About this file
amendment for Cable assemblies, SPEC
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_SPRRA2-20-Q-0016.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
0001 2019OCT28
SPRRA2
DEFENSE LOGISTICS AGENCY
5201 MARTIN ROAD/DLA-AVN-AH
REDSTONE ARSENAL AL 35898-7340
CHARLES D. IVY
EMAIL: CHARLES.D.IVY@US.ARMY.MIL
SPRRA2-20-Q-0016
2019OCT23
X
X
/SIGNED/
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 11
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: CHARLES D. IVY
Buyer Office Symbol/Telephone Number: DLA-AVN-AHCB/(256)924-7929
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Weapon System: Patriot
*** End of Narrative A0000 ***
A-1. THIS REQUIREMENT IS FOR LIMITED SOURCE TO LOCKHEED MARTIN, CAGE 64059 IAW 10 U.S.C. 2304 (c)(1) FAR 6.302-1 (a)(2) A LIMITED
NUMBER OF RESPONSIBLE SOURCES, AND NO OTHER TYPE OF SUPPLIES OR SERVICES WILL SATISFY AGENCY REQUIREMENTS, FULL AND OPEN COMPETITION.
A-2. THIS REQUIREMENT IS IN SUPPORT OF THE M-D6 PATRIOT WEAPON SYSTEM.
A-3. FLIGHT SAFETY/CRITICAL SAFETY ITEM (CSI) IS NOT REQUIRED. ______
A-4. PRODUCTION LOT TESTING (PLT) IS REQUIRED.
a. PRODUCTION LOT TEST-GOVERNMENT FACILITY
b. QUANTITY: ALL (15) EACH
c. TEST DAYS: 50
d. GOVERNMENT REVIEW DAYS: 10
A-5. FIRST ARTICLE (FAT) IS NOT REQUIRED. ______
A-6. SERIAL NUMBERS ARE NOT REQUIRED. _______
A-7. SNRR MARKINGS ARE NOT REQUIRED. _______
A-8. TAMMS-A MARKINGS ARE NOT REQUIRED. _______
A-9. IUID MARKINGS ARE NOT REQUIRED. _______
A.10. RFID MARKINGS ARE NOT REQUIRED. _______
A-11. ARMS EXPORT CONTROL IS APPLICABLE. WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT
CONTROL ACT (TITLE 22, U.S.C., SEC 2751 ET SEQ.) OR EXECUTIVE ORDER 12470. VIOLATION OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL
PENALTIES.
A-12. FIT CHECK IS NOT REQUIRED. ______
A-13. CONTRACTOR POINT OF CONTACT INFORMATION:
NAME: ___________________________________________
TELEPHONE NUMBER: _______________________________
E-MAIL ADDRESS: _________________________________
A-14. DCMA ACO POINT OF CONTACT INFORMATION: TBD
NAME: ___________________________________________
TELEPHONE NUMBER: _______________________________
E-MAIL ADDRESS: _________________________________
A-15. No Technical Data Packages will be mailed out. Interested contractors must be registered in www.fbo.gov and Joint Certification
Program (JCP) certified to obtain the technical data package for this requirement.
A-16. OFFERS SHALL BE SUBMITTED IN ACCORDANCE WITH (IAW) FAR PART 15.208. FACSIMILE SUBMISSIONS ARE NOT AUTHORIZED. CONTRACTOR WILL ONLY
EMAIL OR MAIL OFFERS TO THE FOLLOWING:
2 11
SPRRA2-20-Q-0016
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
EMAIL: CHARLES.IVY@DLA.MIL
POSTAL ADDRESS:
Defense Logistics Agency/Aviation- Huntsville
5202 Martin Rd, Redstone Arsenal, AL 35898
A-17. FUNDS WILL BE OBLIGATED/CITED UPON ISSUANCE OF ORDER.
A-18. ACCELERATED DELIVERY IS ENCOURAGED AND AUTHORIZED AT NO ADDITIONAL COST TO THE GOVERNMENT.
A-19.PRODUCTION LOT TEST:
NUMBER OF SAMPLES TO BE TESTED: ALL (15) EACH
DELIVER FOB: DESTINATION
INSPECTION: ORIGIN
ACCEPTANCE: DESTINATION, DELIVERY DATE FOR PLT
SHIP TO: PR W0H9 US ARMY AVN & MISSILES CMD
REDSTONE TECHNICAL TEST CENTER
COTTONWOOD RD, BLDG 8022 MF 4500
REDSTONE ARSENAL, AL 35898-8502
MIL-STD 129 Markings Shall Appy.\~ Level of Preservation Military/ Level of Pkg. B
ALL MANUFACTURING LOTS WILL BE SUBJECTED TO TESTING
THE TEST ITEM(S) WILL NOT BE DESTROYED AS PART OF THE TESTING PROGRAM.
