SPRRA122D0037.pdf
PDF 110 KB Posted
- Attached to
- HOUSING ASSY, TRANSM Federal contract opportunity
- Solicitation number
- SPRRA1-22-R-0031
- Issued by
- Defense Logistics Agency Aviation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRRA122D0037SPRRA122F0244.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
Offeror To Complete Block 12, 17, 23, 24, & 30
1. Requisition Number Page Of
2. Contract No. 3. Award/Effective Date 4. Order Number 5. Solicitation Number 6. Solicitation Issue Date
7. For Solicitation Information Call:
A. Name B. Telephone Number (No Collect Calls) 8. Offer Due Date/Local Time
9. Issued By Code 10. This Acquisition is Unrestricted OR Set Aside: % For:
Small Business Women-Owned Small Business (WOSB) Eligible Under the Women-Owned Small Business Program
Hubzone Small Business EDWOSB
Service-Disabled Veteran-Owned Small Business NAICS:
Email: 8(A) Size Standard:
11. Delivery For FOB Destination Unless Block Is Marked
12. Discount Terms 13a. This Contract Is A Rated Order Under DPAS (15 CFR 700) 13b. Rating
See Schedule 14. Method Of Solicitation RFQ IFB RFP
15. Deliver To Code 16. Administered By Code
Telephone No.
17a. Contractor/Offeror Code Facility 18a. Payment Will Be Made By Code
Telephone No.
17b. Check If Remittance Is Different And Put Such Address In Offer
18b. Submit Invoices To Address Shown In Block 18a Unless Block Below Is Checked See Addendum
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
(Use Reverse and/or Attach Additional Sheets As Necessary)
25. Accounting And Appropriation Data 26. Total Award Amount (For Govt. Use Only)
27a.Solicitation Incorporates By Reference FAR 52.212-1, 52.212-4. FAR 52.212-3 And 52.212-5 Are Attached. Addenda Are Are Not Attached.
27b.Contract/Purchase Order Incorporates By Reference FAR 52.212-4. FAR 52.212-5 Is Attached. Addenda Are Are Not Attached.
28. Contractor Is Required To Sign This Document And Return _________ 29. Award Of Contract: Ref. Offer Copies to Issuing Office. Contractor Agrees To Furnish And Deliver All Items Set Forth Or Otherwise Identified Above And On Any Additional Sheets Subject To The Terms And Conditions Specified.
Dated . Your Offer On Solicitation (Block 5), Including Any Additions Or Changes Which Are Set Forth Herein, Is Accepted As To Items:
30a. Signature Of Offeror/Contractor 31a. United States Of America (Signature Of Contracting Officer)
30b. Name And Title Of Signer (Type Or Print) 30c. Date Signed 31b. Name Of Contracting Officer (Type Or Print) 31c. Date Signed
Authorized For Local Reproduction Previous Edition Is Not Usable
Standard Form 1449 (Rev. 2/2012) Prescribed By GSA-FAR (48 CFR) 53.212
SEE SCHEDULE
SPRRA1-22-D-0037 2022SEP29
KIMBERLEY J. COLLIER (256)842-7556
KIMBERLEY.COLLIER@DLA.MIL
SPRRA1
DEFENSE LOGISTICS AGENCY
5201 MARTIN ROAD/DLA-AVN-AH
REDSTONE ARSENAL AL 35898-7340
336412
X
X DOA1
X
SEE SCHEDULE
S1403A
DCMA CHICAGO
1523 WEST CENTRAL ROAD
BLDG 203
ARLINGTON HEIGHTS IL 60005-2451
1Y249
AAR SUPPLY CHAIN, INC.
1100 N WOOD DALE RD
WOOD DALE, IL 60191-1060
HQ0339
DFAS - COLUMBUS CENTER
WEST ENTITLEMENT OPERATIONS
P O BOX 182317
COLUMBUS OH 43218-2317
SEE SCHEDULE
$0.00
X X
X 2
/SIGNED/
IMELDA CHAGOLLA
IMELDA.CHAGOLLA@DLA.MIL (256)690-5419 2022SEP29
1 42
19.
Item No.
20.
Schedule Of Supplies/Services
21.
Quantity
22.
Unit
23.
Unit Price
24.
Amount
32a. Quantity In Column 21 Has Been
Received Inspected Accepted, And Conforms To The Contract, Except As Noted: _________________________________________________
32b. Signature Of Authorized Government Representative 32c. Date 32d. Printed Name and Title of Authorized Government Representative
32e. Mailing Address of Authorized Government Representative 32f. Telephone Number of Authorized Government Representative
32g. E-Mail of Authorized Government Representative
33. Ship Number 34. Voucher Number 35. Amount Verified 36. Payment 37. Check Number Correct For Partial Final Complete Partial Final
38. S/R Account No. 39. S/R Voucher Number 40. Paid By
41a. I Certify This Account Is Correct And Proper For Payment 42a. Received By (Print) 41b. Signature And Title Of Certifying Officer 41c. Date 42b. Received At (Location)
42c. Date Rec’d (YY/MM/DD) 42d. Total Containers
Standard Form 1449 (Rev. 2/2012) Back
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SUPPLEMENTAL INFORMATION
Buyer Name: KIMBERLEY J. COLLIER
Buyer Office Symbol/Telephone Number: ZDB-B (AVN DIV)/(256)842-7556
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
Type of Business: Large Business Performing in U.S.
