This solicitation requests proposals for repair services. The Department of the Air Force Materiel Command Air Force Sustainment Center seeks repair and testing of digital switching groups, along with associated data deliverables. Offerors must propose firm fixed prices for teardown and evaluation, repair, and data including test procedures, reports, and preventative plans. Proposals are due within 30 days of receipt, with repair work to be completed within 90 days. Award will be made to the qualified offeror with the lowest total evaluated price meeting delivery schedules and terms.

View the file

Other files for this federal contract opportunity

Other files attached to REPAIR SERVICES, newest first.
File Type Posted
FA825024Q0002.pdf PDF
IUID_LABEL.pdf PDF
SOW.pdf PDF
TRNSPDATA_REPORT.pdf PDF
UIIEC_REPORT.pdf PDF
SPIRES.pdf PDF
DRAWING1.pdf PDF
CDRLS.pdf PDF
ITMDESC_REPORT.pdf PDF
EO.pdf PDF
CAVAF.pdf PDF
PWS.pdf PDF
PKGRQMT_REPORT.pdf PDF
SQSR.pdf PDF
RDL_REPORT.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

J

2. AMENDMENT/MODIFICATION NO.

FA8250-24-Q-0002-0001

3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.

FD20202400250

5. PROJECT NO (If applicable)

6. ISSUED BY CODE

DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING

AFSC PZAAA1

6050 GUM LANE BLDG 1215

HILL AIR FORCE BASE UT 84056-5825

BUYER: John K Prather Jr/AFSC john.prather.3@us.af.mil Phone: (801) 586- 3463

7. ADMINISTERED BY (If other than item 6) CODEFA8250

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

X

9A. AMENDMENT OF SOLICITATION NO.

FA825024Q0002

9B. DATED (SEE ITEM 11)

14-DEC-2023

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

ROUTINE

This requirement is not an inherently government function. Repair effort is deemed performance based. Critical Safety Item (CSI) does not apply to this PI.

15A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

BY ________________________________________________________

(Signature of person authorized to sign)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY ____________________________________________________

(Signature of Contracting Officer)

16C. DATE SIGNED

FACILITY CODE

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

PRESCRIBED BY GSA

FAR (48 CFR) 53.243

X

X X

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

FA8250-24-Q-0002-0001

Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION

The purpose of this amendment is to change the Repair CLIN 0002:

FROM: Not to Exceed TO: FFP

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

Requirement restricted to qualified source(s). All non-qualified vendors that submit a proposal in support of this requirement must comply with qualification requirements found in clause 52.209-1, and the source qualification statement attached hereto, in order to be considered for award. Award shall not be delayed to qualify new sources.

“In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the contractor must include a DD1348-1 when serviceable assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1, but will ensure a DD1348-1 is included with each returned serviceable asset. If a DD1348-1 is not included with each returned serviceable asset, DCMA will not sign the receiving report (DD250).”

ACO Authority and Responsibilities:

1) All applicable contract admin functions as outlined in FAR 42.302(a) and DFARS 242.302(a)

2) Extend the delivery schedule as required and take consideration if deemed necessary.

3) The ACO or the ACO's delegated authority shall indicate inspection and acceptance in Wide Area

Work Flow (WAWF) for CLIN 0001.

4) De-obligate excess funds if asset is determined to be Beyond Economic Repair (BER).

5) The government is authorized to withhold a portion of the total contract price pursuant to clause ‘Technical Data – Withholding of Payment (MAR 2000)’ DFARS 252.227-7030 should the contractor fail to deliver data as required by the CDRL of this requirement.

NOTE: In the event funds on the order are insufficient based on the contractor's proposal and the judgment of the ACO, the ACO will document what is a fair and reasonable price, and provide the pricing documentation to the PCO for action. The PCO will then address funding and supplemental agreement when approved, and will direct the contractor for commencement of work.

In the case of a Beyond Economical Repair (BER) determination, DCMA QAR shall request disposition instructions and/or condemnation approvals from the cognizant USAF Program Manager or customer, and supply disposition/condemnation instructions to the contractor.

