1500994_CDRL1_REPORT.pdf

PDF 9 KB Posted

Attached to
Engines, Turbines, and Components Federal contract opportunity
Solicitation number
SPRTA1-15-R-0103
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

First Article 1

View the file

Other files for this federal contract opportunity

Other files attached to Engines, Turbines, and Components, newest first.
File Type Posted
SPRTA115R0103_1501015_ATTACH.pdf PDF
SPRTA115R0103_1501014_ATTACH.pdf PDF
SPRTA115R0103_885338_QUALRQMT.pdf PDF
SPRTA115R0103_1499929_TRNSPDATA_REPORT.pdf PDF
SPRTA115R0103_1499948_ATTACH.doc DOC document
SPRTA115R0103.RTF RTF text file
SPRTA115R0103_1501013_ATTACH.pdf PDF
SPRTA115R0103_536346_FA_REPORT.pdf PDF
SPRTA115R0103_1500994_CDRL1_REPORT.pdf PDF
1501013_ATTACH.pdf PDF
1499929_TRNSPDATA_REPORT.pdf PDF
885338_QUALRQMT.pdf PDF
1499948_ATTACH.doc DOC document
1501014_ATTACH.pdf PDF
1501015_ATTACH.pdf PDF
536346_FA_REPORT.pdf PDF
SPRTA115R0103.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of11 2

FD20301500558F100-229 / P/N 4074229-01

A001

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

First Article Qualification Test Plan and Procedures NSN: 2840-01-325-8744NZ NOUN: Synchronizing Ring

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-NDTI-81307A N/A AFLCMC/LPSAA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

SD

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

See Block 16

N/A

1 XTIME

a. Addressee:

b. Copies:

Final

Draft Reg Repro See Block 16

G. Prepared By: H. Date I. Approved By: J. Date:

AFLCMC/EZGED

3001 Staff Dr, Ste 1AB 85A Tinker AFB, OK 73145-3041 Attn: FA Monitor

0 2 0

15. Total: 0 2 0

16. Remarks:

NAME: Zilar, Dale N DATE: 07 AUG 2014

Contractor must provide a plan to ensure that all drawing requirements are met on each first article.

The plan should include the equipment and facilities utilized to verify all drawing requirements. As a minimum, the following information is required.

a. A list of all drawing dimension, tolerances and the equipment utilized to verify each dimension.

An actual drawing should be submitted to correlate with the dimension list.

b. A plan to verify that all non-destructive inspections are met.

c. A plan to verify that all visual inspection requirements are met.

d. A plan to verify material properties to include mechanical properties, metallurgical properties and chemical compositions.

e. A plan to verify that all significant manufacturing processes are performed by sources that are currently approved/certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA).

f. A plan to verify that all forging or casting sources are currently approved/certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA) if applicable. Guidelines for first article test plans are contained within LPF-QAR-003, attached.

A government representative must coordinate on the first article test plan. The first article test plan shall be received 30 calendar days from the date of contract.

Contractor will include any QAR findings relative to the test report with the final test report submitted to AFLCMC/EZGED.

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

23 DEC 2014 //DIGITALLY SIGNED//

COORDINATORS:

AFLCMC / LPSEA1

SHELLEY.ERIC.CLEVELAND.1249361280

405-734-8789 / 884-8789

23 DEC 2014

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of21 2

FD20301500558F100-229 / P/N 4074229-01

A002

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

Test/Inspection Report NSN: 2840-01-325-8744NZ NOUN: Synchronizing Ring

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-NDTI-80809B/T N/A AFLCMC/LPSAA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

SD

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

SEE BLOCK 16

N/A

1 XTIME

a. Addressee:

b. Copies:

Final

Draft Reg Repro See Block 16

G. Prepared By: H. Date I. Approved By: J. Date:

AFLCMC/EZGED

3001 Staff Dr, Ste 1AB 85A Tinker AFB, OK 73145-3041 Attn: FA Monitor

0 2 0

15. Total: 0 2 0

16. Remarks:

NAME: Zilar, Dale N DATE: 20 AUG 2014

The first article test report shall satisfy all requirements in the first article test plan. All drawing requirements must be satisfied including dimensions, visual inspections, non-destructive inspections (NDIs), manufacturing processes and material requirements. The test report shall indicate that any sources used to perform significant manufacturing processes are approved/certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA).

A copy of the part process sheets shall be provided also. A government representative must coordinate on the test report. Guidelines for the test reports are contained within LPF-QAR-003, attached.

The first article test reports shall be received at OC-ALC/ENRS 120 calendar days from the date of government approval of test plan.

Contractor will include any QAR findings relative to the test report with the final test report submitted to AFLCMC/EZGED.

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

23 DEC 2014 //DIGITALLY SIGNED//

COORDINATORS:

AFLCMC / LPSEA1

SHELLEY.ERIC.CLEVELAND.1249361280

405-734-8789 / 884-8789

23 DEC 2014

File details come from the government source that posted it. Updated .