Surveillance Criticality Designator: B
Contract Expiration Date: 2027SEP30
*** End of Narrative A0000 ***
A-1. THIS REQUIREMENT IS RESTRICTED TO AAR SUPPLY CHAIN, CAGE 1Y249, IAW 10 U.S.C. 2304 (c )(1) FAR 6.302-1. ONLY ONE RESPONSIBLE
SOURCE AND NO OTHER SUPPLIES OR SERVICES WILL SATISFY AGENCY REQUIREMENTS.
A-2. THIS REQUIREMENT IS IN SUPPORT OF THE CH-47 BL WEAPON SYSTEM.
A-3. THIS IS A FIVE-YEAR REQUIREMENTS TYPE, FIRM FIXED PRICE EFFORT.
A-4. FIT CHECK IS NOT REQUIRED. ___
A-5. ARMS EXPORT CONTROL NOT APPLICABLE. ___
A-6. FIRST ARTICLE TEST NOT REQUIRED. ___
A-7. PRODUCTION LOT TESTING IS NOT REQUIRED. ___
A-8. THIS IS NOT A FLIGHT SAFETY/CRITICAL SAFETY PART. ___
A-9. SNRR AND TAMMS-A ARE NOT REQUIRED. ___
A-10. SERIAL NUMBERING ARE NOT REQUIRED. ___
A-11. RFID MARKINGS ARE NOT REQUIRED. ___
A-12. IUID MARKINGS ARE NOT REQUIRED. ___
A-13. CONTRACTOR POINT OF CONTACT INFORMATION:
NAME: OLIVIA BROWN ____________
TELEPHONE NUMBER: (630) 227-2473
E-MAIL ADDRESS: olivia.brown@aarcorp.com ________________________
A-14. DCMA ACO POINT OF CONTACT INFORMATION:
NAME: BEVERLY VIADS _____________
TELEPHONE NUMBER: (224) 625-9414 ______________
E-MAIL ADDRESS: beverly.s.viads.civ@mail.mil ____________________________
A-15. CONTRACT SPECIALIST POINT OF CONTACT INFORMATION:
NAME: KIMBERLEY COLLIER _________________
OFFICE SYMBOL: DLA-AVN-AHC ___________
TELEPHONE NUMBER: (256) 842-7556 ______________
E-MAIL ADDRESS: kimberley.collier@dla.mil __________________________
A-16. FUNDS WILL BE OBLIGATED/CITED UPON ISSUANCE OF EACH DELIVERY ORDER.
A-17. ACCELERATED DELIVERY IS ENCOURAGED AND AUTHORIZED AT NO ADDITIONAL COST TO THE GOVERNMENT.
A-18. FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED
FOR PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE ORDER, CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES AWARE
THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIREMENTS OF THE CONTRACT, THE CONTRACTOR SHALL NOTIFY THE
CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTORS RECOMMENDATION FOR CORRECTION OF THE PROBLEM, IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE OF ACTION
2 42
SPRRA1-22-D-0037
AAR SUPPLY CHAIN, INC.
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION WITHOUT WRITTEN
DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE TERMINATED IN WHOLE OR IN
PART, AS APPROPRIATE.
A-19. PLEASE SUBMIT ALL POSTAWARD INQUIRIES, AND QUESTIONS TO:
DLA HSV POST AWARD TEAM
7408 WAREHOUSE ROAD
REDSTONE ARSENAL, AL 35898
DLAHSVPOSTAWARDTEAM@DLA.MIL
*** END OF NARRATIVE A0001 ***
3 42
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SUPPLIES OR SERVICES AND PRICES/COSTS
1001 HOUSING ASSY, TRANSM
NSN: 3010-01-125-0798
Mfr CAGE: 55820
Mfr Part Number: 160192-200
THIS IS A FIVE YEAR REQUIREMENTS TYPE CONTRACT. ____
FUNDS WILL BE OBLIGATED/CITED UPON THE ISSUANCE OF
EACH DELIVERY ORDER. THE ESTIMATED QUANTITIES
HEREIN ARE NOT A REPRESENTATION TO AN OFFEROR OR
CONTRACTOR THAT THE ESTIMATED QUANTITY WILL BE
REQUIRED OR ORDERED, OR THAT CONDITIONS AFFECTING
REQUIREMENTS WILL BE STABLE OR NORMAL.
THE GOVERNMENT WILL ONLY BE OBLIGATED TO ORDER THE
STATED GUARANTEED MINIMUM QUANTITY OF 25 EACH.
THE GOVERNMENT IS NOT OBLIGATED TO ISSUE ANY
ORDERS AGAINST THIS CONTRACT OVER THE GUARANTEED
CONTRACT MINIMUM AMOUNT; HOWEVER, THE GOVERNMENT
RESERVES THE RIGHT TO ORDER ANY QUANTITY ABOVE THE
GUARANTEED CONTACT MINIMUM QUANTITY FOR THE
DURATION OF THIS CONTRACT.
THE GOVERNMENT HAS SEGREGATED THE ESTIMATED
QUANTITIES INTO FIVE, ONE-YEAR ORDERING PERIODS.
HOWEVER, THIS DOES NOT PREVENT THE GOVERNMENT FROM
EXERCISING ITS RIGHTS UNDER FAR 52.216-21 AT ANY
TIME DURING THE REQUIRMENT PERIOD.