TEARDOWN, TEST AND EVALUATION

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

2 EA

CLIN ACRN ACRN Total

TEARDOWN, TEST AND EVALUATION

0001 AA

NSN: 5895-01-591-7081 GO

SWITCHING GROUP,DIG

digital converter Metal, cooper, circuit card material Manufacturer Part Number

52GG4 WS-C3750X-24T-S

70221 WS-C3750X-24T-S

Priority: R

Inspection: Origin Acceptance: Origin Quality Assurance: Standard Inspection Applicability: None ;

IUID Required: Yes Physical Item Markings:

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

+ CNOTE ORIGIN

Type / Ship To PACRN Mark For

+ CNOTE PAC

Type / Ship To Quantity (U/I) *ARO After Receipt of

Carcass Req No / Pri

Required Delivery

+ CNOTE 2 EA *30 Days

Proposed Delivery

+ CNOTE 2 EA

AT plant

REPAIR

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

2 EA

CLIN ACRN ACRN Total

0002 AA

NSN: 5895-01-591-7081 GO

SWITCHING GROUP,DIG

Manufacturer Part Number

52GG4 WS-C3750X-24T-S

Priority: R

Limitations of Liability: Other Than High Value Item

REPAIR

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Applicability: None ;

IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3215 ORIGIN

Type / Ship To PACRN Mark For A SW3215 PAC Account A Type / Ship To Quantity (U/I) *ARO After Completion of Study Req No / Pri

Required Delivery

A SW3215 2 EA *90 Days

Proposed Delivery

A SW3215 2 EA

Upon completion of CLIN 0001 a detailed repair quote shall be forwarded to the DCMA ACO. Work shall not begin under CLIN 0002 until notice to proceed is provided from DCMA or the PCO.

Cav AF A001,A002, A003

Item No.

Not Separately Priced Quantity U/I Unit Price

1 EA NSP

Data IAW DD Form 1423-1 A001,A002, A003 Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FB2029 DESTINATION

Cav AF A001,A002, A003

Type / Ship To Quantity (U/I) *ARO 24 hours following a supply or maintenance transaction, after the contract award date.

Req No / Pri

Required Delivery

A FB2029 1 EA *24 Hours

Proposed Delivery

A FB2029 1 EA

The prices of not-separately-priced DATA are included in the price of the individual Repair CLINS. Failure to comply with contract data requirements may result in the withholding of payment on the DATA CLINs. This allows the government to withhold payment on the repairs if the contractor does not deliver the required data. The data is a material requirement of the contract.

IAW DD Form 1423-1 A001,A002, A003

RIIR B0001

Item No.

Not Separately Priced Quantity U/I Unit Price

3 EA NSP

Data IAW DD Form 1423-1 B0001 Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FY2073 DESTINATION

Type / Ship To Quantity (U/I) *ARO Contractor shall deliver the Repairable Item Inspection report within 7 days after the completion of

Req No / Pri

Required Delivery

RIIR B0001

A FY2073 3 EA *7 Calendar Days

Proposed Delivery

A FY2073 3 EA

The prices of not-separately-priced DATA are included in the price of the individual Repair CLINS. Failure to comply with contract data requirements may result in the withholding of payment on the DATA CLINs. This allows the government to withhold payment on the repairs if the contractor does not deliver the required data. The data is a material requirement of the contract.

IAW DD Form 1423-1 B0001

C001 Counterfeit Prevention Plan

Item No.

Not Separately Priced Quantity U/I Unit Price

3 EA NSP

Data IAW DD Form 1423-1 C001 Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FY2073 DESTINATION

Type / Ship To Quantity (U/I) *ARO CONTRACTOR

SHALL DELIVER THE

COUNTERFIET

PREVENTION PLAN

WITHIN 30 DAYS OF

CONTRACT AWARD

Req No / Pri

Required Delivery

A FY2073 3 EA *30 Calendar Days

Proposed Delivery

A FY2073 3 EA

The prices of not-separately-priced DATA are included in the price of the individual Repair CLINS. Failure to comply with contract data requirements may result in the withholding of payment on the DATA CLINs. This allows the government to withhold payment on the repairs if the contractor does not deliver the required data. The data is a material requirement of the contract.

IAW DD Form 1423-1 C001

D001 Test Procedure

Item No.

Not Separately Priced Quantity U/I Unit Price

3 EA NSP

Data IAW DD Form 1423-1 D001 Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FY2073 DESTINATION

Type / Ship To Quantity (U/I) *ARO The Contractor shall deliver the Test Procedure at least 45 daysprior to test.

Req No / Pri

Required Delivery

A FY2073 3 EA *45 Calendar Days

Proposed Delivery

A FY2073 3 EA

The prices of not-separately-priced DATA are included in the price of the individual Repair CLINS. Failure to comply with contract data requirements may result in the withholding of payment on the DATA CLINs. This allows the government to withhold payment on the repairs if the contractor does not deliver the required data. The data is a material requirement of the contract.

IAW DD Form 1423-1 D001

E001 Test/Inspection Report

Item No.

Not Separately Priced Quantity U/I Unit Price

3 EA NSP

Data IAW DD Form 1423-1 E001 Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A FY2073 DESTINATION

Type / Ship To Quantity (U/I) *ARO The Contractor shall deliver the Test Report NLT 15 days aftertest.