PRODUCTION LOT TEST TIME (PLT) IS FIFTY (50) DAYS AND GOVERNMENT REVIEW IS TEN (10) DAYS. UNITS TO BE TESTED IS ALL (15)EACH. PRODUCTION
LOT TEST SHALL BEGIN ON A MUTUALLY AGREED UPON DATE BETWEEN THE GOVERNMENT AND THE CONTRACTOR. THE DATE SHALL OCCUR WITH ENOUGH TIME IN
ADVANCE TO BEGIN SCHEDULED DELIVERIES (750 DACA) BASED ON PLT CALCULATION AND GOVERNMENT APPROVAL. THE CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER IN WRITING THIRTY (30) DAYS PRIOR TO THE PROPOSED DATE OF PLT DELIVERY. THE GOVERNMENT HAS FIFTEEN (10) DAYS TO
APPROVE/DISAPPROVE THE TEST REPORT.
A-21.Other Than Certified Cost and Pricing Data: ___________________________________________
NOTICE: YOUR ATTENTION IS INVITED TO FEDERAL ACQUISITION REGULATION (FAR) 15.403-3, RELATIVE TO THE REQUIREMENTS FOR OBTAINING OTHER
THAN CERTIFIED COST OR PRICING DATA.
A-22.FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED
FOR PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE
THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIREMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTORS RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF ACTION
AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT WRITTEN
DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN WHOLE OR IN
PART, AS APPROPRIATE.
*** END OF NARRATIVE A0001 ***
3 11
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
0001 CABLE ASSEMBLY,SPEC
NSN: 6150-01-531-5498
Mfr CAGE: 18876
Mfr Part Number: 13506038-8
0001AA PRODUCTION LOT TEST 30 EA $ $ ____________________ ______________ __________________
COMMODITY NAME: CABLE ASSEMBLY,SPEC
CLIN CONTRACT TYPE:
Firm Fixed Price
PRON: D19H0286D1 PRON AMD: 01
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
IAW MIL-STD 129 & MIL-STD 2073-1
LEVEL PRESERVATION: Military
LEVEL PACKING: B
ALL WOOD PACKAGING MATERIAL(WPM) MUST BE ISPM-15
COMPLIANT.
THE FOLLOWING MIL-STD-2073-1 CODES, APPENDIX J SHALL
APPLY
JI/A/MP [41]
JII/CD [1]
JIII/PM [00]
JIV/WM[00]
JV/CD [NA]
JVI/CT [A]
JVII/UC [EC] JVII/IC [00]
JIX/A/PK [F] JX/SM [00]
JVIIIA/OPI[M]
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES)
WT [9.5]
LN [14.0]
WD [14.0]
DP [14.0]
SUPPLEMENTAL INFORMATION: CONDUIT/CONNECTORS COTS
PURCHASE.COIL CAP/CUSHION ENDS
DELIVERIES SHALL BE DELIVERED WITHIN 390 DAYS AFTER
AWARD
(End of narrative D001)
4 11
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 W31G3H9243AF01 J 2
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 30 0390
FOB POINT: Destination
SHIP TO:
(W90BTD) SR HEADQUARTERS US ARMY AVIATION &
AMCOM FLEET MGT CENTER AFMC
HOLBROOK RD BLDG 738
FORT BLISS,TX,79916-5801
5 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DELIVERIES OR PERFORMANCE
Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________
1 CHANGED 52.211-8 TIME OF DELIVERY JUN/1997
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
6150-01-531-5498 15 390
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFERORS PROPOSED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the
Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the
Contractors date of receipt of the contract or notice of award by adding
(1) five calendar days for delivery of the award through the ordinary mails, or
(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of Clause)
6 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SPECIAL CONTRACT REQUIREMENTS
WOOD PACKING MATERIALS REQUIREMENTS___________________________________
A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).
B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures
(ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and outside of the United
States must meet ISPM 15 whenever WPM is used to ship DOD cargo.
(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement
Regulations (see http://www.alsc.org/ ).
(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.
D. Replacement Preservative for Pentachlorophenol
If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or 1.8 percent copper 8 quinolinolate.
(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.
(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The quality mark shall be placed on both ends of the outter packaging, between the end cleats or end battens: on two sides of the pallet.