THE GUARANTEED MINIMUM QUANTITY TO BE AWARDED
SIMULTANEOUSLY WITH THE AWARD OF THE BASIC CONTRACT
IS 25 EACH. THE MINIMUM DELIVERY ORDER QUANTITY IS ___
10 EACH. AT NO TIME WILL THE CONTRACTOR BE REQUIRED
TO SHIP MORE THAN 10 UNITS PER MONTH UNLESS ___
MUTUALLY AGREED TO BY BOTH PARTIES. DELIVERY ORDERS
ISSUED UNDER THIS CONTRACT SHALL NOT HAVE
OVERLAPPING DELIVERY SCHEDULES.
THE CONTRACT IS FOR THE SUPPLIES AS DETAILED ON THE
FOLLOWING PAGES. OFFERORS ARE CAUTIONED TO INSURE
THAT OFFERS ARE PROVIDED ON ALL QUANTITIES.
FAILURE TO PROPOSE ALL CLINS, MAY RESULT IN A
DETERMINATION OF NON RESPONSIVENESS. AN OFFER MAY
BE REJECTED IF THE GOVERMENT DETERMINES THAT THE
OFFER IS MATERIALLY UNBALANCED OR IF THE OFFER
CONTAINS UNBALANCED PRICING.
YEAR 1 WILL BE FROM DATE OF AWARD THROUGH DAY 365
DAYS AFTER CONTRACT AWARD (DACA).
YEAR 2 WILL BEGIN 366 DACA AND END 730 DACA.
YEAR 3 WILL BEGIN 731 DACA AND END 1,095 DACA.
YEAR 4 WILL BEGIN 1,096 DACA AND END 1,460 DACA.
YEAR 5 WILL BEGIN 1,461 DACA AND END 1,825 DACA.
4 42
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
THE ESTIMATED (E) QUANTITY LISTED HEREIN DOES NOT
COMMIT THE GOVERNMENT TO ORDER THAT OR ANY QUANTITY
ABOVE THE MINIMUM QUANTITY.
(End of narrative A001)
1001AA PRODUCTION QUANTITY ORDERING PERIOD ONE 25 (E) EA $ 9,508.07000 _______________________________________ ______________
PROGRAM YEAR: 1
COMMODITY NAME: HOUSING ASSY, TRANSM
CLIN CONTRACT TYPE:
Firm Fixed Price
PSC: 3010
IN THE EVENT AN ORDER IS ISSUED FOR QUANTITIES
OUTSIDE THE RANGES LISTED ABOVE, THE UNIT PRICE
ASSOCIATED WITH THE HIGHEST LISTED RANGE WILL BE
APPLIED TO THAT ORDER.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-124 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
ADDITIONAL PACKAGING REQUIREMENTS
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [1.0]
LN [3.0]
WD [3.0]
DP [3.0]
MIL-STD-2073-1 CODES, APPENDIX J
JI/A/MP [10] JII/CD [1] JIII/PM [00] JIV/WM [00]
JV/CD [NA] JVI/CT [A] JVII/UC [ED] JVII/IC [00]
JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]
5 42
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
FOB POINT: Origin
DELIVERIES SHALL COMMENCE 435 DAYS AFTER THE DATE
RECEIPT OF ORDER (DARO).
(End of narrative F001)
1002 HOUSING ASSY, TRANSM
NSN: 3010-01-125-0798
Mfr CAGE: 55820
Mfr Part Number: 160192-200
1002AA PRODUCTION QUANTITY ORDERING PERIOD TWO 20 (E) EA $ 9,983.47000 _______________________________________ ______________
PROGRAM YEAR: 2
COMMODITY NAME: HOUSING ASSY, TRANSM
CLIN CONTRACT TYPE:
Firm Fixed Price
PSC: 3010
IN THE EVENT AN ORDER IS ISSUED FOR QUANTITIES
OUTSIDE THE RANGES LISTED ABOVE, THE UNIT PRICE
ASSOCIATED WITH THE HIGHEST LISTED RANGE WILL BE
APPLIED TO THAT ORDER.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-124 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
ADDITIONAL PACKAGING REQUIREMENTS
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [1.0]
LN [3.0]
WD [3.0]
DP [3.0]
6 42
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
MIL-STD-2073-1 CODES, APPENDIX J
JI/A/MP [10] JII/CD [1] JIII/PM [00] JIV/WM [00]
JV/CD [NA] JVI/CT [A] JVII/UC [ED] JVII/IC [00]
JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
FOB POINT: Origin
DELIVERIES SHALL COMMENCE 435 DAYS AFTER THE DATE
RECEIPT OF ORDER (DARO).
(End of narrative F001)
1003 HOUSING ASSY, TRANSM
NSN: 3010-01-125-0798
Mfr CAGE: 55820
Mfr Part Number: 160192-200
1003AA PRODUCTION QUANTITY ORDERING PERIOD THREE 20 (E) EA $ 10,582.48000 _________________________________________ ______________
PROGRAM YEAR: 3
COMMODITY NAME: HOUSING ASSY, TRANSM
CLIN CONTRACT TYPE:
Firm Fixed Price
PSC: 3010
IN THE EVENT AN ORDER IS ISSUED FOR QUANTITIES
OUTSIDE THE RANGES LISTED ABOVE, THE UNIT PRICE
ASSOCIATED WITH THE HIGHEST LISTED RANGE WILL BE
APPLIED TO THAT ORDER.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-124 MARKINGS SHALL APPLY
7 42
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
ADDITIONAL PACKAGING REQUIREMENTS
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [1.0]
LN [3.0]
WD [3.0]
DP [3.0]
MIL-STD-2073-1 CODES, APPENDIX J
JI/A/MP [10] JII/CD [1] JIII/PM [00] JIV/WM [00]
JV/CD [NA] JVI/CT [A] JVII/UC [ED] JVII/IC [00]
JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
FOB POINT: Origin
DELIVERIES SHALL COMMENCE 435 DAYS AFTER THE DATE
RECEIPT OF ORDER (DARO).