Req No / Pri

Required Delivery

A FY2073 3 EA *15 Calendar Days

Proposed Delivery

A FY2073 3 EA

The prices of not-separately-priced DATA are included in the price of the individual Repair CLINS. Failure to comply with contract data requirements may result in the withholding of payment on the DATA CLINs. This allows the government to withhold payment on the repairs if the contractor does not deliver the required data. The data is a material requirement of the contract.

IAW DD Form 1423-1 E001

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: + CNOTE

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: A FB2029

FB2029 OO ALC DDHU CNTRL RCV

CENTRAL RECEIVING BLDG 849W

CP 385 519 8898

5851 F AVE BLDG 849W

HILL AFB UT 84056-4056

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: A FY2073

FY2073 415 SCMS GUMA

CP 801 586 1368

6041 GUM LANE BLDG 1226 RM 2

HILL AFB UT 84056-4056

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: A SW3215

DLA DISTRIBUTION BARSTOW

CENTRAL RECEIVING WHSE 7

REC OFFICER 760 577 6442

BARSTOW CA 92311-5014

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

AT plant

PART I - THE SCHEDULE

SECTION F

DELIVERIES OR PERFORMANCE

52.247-29 F.O.B. ORIGIN (FEB 2006)

(IAW FAR 47.303-1(c))

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

TRANSPORTATION APPROPRIATION CHARGEABLE

TAI ATAC FMS ALLOTMENT/Note

TAA

TAA ACRN AA FRS3

ACCOUNTING AND APPROPRIATION DATA (AUG 1998)

Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable

AA 97 X4930 FC04 64 4 47 GH 8M834L 01K010 00000 UJEPBD 503000 F03000 $0.00

PSR: K34613 FSR: 001884 DSR: 286400 CIN: F2DCCW3341A1030000AA

ACRN TOTAL $ 0.00

PART II - CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021)

(IAW FAR 22.1705(a)(1))

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)

(IAW FAR 25.1103(a))

252.227-7030 TECHNICAL DATA--WITHHOLDING OF PAYMENT (MAR 2000)

(IAW DFARS 227.7103-6(e)(2), DFARS 227.7104(e)(4))

(a) the Contracting Officer may until such data is accepted by the Government, withhold payment to the Contractor of ten percent (10%) of the total contract price or amount

252.246-7007 CONTRACTOR COUNTERFEIT ELECTRONIC PART DETECTION AND AVOIDANCE

SYSTEM (JAN 2023)

(IAW DFARS 246.870-3(a))

52.249-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (SHORT

FORM) (APR 1984)

(IAW FAR 49.502(a)(1))

52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)

(IAW FAR 49.504(a)(1))

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

(IAW FAR 52.107(b))

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.

Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Regulations URLs: (Click on the appropriate regulation.)

https://acquisition.gov/browse/index/far https://acquisition.gov/dfars https://acquisition.gov/affars

NOTE: After selecting the appropriate regulation above, at the "Table of Contents" page, conduct a search for the desired regulation reference using your browser's FIND function. When located, click on the regulation reference (hyperlink).

52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

(IAW FAR 53.111)

PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J

LIST OF ATTACHMENTS

Form Number Description/File Name Date Number of Pages

1423 COMBINED CDRLS

Contract Data Requirements List - Text Activity

11MAY2022 15

CAV AF REPORTING CAV AF Reporting Requirements

CAV-AF

DD FORM 1653 TRNSPDATA_REPORT.pdf Report

07DEC2023 5

AFMC 158 PKGRQMT_REPORT.pdf Report

07DEC2023 3

SOW PHST SOW.pdf Packaging SOW

SPIRES SPIRES

SPI INFO SPIRES

762A RDL_REPORT.pdf Report

18SEP2023 1

IUID UIIEC_REPORT.pdf Report

ITEM DESCRIPTION ITMDESC_REPORT.pdf Report

IUID LABEL UID Label.pdf Unique Identification Marking Label Instructions

DRAWING DRAWING

Label, Unique Identification (UID), Space and C3I

AF IMT 3925 ENGINEERING ORDER

200827954 EO 11A0821-H

SQSR SQSR.pdf Source Qualification Statement Repair

28NOV2023 7

PWS PWS.pdf

PWS

28NOV2023 10

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION K

REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS

OF OFFERORS OR RESPONDENTS

52.247-53 FREIGHT CLASSIFICATION DESCRIPTION (APR 1984)

(IAW FAR 47.305-9(b)(1))

FOR FREIGHT CLASSIFICATION PURPOSES, OFFEROR DESCRIBES THIS COMMODITY AS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION L

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS

SECTION L

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

INTRODUCTION:

This section provides guidance for preparing proposals and specific instructions on the required format and content. To assure timely and equitable proposal evaluation, offerors shall propose in accordance with this section and all solicitation requirements (i.e.

provisions, clauses, appendices, attachments, forms, etc.). Non-conformance with the instructions provided in this section or the requirements and statements of the solicitation may result in an unfavorable evaluation or proposal disqualification (i.e. the offeror was non-responsive to the solicitation requirements).

