AFMC IMT 260, First Article Requirements

View the file

Other files for this federal contract opportunity

Other files attached to INDICATOR ASSEMBLY, newest first.
File Type Posted
SPRTA119R0101_______0001.pdf PDF
2625997_TRNSPDATA_REPORT.pdf PDF
DID_80603A.pdf PDF
R1188_EN.pdf PDF
2599232_CDRL1_REPORT.pdf PDF
2625996_PKGRQMT_REPORT.pdf PDF
DID_81307A.pdf PDF
SPRTA119R0101.pdf PDF
DID_80639D_ECP.pdf PDF
2283777_UIIEC_REPORT.pdf PDF
2241120_EDL_REPORT.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

04 AUG 2017(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

98571 / R1188

4. NSN

6340008615282RK

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 3 UNIT(S) OF LOT / ITEM 0001

AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

X WILL WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

X REQUIRED NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A.

X

CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

T.O. 8D15-11-4-3 TECHNICAL MANUAL OVERHAUL WITH PARTS BREAKDOWN TRIP SIGNAL INDICATOR PART NO. R1188 and Boeing (CAGE 81205) spec D10-20192.

B. The detailed technical requirements for First Article approval tests are contained in

T.O. 8D15-11-4-3 paragraph 8 and 9 outline full functional testing. Subassemblies will be removed and run in functional indicator assemblies (as part of government testing). Contractor to test IAW T.O. and also D10-20192 paragraph 44.02. If necessary to qualify new design elements in proposal or engineering change, qualification testing per D10-20192 paragraph 44.03 and 44.04 could be required if specified in contract.

tesing also to be accomplished (Cite Spec and Para number)

C. X TEST PLAN REQUIRED

Number of days for government approval / disapproval 60 days.

D. Contractor's notification to ACO and

(Requesting Activity) of test time and location due days prior to start of testing.

E. X TEST REPORT REQUIRED

(1) Forwarded to

422 SCMS/GUEAB

3001 Staff Drive STE 1AB193A

Tinker AFB OK 73145

(2) Government written notice of approval / disapproval due 45 days after receipt of contractor's report.

F. FIRST ARTICLE DELIVERY

(1) Due within 180 calendar days from date contract.

(2) Notify 60 calendar days prior to shipment.

(3) Delivered to government at

AFLCMC/LZPED

ATTN: FA Monitor DoDAAC FA8111

3001 Staff Drive, Suite 1AB85A

Tinker AFB, OK 73145-3041

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 60 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$1,500.0000

Page 1 of 2AFMC IMT 260, 20020830, V-3 Version 2Generated by PRPS using Jasper Reports on 02 Nov 2018

FIRST ARTICLE REQUIREMENTS 1. DATE

04 AUG 2017(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

10. DISPOSITION OF FIRST ARTICLES

X Approved First Articles will be forwarded to supply

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles

X will be returned to the contractor will be retained by pending disposition instructions from the contractor.

On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.

b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.

c. Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. Provided not more than months have elapsed since completion of the contract.

e. X First Article testing will not be waived.

f. See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

12. REMARKS

Hendry, Brian JNAME: 15 MAY 2017DATE:

First Article test report due 30 days after test.

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST

(Name, Organization, Phone)

Hendry, Brian J

422 SCMS / GU E A

405-582-5345

852-5345

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

Hendry, Brian J

422 SCMS / GU E A

405-582-5345

852-5345

Page 2 of 2AFMC IMT 260, 20020830, V-3 Version 2Generated by PRPS using Jasper Reports on 02 Nov 2018

File details come from the government source that posted it.