(End of narrative F001)
1004 HOUSING ASSY, TRANSM
NSN: 3010-01-125-0798
Mfr CAGE: 55820
Mfr Part Number: 160192-200
1004AA PRODUCTION QUANTITY ORDERING PERIOD FOUR 20 (E) EA $ 11,111.60000 ________________________________________ ______________
PROGRAM YEAR: 4
COMMODITY NAME: HOUSING ASSY, TRANSM
CLIN CONTRACT TYPE:
Firm Fixed Price
PSC: 3010
8 42
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
IN THE EVENT AN ORDER IS ISSUED FOR QUANTITIES
OUTSIDE THE RANGES LISTED ABOVE, THE UNIT PRICE
ASSOCIATED WITH THE HIGHEST LISTED RANGE WILL BE
APPLIED TO THAT ORDER.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-124 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
ADDITIONAL PACKAGING REQUIREMENTS
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [1.0]
LN [3.0]
WD [3.0]
DP [3.0]
MIL-STD-2073-1 CODES, APPENDIX J
JI/A/MP [10] JII/CD [1] JIII/PM [00] JIV/WM [00]
JV/CD [NA] JVI/CT [A] JVII/UC [ED] JVII/IC [00]
JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
FOB POINT: Origin
DELIVERIES SHALL COMMENCE 435 DAYS AFTER THE DATE
RECEIPT OF ORDER (DARO).
(End of narrative F001)
1005 HOUSING ASSY, TRANSM
9 42
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
NSN: 3010-01-125-0798
Mfr CAGE: 55820
Mfr Part Number: 160192-200
1005AA PRODUCTION QUANTITY ORDERING PERIOD FIVE 20 (E) EA $ 11,667.18000 ________________________________________ ______________
PROGRAM YEAR: 5
COMMODITY NAME: HOUSING ASSY, TRANSM
CLIN CONTRACT TYPE:
Firm Fixed Price
PSC: 3010
IN THE EVENT AN ORDER IS ISSUED FOR QUANTITIES
OUTSIDE THE RANGES LISTED ABOVE, THE UNIT PRICE
ASSOCIATED WITH THE HIGHEST LISTED RANGE WILL BE
APPLIED TO THAT ORDER.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
MIL-STD-124 MARKINGS SHALL APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: B
ADDITIONAL PACKAGING REQUIREMENTS
ESTIMATED MAXIMUM UNIT PACKAGE WEIGHT (POUNDS) AND
SIZE (INCHES):
WT [1.0]
LN [3.0]
WD [3.0]
DP [3.0]
MIL-STD-2073-1 CODES, APPENDIX J
JI/A/MP [10] JII/CD [1] JIII/PM [00] JIV/WM [00]
JV/CD [NA] JVI/CT [A] JVII/UC [ED] JVII/IC [00]
JIX/A/PK [F] JX/SM [00] JVIIIA/OPI [M]
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
10 42
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
FOB POINT: Origin
DELIVERIES SHALL COMMENCE 435 DAYS AFTER THE DATE
RECEIPT OF ORDER (DARO).
(End of narrative F001)
11 42
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
INSPECTION AND ACCEPTANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.246-1 CONTRACTOR INSPECTION REQUIREMENTS APR/1984
2 52.246-15 CERTIFICATE OF CONFORMANCE APR/1984
3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
12 42
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DELIVERIES OR PERFORMANCE
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 52.211-17 DELIVERY OF EXCESS QUANTITIES SEP/1989
2 52.242-15 STOP-WORK ORDER AUG/1989
3 52.242-17 GOVERNMENT DELAY OF WORK APR/1984
4 52.247-29 F.O.B. ORIGIN FEB/2006
5 52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY FEB/2006
6 52.247-34 F.O.B. DESTINATION NOV/1991
7 52.247-48 F.O.B. DESTINATION--EVIDENCE OF SHIPMENT FEB/1999
8 52.247-52 CLEARANCE AND DOCUMENTATION REQUIREMENTS--SHIPMENTS TO DOD AIR OR FEB/2006
WATER TERMINAL TRANSSHIPMENT POINTS
9 52.247-55 F.O.B. POINT FOR DELIVERY OF GOVERNMENT-FURNISHED PROPERTY JUN/2003
10 52.247-58 LOADING, BLOCKING, AND BRACING OF FREIGHT CAR SHIPMENTS APR/1984
11 52.247-59 F.O.B. ORIGIN--CARLOAD AND TRUCKLOAD SHIPMENTS APR/1984
12 52.247-61 F.O.B.--ORIGIN--MINIMUM SIZE OF SHIPMENTS APR/1984
13 52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS JAN/1991
14 252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY MAR/2022
15 252.211-7008 USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS SEP/2010
16 52.211-8 TIME OF DELIVERY JUN/1997
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
1001AA 25(E) 390 DARO
1002AA 20(E) 390 DARO
1003AA 20(E) 390 DARO
1004AA 20(E) 390 DARO
1005AA 20(E) 390 DARO
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, will be considered nonresponsive and rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFERORS PROPOSED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS
AFTER DATE OF
CONTRACT
1001AA 25(E) 435 DARO
1002AA 20(E) 435 DARO
1003AA 20(E) 435 DARO
1004AA 20(E) 435 DARO
1005AA 20(E) 435 DARO
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the
Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the
Contractors date of receipt of the contract or notice of award by adding
13 42
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(1) five calendar days for delivery of the award through the ordinary mails, or
(2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term working day excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected.
