Springfield Fiber Infrastructure Questions and Answers Set 1.docx
DOCX document 18 KB Posted
- Attached to
- ILSOS Fiber Infrastructure Solution State and local contract opportunity
- Solicitation number
- 25-350SOS-ITSOS-B-47567
- Issued by
- Sangamon County, Illinois
About this file
The document is a Questions and Answers (Q&A) set for the Springfield Fiber Infrastructure Solution project involving the Illinois Secretary of State's Office (ILSOS). The Q&A addresses five specific technical inquiries about the fiber infrastructure installation, confirming the presence of network racks at both project endpoints, an existing but non-direct riser stack, the need for some core drilling, and clarifying termination requirements. The responses indicate that ILSOS will provide racks, but vendors will need to supply LIU (Line Interface Unit) panels for the project.
The Q&A document complements the broader procurement details, which outline a fiber connectivity project between two government facilities at 2701 Dirksen Parkway and 501 S. 2nd Street. The contract is structured to run from execution date to June 30, 2028, with a maximum term of ten years. Vendors must be prepared to work in government locations with potential asbestos environments, though no asbestos abatement is required. The procurement will be conducted electronically through BidBuy, with bid submissions due by May 8, 2025, and award determined by the lowest responsive and responsible bidder. Key project requirements include providing fiber strands, termination equipment, installation materials, and associated troubleshooting services, with an emphasis on modernizing the state's existing network infrastructure.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| IPG Active Registered Vendor Disclosure formerly Forms B v.23.1~24.docx | DOCX document | |
| Vendor Disclosure v 24.1 Formerly Forms A~1.docx | DOCX document | |
| Springfield Fiber Run IFB Document B-47567.docx | DOCX document | |
| Howlett Building Fiber Run Updated IFB Document B-47567.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question Set 1 Springfield Fiber Infrastructure Solution
25-350SOS-ITSOS-B-47567
1. Are there network racks at both ends of this fiber run that our terminations and enclosures will go into?
a. Answer: Yes, there will be racks at both ends.
2. Do you know if there is an existing unprotected riser stack, or will one need to be built?
a. Answer: There is a riser stack from the 2nd floor to basement, but it is not directly to the room requested.
3. Should route be in protected closet are sleeves in place or will cores be needed?
a. Answer: Cores will be needed but not for the entire route.
4. Any backboards or outlets needed?
a. Answer: No.
5. Are we terminating into patch panels? If so, are racks in place or will we need to provide them?
a. Answer: Yes, ILSOS will have racks, but the LIU panels will be required.