SPRRA1-19-R-0031_MOD_1.pdf

PDF 17 KB Posted

Attached to
BEARING, ROLLER, CYLI Federal contract opportunity
Solicitation number
SPRRA1-19-R-0031
Issued by
Defense Logistics Agency Aviation

About this file

Solicitation amended to extend due date to 31 December 2018.

View the file

Other files for this federal contract opportunity

Other files attached to BEARING, ROLLER, CYLI, newest first.
File Type Posted
Revised_Synopsis_AX8T2125AX.pdf PDF
SPRRA119R0031(Ktr.).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

SPRRA1

DEFENSE LOGISTICS AGENCY

5201 MARTIN ROAD/DLA-AVN-AH

REDSTONE ARSENAL AL 35898-7340

ROBERT DALLAS

EMAIL: ROBERT.M.DALLAS@DLA.MIL

SPRRA1-19-R-0031

2018OCT26

X

X 2018DEC31 04:30pm

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 3

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: ROBERT DALLAS

Buyer Office Symbol/Telephone Number: DLA-AVN-AHAA/(256)842-1898

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

A-1. THIS REQUIREMENT IS FOR LIMITED SOURCE TO SKF USA INC. CAGE CODE: 38443, MPB CORPORATION, CAGE CODE: 78118 AND GENERAL ELECTRIC

COMPANY, CAGE CODE: 99207 IAW 10 U.S.C. 2304 (c)(1) FAR 6.302-1 (a) (2) " A LIMITED NUMBER OF RESPONSIBLE SOURCES, AND NO OTHER TYPE OF

SUPPLIES OR SERVICES WILL SATISFY AGENCY REQUIREMENTS, FULL AND OPEN COMPETITION".

A-2. THIS REQUIREMENT IS IN SUPPORT OF THE UH 60 BLACKHAWK WEAPON SYSTEM.

A-3. FLIGHT SAFETY/CRITICAL SAFETY ITEM (CSI) IS REQUIRED.

A-4. PRODUCTION LOT TESTING (PLT) IS REQUIRED. ALL MANUFACTURING LOTS WILL BE SUBJECTED TO TESTING. DESTRUCTIVE TEST REQUIRED. 1 ITEM

WILL BE DESTROYED DURING TESTING.

A-5. CONTRACTOR FIRST ARTICLE TEST (FAT) IS REQUIRED.

A-6. FAT UNIT SHALL NOT BE RETAINED AS A MATERIAL STANDARD. TEST ITEM WILL NOT BE DESTROYED AS PART OF TESTING.

A-7. SNRR MARKINGS ARE REQUIRED.

A-8. TAMMS-A ARE NOT REQUIRED.

A-9. IUID MARKINGS ARE NOT REQUIRED.

A-10. RFID MARKINGS ARE NOT REQUIRED.

A.11. ARMS EXPORT CONTROL IS APPLICABLE. THE TECHNICAL DATA PACKAGE PROVIDED ON CD CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY

THE ARMS EXPORT CONTROL ACT (TITLE 22 U.S.C., SEC 2751 ET SEQ.) OR EXECUTIVE ORDER 12470. VIOLATION OF THESE EXPORT LAWS ARE SUBJECT TO

SEVERE CRIMINAL PENALTIES.

A-12. SERIAL NUMBERING IS REQUIRED.

A-13. FIT CHECK IS NOT REQUIRED.

A-14. THIS IS A ONE-TIME BUY (OTB), FIRM FIXED PRICE EFFORT.

A-15. CONTRACTOR POINT OF CONTACT INFORMATION:

NAME: ___________________________________

TELEPHONE NUMBER: ___________________________________

E-MAIL ADDRESS: ________________________________________

A-16. DCMA ACO POINT OF CONTACT INFORMATION:

NAME: ___________________________

TELEPHONE NUMBER: ______________________________

E-MAIL ADDRESS: _______________________________________________

A-17. CONTRACT SPECIALIST POINT OF CONTACT INFORMATION:

NAME: ROBERT DALLAS _____________

OFFICE SYMBOL: DLA-AVN-AHAA ____________

TELEPHONE NUMBER: 256-842-1898_______ ___________________

E-MAIL ADDRESS: ROBERT.M.DALLAS@DLA.MIL _______________________

A-18. ACCELERATED DELIVERY IS ENCOURAGED AND AUTHORIZED AT NO ADDITIONAL COST TO THE GOVERNMENT.

A-19. HISTORY FOR COMPETITIVE BUYS: SPRRA1-17-P-0010/0001AA 10 EA MPB CORPORATION, CAGE CODE: 78118 DATE:13 DECEMBER 2016.

2 3

SPRRA1-19-R-0031

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A.20. REVERSE AUCTION EVALUATION IS INCLUDED ON THIS REQUIREMENT, REFER TO NARRATIVE L09 INCLUDED IN SECTION L.