(End of Clause)
17 52.247-60 GUARANTEED SHIPPING CHARACTERISTICS JAN/2017
(a) The offeror is requested to complete subparagraph (a)(1) of this clause, for each part or component which is packed or packaged separately. This information will be used to determine transportation costs for evaluation purposes. If the offeror does not furnish sufficient data in subparagraph (a)(1) of this clause, to permit determination by the Government of the item shipping costs, evaluation will be based on the shipping characteristics submitted by the offeror whose offer produces the highest transportation costs or in the absence thereof, by the Contracting Officers best estimate of the actual transportation costs. If the item shipping costs, based on the actual shipping characteristics, exceed the item shipping costs used for evaluation purposes, the Contractor agrees that the contract price shall be reduced by an amount equal to the difference between the transportation costs actually incurred, and the costs which would have been incurred if the evaluated shipping characteristics had been accurate.
(1) To be completed by the offeror:
(i) Type of container: Wood Box ___, Fiber Box ___, Barrel ___, Reel ___, Drum ___, Other (Specify) _________;
(ii) Shipping configuration: Knocked-down ___, Set-up ___, Nested ___, Other (specify) _____________;
(iii) Size of container: ____" (Length), x ___" (Width), x ___" (Height) = ___ Cubic Ft;
(iv) Number of items per container ________ each;
(v) Gross weight of container and contents ____ Lbs;
(vi) Palletized/skidded ___Yes ___ No;
(vii) Number of containers per pallet/skid ______;
(viii) Weight of empty pallet bottom/skid and sides _______ Lbs;
(ix) Size of pallet/skid and contents _______ Lbs Cube ________;
(x) Number of containers or pallets/skids per railcar __________ *
Size of railcar _____________
Type of railcar _____________
(xi) Number of containers or pallets/skids per trailer ________*
Size of trailer _________ Ft
Type of trailer _________
* Number of complete units (line item) to be shipped in carriers equipment.
(2) To be completed by the Government after evaluation but before contract award:
(i) Rate used in evaluation ________;
(ii) Tender/Tariff _______;
(iii) Item ________________.
(b) The guaranteed shipping characteristics requested in subparagraph (a)(1) of this clause do not establish actual transportation requirements, which are specified elsewhere in this solicitation. The guaranteed shipping characteristics will be used only for the
14 42
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
purpose of evaluating offers and establishing any liability of the successful offeror for increased transportation costs resulting from actual shipping characteristics which differ from those used for evaluation in accordance with paragraph (a) of this clause.
(End of Clause)
RQ009: INSPECTION AND ACCEPTANCE AT ORIGIN
1. The Governments Quality Assurance Representative (QAR) will inspect supplies described by manufacturer's name/code and part number at origin location(s):
a. The QAR may require that objective evidence be furnished establishing the name and address of the plant that manufactures the supplies to ensure that a domestic product is being supplied.
b. Objective evidence of performance must be present for all quality assurance requirements specified in the contract. The QAR may require additional examinations and tests to determine:
i. Completeness of item
ii. Material is new and unused
iii. Absence of rust
iv. Contamination, or deterioration
v. Correct identification/item marking
vi. Correct packaging
vii. Absence of any damage
viii. Compliance with preparation for delivery
2. If the supplier is not the manufacturer of the supplies, objective evidence must be furnished to establish that the supplies were produced by the approved manufacturer.
3. For supplies designated as former Government surplus (whether described by manufacturers name/code and part number, or by Military or
Federal specification or drawing), the original package markings of each item shall be verified to previous Government contract number and part number. Any deviation shall be cause for rejection of the item. The Procuring Activity may add additional inspection requirements based on the evaluation of the surplus offer. Such additional requirements will be identified before the award.
(End of TQ Requirement)
F-16 52.211-9020 TIME OF DELIVERY ACCELERATED (JUN 2008)
Unless otherwise authorized in the award, accelerated delivery is acceptable only if there is no additional cost or obligation to the
Government for accelerated delivery.
*** END OF NARRATIVE F0001 ***
15 42
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
CONTRACT ADMINISTRATION DATA
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
1 252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS DEC/2018
(a) Definitions. As used in this clause--
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and
Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and
Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov ; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the
WAWF home page at https://wawf.eb.mil/ .
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer
Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items--
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
THE CONTRACTOR IS ENCOURAGING TO USE THE COMBINATION INVOICE AND RECEIVING REPORT (COMBO) FOR SUBMITTING INVOICES FOR SUPPLIES. THIS
ELIMINATES THE NEED TO SEPERATELY PROCESS A RECEIVING REPORT AND INVOICE.
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
N/A
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some Combinations of invoice and receiving report in one step.]