Foreign manufacturers shall have the heat treatment of non-manufactured wood proces verified in accordance with their National Plant
Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
ELECTRONIC FABRICATION: REQUIREMENTS FOR ELECTRICAL AND ELECTRONIC ASSEMBLIES______________________________________________________________________________
1. Notwithstanding any other provision contained in any part of this contract to the contrary, the minimum requirements/standards for soldering electrical and electronic assemblies shall be the non-military joint industry standard, ANSI/J-STD-001, Class 3. The revision of ANSI/J-STD-001 in effect on the effective date of the contract shall govern the hardware produced hereunder. A copy of ANSI/J-STD-001 may be obtained from the Institute for Interconnecting and Packaging Electronic Circuits (IPC), 2215 Sanders Road, Northbrook, IL, 60062-
6135, telephone number (847) 509-9700, fax number (847) 509-9798.
2. The contractor shall establish and maintain an electronic/electrical parts control program and shall maintain and make available to the Government records and data which will provide visibility and traceability of all parts used in the production of the equipment under this contract. This selection of parts shall not be construed to relieve the contractor of meeting specified performance of the end item in which the part is used.
3. The Technical Data Package (TDP) shall serve as the baseline Program Parts Selection List (PPSL) and the parts and sources listed therein are the standard parts and sources. A Non Standard Part is defined as a part or source other than that cited in the PPSL. When the contractor desires to use a part or source other than those cited in the PPSL, the change must be approved by the Government via a
Request for Deviation (RFD) as defined elsewhere in this contract. Failure on the part of the contractor to submit such RFDs may result in the replacement of the nonstandard part with the standard part by the Government at the contractors expense for all affected items.
4. The contractor shall provide objective evidence such as form, fit, function, and interchangeability data that shows the proposed part complies with the requirements of applicable parts documentation. The RFD shall detail the technical justification for the use of the part and advantages of the nonstandard part, if any. Compare the nonstandard part to the standard part whose characteristics are nearest to those required for the application. Include, when applicable:
a. Part Number and Source
b. Size and weight data.
7 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
c. Electrical and mechanical characteristics
d. Reliability (with data if requested)
e. Availability of the standard part (delivery schedules, still available etc.)
f. Supplemental data such as existing control drawings, specifications, vendor data sheets, and other pertinent data. Data need not be furnished for nonstandard parts covered by documents listed in the Department of Defense Index of Specifications and Standards
(DoDISS) or Standardized Military Drawings (SMD).
5. The Contractor shall maintain a Lead Free Control Plan (LFCP) and make available to the Government upon request. The requirement for a Lead Free Control Plan shall be flowed down to suppliers of equipment that may include lead-free materials. The LFCP shall follow the guidelines set forth in GEIA-STD-0005-1, "Performance Standard for Aerospace and High Performance Electronic Systems Containing Lead-
Free Solder" or its equivalent. In addition, the LFCP shall also include tin whisker mitigation plans in accordance with GEIA-STD-0005-
2, "Standard for Mitigating the Effects of Tin Whiskers in Aerospace and High Performance Electronic Systems" or its equivalent, at control level 2C or equivalent. The Contractor should include in the LFCP any special design considerations, manufacturing process controls, test and qualification requirements, quality inspection and screening, marking and identification, maintenance and repair processes, and other steps taken to mitigate risk.
6. The Contractor shall prepare, or update existing, Counterfeit Risk Management Plan and make available to the Government upon request. The Plan shall meet the requirements of SAE AS5553 for electronic items. The Contractor shall procure parts from original manufacturers or the original manufacturers franchised distributors. Contractors shall report counterfeits and suspected counterfeits to the Government and in the Government Industry Data Exchange Program (GIDEP), in accordance with the GIDEP Operations Manual, SO300-BT-
PRO- 010.
PRODUCTION LOT TEST - GOVERNMENT TESTED_______________________________________
(a) The Contractor shall deliver -1- units of Lot/Item -2- within -3- calendar days from the date of this contract to the Government at
(W31P0W) PR W0H9 US ARMY AVIATION AND MISSILE COMMAND, REDSTONE TECHNICAL TEST CENTER, COTTONWOOD ROAD BLDG 8022 MF4500, REDSTONE
ARSENAL, AL 35898-8052 for Production Lot Test (PLT). If the quantity required for PLT is less than the actual production quantity, the sample(s) to be shipped shall be selected at random during manufacture by the DCMA QAR. The shipping documentation shall contain this contract number and the Lot/Item identification. Copies of all available in-process documentation to include copies of Instruction
Letters, Inspection Sheets/records, Material Test Results, and Certificates of Compliance shall be included with the sample(s) shipment.
