sealing of this Ethernet Switch to assure compliance with specified acceptance test requirements.

c. Form, Fit, Function, and Interface: The qualification requirements specified herein are necessary to verify the structural and/or functional integrity and/or fit, form, and interface of the Ethernet Switch being procured.

2. REASON WHY QUALIFICATION REQUIREMENT MUST BE DEMONSTRATED PRIOR TO ANY CONTRACT

AWARD

a. Completion of the specified pre-contract award qualification requirements are necessary to assure the government that the offeror is capable of repairing the Ethernet Switch in compliance with the applicable technical specification/data within the schedule and economic constraints of our contracts. There are significant technical and schedule risks which can only be minimized by a completion of the requirements prior to contract award.

b. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified are $0.00.

c. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 30 days. This is based on complexity of the Ethernet Switch and other factors.

JUSTIFICATION FOR QUALIFICATION REQUIREMENTS

27 Nov 2023 Section A & Section B & Section D

SECTION D: SIGNATURES

X Chief of Contracting Office (COCO)

X 415 SCMS/GUEA Lead Engineer

Engineer Support Activity (ESA)

X 415 SCMS/GUEA Engineer

Engineer Support Activity (ESA)

REPAIR QUALIFICATION REQUIREMENTS

NSN: 5895-01-591-7081

P/N: WS-C3750X-24T-S

Noun: Ethernet Switch Application: AN/FSQ-141(V) Global Positioning System/Operational Control System

27 Nov 2023 Supporting Information

Qualification Requirement Cost Estimate

Estimate the likely cost for testing and evaluation which will be incurred by the potential offeror to become qualified. This is a requirement of FAR 9.202(a)(1)(ii) and 10USC2319(b)(3) (The following categories may not apply in all cases. The product engineer should identify the costs applicable to the project and indicate N/A on all sections that do not apply.)

Total cost is $ 0.00

Section A. Shipping, if required, use DD Form 1654, Evaluation of Transportation Cost Factors to develop the information. Refer any questions to the Procurement Contracting Officer for cost estimation.

Section B. Dimensional/Electronic Verification. Contact the science/engineering laboratory to obtain cost estimates (bids) for tests such as:

$ 0.00

a. Chemical

b. Metallurgical $ 0.00

(1) Destructive

(2) Non-Destructive

c. Dimensional

d. Electronic

e. Mechanical

f. Non-Destructive Inspection

Section C. Nuclear Hardness [This includes cost of shock, vibration, and Electro-Magnetic Pulse (EMP)]. Contact Systems Engineering Integration and Test Division for hourly rate.

Section D. Form, Fit, Function and Interface. Contact your organizational Production Management Specialist (PMS) to obtain information on the same or similar item where work has been accomplished in the past using AFMC Form 206, Temporary Work Request.

Section E. Original Equipment Manufacturer (OEM) Qualification Testing (If required) $ 0.00

a. Laboratory Costs (Costs are directly dependent on the type of testing to be accomplished and the location and duration of the testing. For example, landing gear laboratory testing is normally accomplished on a dynamometer and costs vary from $25,000 to $500,000 depending on the depth of testing. Aircraft and missile testing will vary as the requirement dictates and the cost will have to be identified by the source of testing).

b. Flight/Data Reduction & Analysis Costs.

Section F. Travel by Contractor to Test Site (if required) $ 0.00

a. Lodging

b. Per Diem

c. Rental Cars

d. Incidentals (Verified)

e. Air Fare (Verified)

Section G. SAR Package Development/Evaluation Cost: A potential new source’s development of a Source Approval (SAR) package may cost as much as:

In addition, the cost incurred for Government evaluation of their SAR may be as much as:

Evaluation cost may be borne by the government if it is in the best interest of the Government to qualify alternate sources.

P/N: WS-C3750X-24T-S

27 Nov 2023 Supporting Information

P/N: WS-C3750X-24T-S

27 Nov 2023 Section C 1/3

SECTION C:

1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE

a. Prequalification Notice: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this Ethernet Switch.

b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to repair, inspect, test, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.

c. Data Verification: The offeror must verify that they have a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession including, at a minimum CISCO SYSTEMS INC (CAGE 0GX96) drawings for the WS-C3750X-24T-S. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.

d. Repair Process Verification: The offeror must repair this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 415 SCMS/GUEA. The offeror shall also identify its sources for materials and its standards for internally used processes.

e. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to 415 SCMS/GUEA for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by drawings for the WS-C3750X-24T-S.

f. Qualification Article Verification: N/A

g. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified are $0.00.

h. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 30 days. This is based on complexity of the Ethernet Switch and other factors.

i. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the

P/N: WS-C3750X-24T-S

27 Nov 2023 Section C 2/3 contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.

j. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved repair source for this item. Approval, however, does not guarantee subsequent contract award.

P/N: WS-C3750X-24T-S

27 Nov 2023 Section C 3/3

2. SOURCE QUALIFICATION WAIVER REQUIREMENTS

Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:

a. QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).

b. QWC2: The potential source is qualified on the right-hand article and requests to be qualified on the left-hand article. If the right-and left-hand articles are mirror images of each other, then approval can generally be given.

c. QWC3: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.

d. QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.

e. QWC5: A source qualified to provide a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.

f. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the repair process.

2023-11-27T09:19:53-0700
DYE.ERIC.R.1286171954
2023-11-27T09:36:17-0700
ANDRASKO.JACKSON.1258051030
2023-11-30T14:40:14-0700
STARK.DAVID.J.1254575271

File details come from the government source that posted it. Updated .