16 42
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC HQ0339
Issue By DoDAAC SPRRA1
Admin DoDAAC S1403A
Inspect By DoDAAC S1403A
Ship To Code SEE DELIVERY ORDER
Ship From Code 1Y249
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) N/A
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and
Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
ACO: Bevelry Viads beverly.s.viads.civ@mail.mil (224) 625-9414
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
17 42
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SPECIAL CONTRACT REQUIREMENTS
H-1 BAR CODE MARKINGS
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -
Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.
H-2 CALIBRATION
The calibration of Test, Measurement and Diagnostic Equipment shall be in accordance with American National Standards Institute/National
Conference of Standards Laboratories (ANSI/NCSL) Z540-3-2006 (General Requirements for Calibration Laboratories and Measuring and Test
Equipment) or ISO 10012:2003 (Quality Assurance Requirements for Measuring Equipment). Terminology shall be as defined by International
Organization for Standardization (ISO) 8402, Quality Management and Quality Assurance - Vocabulary.
H-3 ENG CHG PROPOSAL, VALUE ENG CHG PROPOSAL, REQUEST FOR DEVIATION, REQUEST FOR VARIANCE, ENG RELEASE RECORDS, NOTICE OF REVISION, & SPECIFICATION CHG NOTICE PREPARATION AND SUBMISSION INSTRUCTIONS
1. Contractor initiated Engineering Change Proposals (ECPs), Value Engineering Change Proposals (VECPs), Request for Deviations (RFDs), and Request for Variance (RFVs), collectively referred to as "proposals", shall be prepared, submitted and distributed in accordance with paragraphs 2, 3 and 4 below except as specified in paragraph 5 below.
2. Format.
a. Class 1 ECPs require the "Long Form Procedure" for documenting the change and describing the effects of the change on the suitability and supportability of the Configuration Item (CI). Class I ECPs should be limited to those that are necessary or offer significant benefit to the Government. Class I ECPs are those that affect the performance, reliability, maintainability, survivability, weight, balance, moment of inertia, interface characteristics, electromagnetic characteristics, or other technical requirements in the specifications and drawings. Class I ECPs also include those changes that affect Government
Furnished Equipment, safety, compatibility, retrofit, operation and maintenance manuals, interchangeability, substitutability, replaceability, source control specifications and drawings, costs, guarantees or warranties, deliveries, or schedules. Class II
ECPs are those that do not affect form, fit and function, cost, or schedule of the system CI and do not meet the other criteria described above for Class I ECPs.
b. Long Form Procedure: Class I changes to the CI require that RDMR Form 523, pages 1 through 7 (as applicable), be prepared.
Use of this procedure assures that all effects of the change on the CI are properly addressed and documented to the necessary detail to allow proper evaluation of the proposed change.
c. Short Form Procedure: ECPs and VECPs , which meet the requirements of Class II ECPs, shall be prepared using RDMR Form 523
(page 1 only). Supplemental pages may be used with the form as necessary. The responsible Contract Management Office (CMO) will enter the appropriate data in Block 5 "Class of ECP", Block 6 "Justification Codes", and Block 7 "Priority."
d. The Contractor shall not manufacture items for acceptance by the Government that incorporate a known departure from requirements, unless the Government has approved an RFD. RFDs shall be prepared using RDMR Form 527 or RDMR Form 530 (Type I, see block 5 of the form.)
e. The Contractor shall not submit items for acceptance by the Government that include a known departure from the requirements, unless the Government has approved a RFV. RFVs shall be prepared using RDMR Form 528.
f. Each ECP, RFD or RFV shall be accompanied by a written and signed evaluation prepared by the responsible Defense Contract
Management Agency (DCMA) technical representative. The DCMA written evaluation shall be considered part of the ECP/RFD/RFV proposal.
g. Classification of RFDs/RFVs.
(1) Major RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as major when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving health;
performance; interchangeability; reliability; survivability; maintainability; effective use or operation; weight;
appearance (when a factor); or when there is a departure from a requirement classified as major in the contractual documentation.
(2) Critical RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as critical when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation involving safety or when there is a departure from a requirement classified as critical in the contractual documentation.
(3) Minor RFDs/RFVs. RFDs/RFVs written against CIs shall be designated as minor when the RFD/RFV consists of acceptance of an item having a nonconformance with contract or configuration documentation which does not involve any of the factors listed above in paragraphs g(1) or g(2), or when there is a departure from a requirement classified as minor in the contractual documentation.
h. Proposals shall include sufficient technical data to describe all changes from existing contract requirements.
i. Proposals shall include sufficient justification for making the change, including a statement of contract impact, if the change is not authorized.
j. Proposals for ECPs shall set forth a "not to exceed" price and delivery adjustment acceptable to the Contractor if the
Government subsequently approves the proposal. If approved, the equitable increase shall not exceed this amount.
k. Times allowed for technical decisions for ECP and RFD/RFV proposals will be worked out via mutual agreement between the
Contractor and the Government.
l. The Contractor shall submit, concurrent with the ECP, a separate AMSAM-RD Form 525, "Specification Change Notice" (SCN), for each specification that would require revision if the ECP were approved.
m. Proposals for VECPs shall set forth a "not less than" price and delivery adjustment acceptable to the Contractor if the
Government subsequently approves the proposal. If approved, the savings shall not be less than this amount.
n. The Contractor shall utilize RDMR Form 526, "Engineering Release Record" (ERR) to release new or revised configuration
18 42
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
documentation to the Government for approval.
o. The Contractor shall utilize RDMR Form 524, "Notice of Revision" (NOR) to describe the exact change(s) to configuration documentation specified as a data requirement in the contract. The Contractor shall describe the change using sub- sections entitled "WAS" to describe the current contractual technical requirement and "IS" to describe the proposed new requirement.