(b) PLT sample(s) must meet all the requirements of the Technical Data Package (TDP) and all other contractual requirements. If the entire lot is required for testing, delivery of the total quantity required herein shall be accomplished in no more than two (2) shipments. Delivery in one (1) shipment is desirable; however, when two (2) shipments are necessary, fifty percent (50%) or more of the total quantity shall be included in the first shipment, and the remaining quantity shall be included in the second shipment.
(c) The Contracting Officer will notify the Contractor, in writing, of the acceptance or rejection of the Production Lot Test sample(s). The notice of acceptance shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of rejection shall cite reasons for the rejection.
(d) If the PLT sample(s) is/are rejected, the Government may choose to have the contractor remedy the non-conformances found on the product by rework when appropriate, or require the contractor to provide newly manufactured product for inspection. The Contractor, upon
Government request, shall make any necessary changes to meet the requirements of this contract. The Contractor shall furnish any reworked or newly manufactured PLT sample(s) to the Government as appropriate, under the terms and conditions and within the time specified by the Government. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule and/or for any additional costs to the Government related to these inspection retests.
(e) The Government reserves the right to reject any lot in which one or more defective units of production are found. The Government, at its discretion, may elect to perform a 100 percent screen on a lot and accept only those items that are conforming to all contract requirements. Under no circumstances shall the Government accept or be obligated to accept known defective hardware as a part of any lot.
REVISIONS TO DRAWINGS/PART NUMBERS__________________________________
(a) Sources in receipt of this solicitation are requested, at no cost to the Government, to immediately notify the Contracting Officer if they are aware of any change(s)/revision(s) to the drawing(s) or part number(s) in this solicitation which have been approved by the Government for implementation. Notification of part number changes shall be supported by data which indicates the type of change, approving authority as required by ANSI EIA 649 MIL-STD-973 and date and method of submittal of provisioning documentation and drawings.
If complete data package has not been previously provided, the contractor shall, at no direct cost to the Government, immediately submit applicable drawings, along with a copy of the approval change authority, to the Contracting Officer, at the office symbol and mailing address listed in the "ISSUED BY" block on page one (1) of this document. The minimum acceptable data includes the next higher assembly and the item of Supply Detail Drawings which will allow provisioning, National Stock Number assignment and updating of
AMCOM's data records.
8 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(b) The contractor hereby verifies previous contractual submission of technical data:
Contract No.: _____________________________________________________
Contractor: _______________________________________________________
Explanation of Data Rights: __________________________________________
(c) The Government is not by this request soliciting, nor is the Government liable for cost incurred by the offeror in preparing or developing modifications, deviations, waivers, or other changes to drawings or part number(s). Furthermore, this request does not authorize changes to the drawing(s) or part number(s) for this acquisition, another contract, or for any other purpose. Offerors performing any contract awarded as a result of this solicitation must comply with the drawing(s) and specifications as set forth herein, unless this solicitation is amended or any resulting contract is modified by the Contracting Officer.
(d) All proposed part number changes shall be submitted pursuant to the requirements of the clause entitled, "Engineering Change
Proposal (ECP), Value Engineering Change Proposal (VECP), Request for Deviation (RFD), and Request for Waiver (RFW) (USAAMCOM).
ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR DEVIATION, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, &__________________________________________________________________________________________________________________________________
SPECIFICATION CHG NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS________________________________________________________________
1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), Request for Deviations
(RFDs), and Request for Variance (RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.
2. Format.
a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.
b. Long Form Procedure: Class I changes to the CI require that RDMR Form 523, pages 1 through 7 (as applicable), be prepared. Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.
c. Short Form Procedure: ECPs and VECPs , which meet the requirements of Class II ECPs, shall be prepared using RDMR Form 523 (page
1 only). Supplemental pages may be used with the form as necessary. The responsible Contract Management Office (CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Justification Codes", and Block 7 "Priority."
d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFD. RFDs shall be prepared using RDMR Form 527 or RDMR Form 530 (Type I, see block 5 of the form.)
e. The Contractor shall not submit items for acceptance by the Government that include a known departure from the requirements, unless the Government has approved a RFV. RFVs shall be prepared using RDMR Form 528.
f. Each ECP, RFD or RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract
Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFD/RFV proposal.
g. Classification of RFDs/RFVs.
(1) Major RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as major when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health; performance; interchangeability; reliability;
survivability; maintainability; effective use or operation; weight; appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.
(2) Critical RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as critical when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.
(3) Minor RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as minor when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs g(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.
