This document contains questions and answers related to solicitation number SPRHA223R0297 for Minuteman Missile cable assemblies. The solicitation seeks cable assemblies and related parts for Minuteman missiles from small businesses. Key details include that the technical data package is available for review, first article units will be tested for fit and electrical function with no destructive testing anticipated, and vendors may assemble conduit assemblies from purchased parts if able to do so without special tooling and for less than $150 in costs. Testing procedures may be clarified with vendors for advice.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SPRHA223R0297_______0002.pdf | ||
| 297 Questions 6-8-23 CUI.pdf | ||
| 297 Questions 5-16-23 CUI.pdf | ||
| SPRHA223R0297_______0001.pdf | ||
| SPRHA223R0297.pdf | ||
| All_EDRs.pdf | ||
| FATRs.pdf | ||
| CPP.pdf | ||
| All_EDLs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions related to SPRHA2‐23‐R‐0297
3/27/23
Q: Is there supplier for these parts?
RFE23050498‐001 Adapter Connector (Top Dwg: NSN: 5995‐01‐685‐2681) RFE23050497‐001 Adapter, IFD, Backshell (Top Dwg: NSN: 5995‐01‐685‐0827)
A: Both parts mentioned are custom machined parts. The dimensions and raw material are all included on the drawing. Any vendor looking to manufacture the cable will need to get a quote for these items
5/16/23
Q: Will the original first article unit be returned to the contractor for updating?
A: The original first article will be held by the FA lab until the vendor coordinates with the FA lab on what they would like to do. The first article may be sent back the vendor if that is what they want, it will be between them and the FA lab.
Q: Can the Government elaborate on the testing identified and how the contractor should address any risks associated with unknown testing requirements?
A: The testing for these cables consists of making sure they fit in the fixture and function correctly electrically. There should not be any destructive testing, spare parts support, or repair required for any cable first articles.
Q’s:
1) Please clarify the requirement for the contractor to provide operating and maintenance instructions from the TDP provided for this solicitation.
2) Please provide clarification of the spare parts support requirement.
3) Similar to the question from subparagraph “e”, can the Government elaborate on the testing identified and how the contractor should address any risks associated with unknown testing requirements?
A: The testing for these cables consists of making sure they fit in the fixture and function correctly electrically. There should not be any destructive testing, spare parts support, or repair required for any cable first articles. The purpose of this clause is to make the vendor aware that the government may require collaboration on testing procedures. The vendor may be contacted for advice/suggestions during
FA testing.
CUI
Controlled by: DLA Aviation Ogden Controlled By: AUBA
CUI Category: Controlled Tech Info Distribution/ Dissemination Control: FEDCON
POC: michelle.mihu@us.af.mil
Questions related to SPRHA2‐23‐R‐0297
6/9/23
Q: Unable to obtain a quote for any of the PN RFE23050499‐xxx conduit assemblies, however the parts to make them are available. Can the parts be purchased and assembled? Assuming no special tooling is required in the assembly of these items or if there is, the cost is less than $150.
A: If able to assemble RFE23050499‐XXX without the 23035592 drawing, yes. Contractors can get the parts from Sunbank, since Sunbank was willing to quote the parts, and then do the assembly themselves if they are able to. Contractors could also contact Sunbank about providing the P.S. 04M00018 drawing along with the purchased parts. This is the Sunbank drawing that is equivalent to 23035592. It could be that P.S. 04M00018 is an instruction page that comes with purchase of the parts automatically. The USG has no way of knowing what is on the drawing, or how necessary it is, since neither Lockheed or
Sunbank would provide it to us.