3. Submittal. The Contractor shall submit two (2) copies of each proposal to the responsible Administrative Contracting Officer (ACO).
One (1) copy of each proposal shall be returned to the Contractor within (5) working days after receipt by the ACO, stating whether or not the proposal is in compliance with this provision. Any unresolved differences between the ACO and the Contractor concerning ECPs, VECPs, RFVs or RFDs will be submitted to the PCO for resolution. Submittals may be made by electronic means by scanning the appropriate completed forms into a computer or preparing the forms electronically.
4. Distribution.
a. Electronic Distribution. The preferred method of distribution is through the Internet E-mail System to the PCO. Microsoft
Word is required for use with the transmittal letter (E-mail). Required forms will be attached to the E-mail. All forms may be obtained from the Army Contracting Command - Redstone Website (http://www.redstone.army.mil/amrdec/rdmr-se/tdmd/ConfigMgt.htm
) by clicking on "Forms/Checksheets." The forms are in both "Adobe Acrobat" and "Form Flow" formats. In order to access and use the forms, the user must have the "Adobe Acrobat" or "Form Flow" software installed on their computer. Drawings may be scanned into the computer and sent as an attachment. In some cases, because of size, drawings may have to be sent as hard copies or sent under special electronic instructions provided by the PCO. Contractors who do not have access to the Army Contracting
Command - Redstone website will need to contact the PCO, the appropriate Project Office Configuration Management Office, or the
Technical Data Management Division (RDMR-SET) to have the forms sent to their facility.
b. Hard Copy Distribution of Class I or II ECPs and RFD/RFVs, For each Class I or II ECP, or each RFD/RFV that the ACO determines to be in compliance with this provision, the Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any type of change proposal that is submitted to the PCO, the ACO shall immediately submit
DCMA's written evaluation pertaining to the proposed engineering change action to the PCO. Assistance in preparing any of these proposals may be obtained from the ACO or AMCOM Change Control Point at:
Aviation and Missile Research, Development, and Engineering Center
ATTN: RDMR-SET
Redstone Arsenal, Al 35898-5000
Telephone: 256-876-1335
c. Hard Copy Distribution of VECPs. For each VECP that the ACO determines to be in compliance with this provision, the
Contractor shall submit the original plus five copies to the PCO and one copy to the ACO. Upon receipt of any VECP that is submitted to the PCO, the ACO shall immediately submit DCMA's written evaluation to the PCO. The Contractor shall also submit one copy of the VECP to the Value Engineering Program Manager (VEPM) whose address is below. Assistance in preparing VECPs may be obtained from the VEPM.
Aviation and Missile Research, Development, and Engineering Center
ATTN: RDMR-SEI
Redstone Arsenal, Al 35898-5000
Telephone: 256-876-8163
5. Alternate Format, Submittal or Distribution Process. Proposals may be prepared in a different format, submitted using a different submittal process or distributed in a different manner than specified in paragraphs 2, 3 and 4 above, so long as the alternate approach is in accordance with a Government approved configuration management plan governed by this contract or the PCOauthorizes the alternate format, submittal, or distribution process.
6. Government Acceptance. Acceptance of a proposal by the Government shall be affected by the issuance of a change order or execution of a supplemental agreement incorporating the proposal into the contract unless the PCO authorizes another method of acceptance. The
Government will notify the Contractor in writing if a proposal is determined to be unacceptable.
H-4 REVISIONS TO DRAWINGS/PART NUMBERS
(a) Sources in receipt of this solicitation are requested, at no cost to the Government, to immediately notify the Contracting Officer if they are aware of any change(s)/revision(s) to the drawing(s) or part number(s) in this solicitation which have been approved by the
Government for implementation. Notification of part number changes shall be supported by data which indicates the type of change, approving authority as required by ANSI EIA 649 MIL-STD-973 and date and method of submittal of provisioning documentation and drawings.
If complete data package has not been previously provided, the contractor shall, at no direct cost to the Government, immediately submit applicable drawings, along with a copy of the approval change authority, to the Contracting Officer, at the office symbol and mailing address listed in the "ISSUED BY" block on page one (1) of this document. The minimum acceptable data includes the next higher assembly and the item of Supply Detail Drawings which will allow provisioning, National Stock Number assignment and updating of AMCOM's data records.
(b) The contractor hereby verifies previous contractual submission of technical data:
Contract No.: _____________________________________________________
Contractor: _______________________________________________________
Explanation of Data Rights: __________________________________________
(c) The Government is not by this request soliciting, nor is the Government liable for cost incurred by the offeror in preparing or
19 42
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
developing modifications, deviations, waivers, or other changes to drawings or part number(s). Furthermore, this request does not authorize changes to the drawing(s) or part number(s) for this acquisition, another contract, or for any other purpose. Offerors performing any contract awarded as a result of this solicitation must comply with the drawing(s) and specifications as set forth herein, unless this solicitation is amended or any resulting contract is modified by the Contracting Officer.