A-21. CONTRACTOR FIRST ARTICLE TEST

Number of Samples to be tested = 1__ ___

Deliver FOB: Destination

Inspection: Origin

Acceptance:: Destination (By the PCO)

BY: 108 DACA__ __________

Ship To:DLA Aviation Huntsville - AHAA

ATTN: Post Award Team (DLAHSVPostAwardTeam@dla.mil)

7408 Warehouse Rd

Redstone Arsenal, AL 35898

(With an information copy to the Administering Contracting Officer)

Recommended Delivery Schedule within

108 Days ARO: Contractor First Article completed and Report Submission

45 Days: Government Review and Notification to Contractor

27 DAFAA: Delivery of Production Units______________________________________

180 DARO

FIRST ARTICLE TEST TIME IS 3 DAYS. UNITS TO BE TESTED IS 1 EACH. FIRST ARTICLE TEST SHALL BEGIN ON A MUTUALLY AGREED UPON DATE BETWEEN

THE GOVERNMENT AND THE CONTRACTOR. THE DATE SHALL OCCUR WITH ENOUGH TIME IN ADVANCE TO BEGIN SCHEDULED DELIVERIES 270 DACA. THE __________

CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IN WRITING 30 DAYS PRIOR TO THE PROPOSED DATE OF FIRST ARTICLE TESTING. THE FIRST

ARTICLE TEST REPORT IS DUE 15 DAYS AFTER FAT. THE PREFERRED METHOD OF TRANSMITTAL IS CD. THE GOVERNMENT HAS 45 DAYS TO

APPROVE/DISAPPROVE THE TEST REPORT.

A-22. PLEASE SUBMIT ALL FAT REPORTS, INQUIRIES, AND QUESTIONS TO:

DLA AVN Huntsville - AHAA

Attn: Post Award Team (DLAHSVPostAwardTeam@dla.mil)

7408 Warehouse Road

Redstone Arsenal, AL 35898

PRODUCTION LOT TEST (PLT) ONLY APPLICABLE TO CSI__________________________________________________

THE CONTRACTOR SHALL WITHHOLD (25%) OF THE PRODUCTION LOT QUANTITY PENDING ESA APPROVAL OF THE LOT FOR USE. THE BALANCE OF 75% OF THE

PRODUCTION LOT MAY BE SHIPPED PRIOR TO ESA APPROVAL. WITHIN 120 CALENDAR DAYS AFTER THE GOVERNMENT RECEIVES THE QUALITY VERIFICATION

SAMPLE(S), THE CONTRACTING OFFICER WILL NOTIFY THE CONTRACTOR, IN WRITING, OF THE ACCEPTANCE OR REJECTION OF THE QUALITY VERIFICATION

SAMPLE(S). THE NOTICE OF ACCEPTANCE SHALL NOT RELIEVE THE CONTRACTOR FROM COMPLYING WITH ALL REQUIREMENTS OF THE SPECIFICATIONS AND ALL

OTHER TERMS AND CONDITIONS OF THIS CONTRACT. A NOTICE OF REJECTION SHALL CITE REASONS FOR THE REJECTION.

NOTICE: YOUR ATTENTION IS INVITED TO FEDERAL ACQUISITION REGULATION (FAR) 15.403-3, RELATIVE TO THE REQUIREMENTS FOR OBTAINING OTHER

THAN CERTIFIED COST OR PRICING DATA. IF THIS IS CONSIDERED TO BE A SOLE SOURCE REQUIREMENT; THEREFORE, YOU ARE REQUIRED TO SUBMIT OTHER

THAN COST AND PRICING DATA, IF REQUESTED. OFFEROR MAY USE THEIR OWN FORMAT TO PROVIDE, AT A MINIMUM, A BREAKDOWN OF ALL THE COST

ELEMENTS TO INCLUDE PROFIT/FEE WHICH COMPROMISE THE TOTAL PROPOSED PRICE OR SALES HISTORY. FAILURE TO PROVIDE OTHER THAN COST AND

PRICING DATA WILL RESULT IN YOUR OFFER BEING CONSIDERED NON-RESPONSIVE.

FOR LONG LEAD TIME ITEMS AND/OR LONG TERM CONTRACTS, THE PARTIES RECOGNIZE THERE IS A RISK THAT PART(S) OR COMPONENT(S) REQUIRED FOR

PERFORMANCE OF THE CONTRACT/PURCHASE ORDER MAY BECOME UNAVAILABLE DUE TO OBSOLESCENCE. UPON RECEIPT OF THE CONTRACT/PURCHASE

ORDER,CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS SOURCES OF SUPPLY. IF AT ANY TIME DURING THE COURSE OF PERFORMANCE CONTRACTOR BECOMES

AWARE THAT IT IS UNABLE TO PROCURE A PART OR COMPONENT NECESSARY TO FULFILL THE REQUIREMENTS OF THE CONTRACT, THE CONTRACTOR SHALL

NOTIFY THE CONTRACTING OFFICER IN WRITING WITHIN THIRTY DAYS. NOTIFICATION SHALL INCLUDE CONTRACTORS RECOMMENDATION FOR CORRECTION OF

THE PROBLEM,IF POSSIBLE, WITH ESTIMATED COST AND SCHEDULE IMPACT, IF ANY. THE CONTRACTING OFFICER WILL DETERMINE THE APPROPRIATE COURSE

OF ACTION AND PROVIDE DIRECTION TO THE CONTRACTOR. IN NO EVENT WILL THE CONTRACTOR PROCEED WITH IMPLEMENTATION OF ITS RECOMMENDATION

WITHOUT WRITTEN DIRECTION FROM THE CONTRACTING OFFICER. AT THE SOLE DISCRETION OF THE CONTRACTING OFFICER, THE CONTRACT MAY BE

TERMINATED IN WHOLE OR IN PART, AS APPROPRIATE.

*** END OF NARRATIVE A0001 ***

3 3

SPRRA1-19-R-0031

SECTION A

File details come from the government source that posted it.