The government representatives identified below shall be the sole points of contact for this acquisition. All questions, comments, and/or concerns shall be directed to the below points of contact.

Contracting Officer John Prather

6050 Gum Lane, Bldg 1215 Hill AFB, UT 84056

Email: john.prather.3@us.af.mil ` Tel: 801-586-3463

If an offeror believes that the solicitation contains errors, omissions, or is otherwise unsound (i.e. the offeror is unable to agree to the proposed delivery schedule), the offeror shall immediately notify the aforementioned government representative in writing with supporting rationale. Upon consideration the government may continue, amend, or cancel the solicitation.

The government reserves the right to award this effort based on initial proposals, as received, without discussions IAW FAR 52.215-1. However, if the Contracting Officer (CO) determines that entering into discussions is in the best interest of the Government, the CO may do so.

The government intends to award the requirement(s) represented in this solicitation to one awardee. However, the Government reserves the right to award no contract at all.

PROPOSAL FORMAT:

A digital proposal is required; however, offerors may submit a hardcopy proposal in addition to the digital proposal.

14. Email to the aforementioned government representative(s) is the preferred method for delivering digital proposals.

15. Hardcopy proposals shall be submitted via courier to the aforementioned government representative(s).

Offerors shall fill in their proposed prices and delivery dates in Part I Section B of the Solicitation.

Offerors shall fill in the Inspection and Acceptance clause, as well as the F.O.B Origin clause in Part I Section E of the solicitation.

Offerors shall fill in their representations, certifications, and other statements as in Part IV Section K of the solicitation.

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION M

EVALUATION FACTORS FOR AWARD

SECTION M

EVALUATION FACTORS FOR AWARD

INTRODUCTION:

This acquisition will utilize Lowest Priced procedures restricted to technically qualified “Approved Source” offeror(s) identified as such by being listed as an approved source on the Contract Screening Analysis Worksheet (762).

The government intends to award the requirement(s) represented in this solicitation to one awardee. However, the Government reserves the right to award no contract at all.

EVALUATION FACTORS AND PROCEEDURES:

The government shall evaluate proposals based on the evaluation factor below:

Factor 1- Price

The Offeror’s price will be evaluated based upon the Total Evaluated Price (TEP). The Offeror’s Price Proposal will be evaluated for the criteria of Price Reasonableness and Balance.

Price Reasonableness: The proposed prices will be evaluated for Price Reasonableness. For a price to be reasonable, it will represent a price to the Government that a prudent person would pay when consideration is given to prices in the market. Normally, price reasonableness is established through adequate price competition, but may also be determined through cost and price analysis techniques as described in FAR 15.404. For additional information see

FAR 31.201-3.

Balance: The Government may also determine a proposal unacceptable should the proposed prices be unbalanced. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more items/Contract Line Item Numbers (CLINs) is significantly overstated or understated as indicated by the application of price analysis techniques as those defined by FAR 15.404-1.

Total Evaluated Price (TEP): A TEP will be calculated to be used for evaluation of offers to determine the lowest priced proposal. The TEP calculation will be a summation of all Contract Line Item Pricing.

Solicitation Requirements, Terms and Conditions: In addition to meeting the identified factor above, Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and required delivery schedules.

Furthermore, all Offeror’s shall be listed as an approved source in the Government’s Screening Analysis Worksheet Form 761 or 762 prior to contract award.

A qualification package request is attached to this solicitation for those contractors who are not already qualified; however, per FAR 9.202(e), the government reserves the right not to delay contract award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards.

The process for the evaluation of proposals is as follows:

This award will be made to the offeror that submitted the proposal with the lowest Total Evaluated Price and is a qualified source. In the rare instance where the two lowest-priced proposals from qualified sources are the same, the PCO may enter into discussions to provide both offerors an opportunity to supply a best and final offer.

Past performance record and history will be assessed as one of the multiple standards required for a successful offeror to be determined responsible as described in FAR 9.104. Contractors shall meet the required delivery dates, as well as the terms and conditions in this solicitation, to be determined responsible.

File details come from the government source that posted it. Updated .