9 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
h. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.
i. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.
j. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.
k. Times allowed for technical decisions for ECP and RFD/RFV proposals will be worked out via mutual agreement between the Contractor and the Government.
l. The Contractor shall submit, concurrent with the ECP, a separate AMSAM-RD Form 525, "Specification Change Notice" (SCN), for each specification that would require revision if the ECP were approved.
m. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.
n. The Contractor shall utilize RDMR Form 526, "Engineering Release Record" (ERR) to release new or revised configuration documentation to the Government for approval.
o. The Contractor shall utilize RDMR Form 524, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub- sections entitled
"WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.
3. Submittal. The Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer
(ACO). One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the Contractor concerning ECPs, VECPs, RFVs or RFDs will be submitted to the PCO for resolution. Submittals may be made by electronic means by scanning the appropriate completed forms into a computer or preparing the forms electronically.
4. Distribution.
a. Electronic Distribution. The preferred method of distribution is through the Internet E-mail System to the PCO. Microsoft Word is required for use with the transmittal letter (E-mail). Required forms will be attached to the E-mail. All forms may be obtained from the Army Contracting Command - Redstone Website https://www.amrdec.army.mil/amrdec/rdmr-se/tdmd/ConfigMgt.htm by clicking on
"Forms/Checksheets." The forms are in both "Adobe Acrobat" and "Form Flow" formats. In order to access and use the forms, the user must have the "Adobe Acrobat" or "Form Flow" software installed on their computer. Drawings may be scanned into the computer and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO. Contractors who do not have access to the Army Contracting Command - Redstone website will need to contact the PCO, the appropriate Project Office Configuration Management Office, or the Technical Data Management Division (RDMR-SET) to have the forms sent to their facility.
b. Hard Copy Distribution of Class I or II ECPs and RFD/RFVs, For each Class I or II ECP, or each RFD/RFV that the ACO determines to be in compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO.
Upon receipt of any type of change proposal that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation pertaining to the proposed engineering change action to the PCO. Assistance in preparing any of these proposals may be obtained from the ACO or AMCOM Change Control Point at:
Aviation and Missile Research, Development, and Engineering Center
ATTN: RDMR-SET
Redstone Arsenal, Al 35898-5000
Telephone: 256-876-1335
c. Hard Copy Distribution of VECPs. For each VECP that the ACO determines to be in compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any VECP that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation to the PCO. The Contractor shall also submit one copy of the VECP to the
Value Engineering Program Manager (VEPM) whose address is below. Assistance in preparing VECPs may be obtained from the VEPM.
Aviation and Missile Research, Development, and Engineering Center
ATTN: RDMR-SEI
Redstone Arsenal, Al 35898-5000
Telephone: 256-876-8163
5. Alternate Format, Submittal or Distribution Process. Proposals may be prepared in a different format, submitted using a different submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate
10 11
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
approach is in accordance with a Government approved configuration management plan governed by this contract or the PCO authorizes the alternate format, submittal, or distribution process.
6. Government Acceptance. Acceptance of a proposal by the Government shall be affected by the issuance of a change order or execution of a supplemental agreement incorporating the proposal into the contract unless the PCO authorizes another method of acceptance. The
Government will notify the Contractor in writing if a proposal is determined to be unacceptable.
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (GOVERNMENT SPECIFICATION)____________________________________________________________________
The contractor shall comply with the higher-level quality standard titled Quality systems -- Model for quality assurance and design, development, production, installation and servicing, American National Standards Institute/American Society for Quality Control
(ANSI/ASQC), International Organization for Standardization (ISO) Q9001:2000, SAE AS9100, or a Department of Defense approved quality system Single Process Initiative (SPI). Contractor must identify below the title, number (if any), date, and tailoring (if any) of the specific system(s) that will be used to satisfy this requirement.
TITLE NUMBER DATE TAILORED
POINT OF PRESERVATION, PACKAGING, PACKING AND MARKING OF SUPPLIES_________________________________________________________________
Preservation, packaging, packing and marking of supplies will be performed at the following location: (If other than the location set forth in block 13 page 1 of this purchase order):
BAR CODE MARKINGS_________________
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -
Automatic Identification and Data Capture Techniques - Bar Code Symbology
Specification - Code 39.
*** END OF NARRATIVE H0001 ***
11 11
| SUPPLEMENTAL INFORMATION |
| SUPPLIES OR SERVICES AND PRICES/COSTS |
| DELIVERIES OR PERFORMANCE |
| SPECIAL CONTRACT REQUIREMENTS |
File details come from the government source that posted it.