(d) All proposed part number changes shall be submitted pursuant to the requirements of the clause entitled, "Engineering Change
Proposal (ECP), Value Engineering Change Proposal (VECP), Request for Deviation (RFD), and Request for Waiver (RFW) (USAAMCOM).
H-5 WOOD PACKING MATERIALS REQUIREMENTS
A. Wood packaging material (WPM) means wood pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. The definition excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSD).
B. All Wood Packaging Material (WPM)) acquired by DOD must meet requirements of International Standards for Phytosanitary Measures
(ISPM) 15, "Guidelines for Regulating Wood Packaging Materials International Trade." DOD shipments inside and outside of the United
States must meet ISPM 15 whenever WPM is used to ship DOD cargo.
(1) All WPM shall comply with the official quality control program for heat treatment (HT) or kiln dried heat treatment (KD HT) in accordance with American Lumber Standard Committee, incorporated (ALSC) Wood Packaging Material Program and WPM Enforcement
Regulations (see http://www.alsc.org/ ).
(2) All WPM shall include certification/quality markings in accordance with the ALSC standard. Marking shall be placed in an unobstructed area that will be readily visible to inspectors. Pallet markings shall be applied to the stringer or block on diagonally opposite sides of the pallet and be contrasting and clearly visible. All containers shall be marked on a side other than the top or bottom, contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp.
C. Failure to comply with the requirements of this restriction may result in refusal, destruction, or treatment at entry. The Agency reserves the right to recoup from the Contractor any remediation costs incurred by the Government.
D. Replacement Preservative for Pentachlorophenol
If packaging requirements of this contract specify the use of wood products and a preservative is required, Pentachlorophenol, commonly referred to as "Penta" or "PCP" is prohibited. Replacement preservatives are 2 percent copper naphthenate, 3 percent zinc naphthenate or
1.8 percent copper 8 quinolinolate.
(1) Heat Treatment: Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All non-manufactured wood used in packaging shall be heat treated to a core temperature of 56 degrees Celsius for a minimum of 30 minutes. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall be affiliated with an inspection agency accredited by the board of review of the American Lumber Standard Committee. The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure traceability to the original source of heat treatment.
(2) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention
Standard. The quality mark shall be placed on both ends of the outter packaging, between the end cleats or end battens: on two sides of the pallet. Foreign manufacturers shall have the heat treatment of non-manufactured wood proces verified in accordance with their National Plant Protection Organization's compliance program. In addition, wood used as dunnage for blocking and bracing shall be ordered with ALSC certified marking for dunnage or the markings may be applied locally at two foot intervals.
H-6 POINT OF PRESERVATION, PACKAGING, PACKING AND MARKING OF SUPPLIES
Preservation, packaging, packing and marking of supplies will be performed at the following location:
TBD
H-7 SOURCES ELIGIBLE FOR AWARD CONSIDERATION
(a) Competition under this solicitation is restricted to the following sources:
(1) Approved Sources listed in Section B -- sources that have been approved by the prime manufacturer or the Government for supply of item(s) listed in this solicitation, to assure the requisite safe, dependable, effective operation and support of military equipment;
(2) Sources that have been approved prior to award -- other than approved sources listed in Section B;
(3) Non-manufacturers--offers from non-manufacturers (distributors) will only be considered for award if the required item(s) is new material and has been or will be obtained from a source of supply which has been approved prior to award. The source and part number of the item the offeror intends to supply must be stated in the offer.
(4) Surplus Dealers--offerors of Government surplus in accordance with Section I clause entitled "Material Requirements, FAR
52.211-5, will only be considered for award if the former Government surplus or residual inventory resulting from terminated contracts was originally manufactured by an approved source of supply.
(b) Only offers submitted by the above sources will be considered for award under this solicitation.
(c) Offerors (prospective manufacturers or non-manufacturers [distributors]) who wish to become an approved source of supply for an item listed in this solicitation should proceed per the instructions set forth in paragraph (d) below. It is noted that offeror requests for
20 42
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
source approval in conjunction with this procurement will not be a cause for delay in this solicitation action. However, if it is determined that additional sources will clearly benefit the Government and that any delay incident to their approval would not impact readiness, a reasonable delay may be entertained. Whether or not such delay will occur will be solely at the discretion of the
Government, and the time set for opening of the Invitation for Bids or the closing date of the Request for Proposals may or may not be extended. An extension will be witnessed by issuance of an amendment to this solicitation.
(d) Offerors (prospective manufacturers or non-manufacturers [distributors]) seeking to obtain source approval, must submit a Source
Approval Request (SAR) package, for review and approval, to the Engineering Directorate (ED), Quality Engineering Division. Source approval must be obtained prior to being considered for contract award. Approvals are made on an individual part number basis for a specific manufacturing location (CAGE). Firms are encouraged to seek source approval in order to compete for future solicitations by following the SAR submission guidance provided on the website http://amcomdmz.redstone.army.mil/casl_cmo/casldba.casl_cmo_samsar .
Questions concerning SAR submissions can be directed to the ED SAR Team at EDSAR@amrdec.army.mil or call the SAR Team at 256-313-8978, 256-313-0341, or 256-313-8994.
(e) The Aviation and Missile Lifecycle Management Command (AMCOM) may require additional data, testing, or plant visits before it is able to completely evaluate a SAR. This may require the offeror (at no expense to the Government) to supply parts for testing, engine run up, or flight tests. In that event, the requestor will be so advised.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .